Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

NB/T 20010.10-2010 English PDF

US$939.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 20010.10-2010: PWR nuclear power plant valve. Part 10: Stress analysis and seismic analysis
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
NB/T 20010.10-2010939 Add to Cart 6 days PWR nuclear power plant valve. Part 10: Stress analysis and seismic analysis Valid

Similar standards

NB/T 20015   EJ/T 350   EJ/T 424   NB/T 20010.17   NB/T 20010.16   NB/T 20010.11   

Basic data

Standard ID: NB/T 20010.10-2010 (NB/T20010.10-2010)
Description (Translated English): PWR nuclear power plant valve. Part 10: Stress analysis and seismic analysis
Sector / Industry: Energy Industry Standard (Recommended)
Classification of Chinese Standard: F69
Classification of International Standard: 27.120.20
Word Count Estimation: 38,376
Date of Issue: 2010-05-01
Date of Implementation: 2010-10-01
Older Standard (superseded by this standard): EJ/T 1022.14-1996
Quoted Standard: GB/T 16702-1996; NB/T 20010.1-2010
Regulation (derived from): ?National Energy Board Announcement 2010 No.1; Industry Standard Filing Announcement 2010 No.7 (Total No.127)
Issuing agency(ies): National Energy Administration
Summary: This standard specifies the method of PWR nuclear power plant valves and seismic analysis, stress analysis and stress assessment guidelines to ensure the integrity of the valve structure includes a pressure boundary. This section applies to security-related nominal diameter DN �� 25mm valve 's. Seismic analysis of the rules applicable to the seismic class �� valves, also applies to other valves are seismic requirements. Valve stress analysis rules proposed in this section do not apply to the safety valve and pressure relief valve.
Image