Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

NB/T 10884.3-2021 English PDF

US$419.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 10884.3-2021: Buried polyethylene (PE) pipes and fittings for gathering and transportation of coalbed methane - Part 3: Welding and detection
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
NB/T 10884.3-2021419 Add to Cart 4 days Buried polyethylene (PE) pipes and fittings for gathering and transportation of coalbed methane - Part 3: Welding and detection Valid

Similar standards

GB/T 18604   SY/T 0556   GB/T 9109.5   NB/T 10884.2   NB/T 10884   NB/T 10884.1   

Basic data

Standard ID: NB/T 10884.3-2021 (NB/T10884.3-2021)
Description (Translated English): Buried polyethylene (PE) pipes and fittings for gathering and transportation of coalbed methane - Part 3: Welding and detection
Sector / Industry: Energy Industry Standard (Recommended)
Classification of Chinese Standard: E98
Classification of International Standard: 83.140
Word Count Estimation: 19,149
Date of Issue: 2021-12-22
Date of Implementation: 2022-03-22
Issuing agency(ies): National Energy Administration
Summary: This standard specifies the terms and definitions, qualification requirements, welding equipment, polyethylene piping components, basic requirements for welding operations, inspection and test requirements for welding and testing of buried polyethylene (PE) piping systems for coalbed methane gathering and transportation. The connection methods of the pipeline system include electrofusion connection and hot fusion butt joint. This standard is applicable to the installation and inspection of joints of buried polyethylene (PE) piping systems for coalbed methane gathering and transportation.
Image