NB/T 10351-2019 English PDFUS$989.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. NB/T 10351-2019: (Regulations for compiling general planning and design report of seismic monitoring of hydropower project reservoir) Status: Valid
Basic dataStandard ID: NB/T 10351-2019 (NB/T10351-2019)Description (Translated English): (Regulations for compiling general planning and design report of seismic monitoring of hydropower project reservoir) Sector / Industry: Energy Industry Standard (Recommended) Word Count Estimation: 44,460 Date of Issue: 2019-12-30 Date of Implementation: 2020-07-01 Issuing agency(ies): National Energy Administration NB/T 10351-2019: (Regulations for compiling general planning and design report of seismic monitoring of hydropower project reservoir)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Specification for Preparation of Reservoir Earthquake Overall Monitoring Planning Report for Hydropower Projects Energy Industry Standards of the People's Republic of China Seismic Monitoring of Hydropower Project Reservoir Rules for the preparation of overall planning and design reports 2019-12-30 released 2020-07-01 implementation ForewordAccording to the National Energy Administration’s issue of the.2014 first batch of industry standards in the energy sector (revision) According to the requirements of the “Notice of Planning” (Guoneng Technology [2014] No. 298), the procedure preparation team has conducted extensive investigations and studies, Summarize practical experience earnestly, and formulate this regulation based on extensive solicitation of opinions. The main technical contents of this regulation are. basic regulations, overview, comprehensive evaluation of reservoir seismic risk, water Reservoir seismic monitoring system project selection and layout design, reservoir seismic monitoring system composition and technical requirements, reservoir Earthquake monitoring system civil engineering planning, reservoir seismic monitoring system operation and maintenance planning, reservoir seismic monitoring System investment estimation. This regulation is managed by the National Energy Administration, proposed by the General Institute of Hydropower and Water Conservancy Planning and Design, and responsible for daily management. Interpretation of specific technical content by the Energy Industry Hydropower Survey and Design Standardization Technical Committee. carried out If you have any comments or suggestions during the process, please send them to the General Institute of Hydropower and Water Conservancy Planning and Design (Address. Sixth, Xicheng District, Beijing Shop No. 2 Kangbei Xiaojie, Zip Code. 100120). Editor-in-chief of this regulation. China Power Construction Group Chengdu Survey, Design and Research Institute Co., Ltd. General Institute of Hydropower and Water Conservancy Planning and Design Participating unit of this regulation. China Power Construction Group Kunming Survey, Design and Research Institute Co., Ltd. The main drafters of this regulation. Zhang Shishu, Wang Huiming, Peng Shixiong, Ran Congyan, Zhang Dongsheng Fan Junxi Chen Weidong Hu Jinshan Wang Jinsheng Xie Jianming Ma Xingdong Wei Zhisheng Li Zhongzhu Huaping Deng Zhongwen Zhang Yong Chen Guangyi Zhao Xiaoping Main reviewers of this regulation. Yang Jian, Guo Decun, Guo Yihua, Li Wengang, Mi Yingzhong Jia Yuxing Zhao Guogang Lu Fei Ju Guanghong Zeng Xiangxi Zhang Guofu Han Jin Chang Zufeng Li Baohua Wang Qincai He Wantong Zhao Yi Du Xiaokai Li ShishengTable of contents1 General...1 2 Terminology...2 3 Basic regulations...3 4 Overview...4 5 Comprehensive evaluation of reservoir earthquake risk...5 6 Project selection and layout design of reservoir seismic monitoring system...6 6.1 General regulations...6 6.2 Monitoring system project selection...6 6.3 Seismic network layout design...6 6.4 Layout and design of other monitoring items...8 7 Composition and technical requirements of reservoir seismic monitoring system...10 7.1 General provisions...10 7.2 Technical requirements for observing system...10 7.3 Technical requirements for transmission system...11 7.4 Technical requirements for data processing system...11 8 Civil Engineering Planning of Reservoir Earthquake Monitoring System...13 9 Operation and Maintenance Planning of Reservoir Seismic Monitoring System...14 10 Investment Estimation of Reservoir Earthquake Monitoring System...15 10.1 Instructions for the preparation of investment estimates...15 10.2 Investment estimation table...15 Appendix A Catalogue for the preparation of the overall planning and design report of reservoir seismic monitoring...16 Explanation of terms used in this regulation...17 List of Reference Standards...18 Attachment. Article description...191 General1.0.1 In order to standardize the compilation of the overall planning and design report of reservoir seismic monitoring, and to ensure the quality of the results, this regulation is formulated Cheng. 1.0.2 This regulation is applicable to the preparation of the overall planning and design report for seismic monitoring of hydropower projects and reservoirs. 1.0.3 The preparation of the overall planning and design report for seismic monitoring of hydropower engineering reservoirs shall not only comply with this regulation, but shall also It complies with the regulations of current national standards.2 term2.0.1 reservoir earthquake Under the special geological background, due to the impoundment of the reservoir, new Seismic activity that is significantly different from the local natural seismic activity. Synonym. Reservoir induced earthquake. 2.0.2 Monitoring area for reservoir earthquake The normal reservoir water level inundation area and its extension of 10km, and the reservoir area around 50km Areas where earthquakes of magnitude 5 or higher have occurred in history. 2.0.3 key monitoring area for reservoir earthquake Reservoir section, head area and active fault distribution area where the reservoir is more likely to induce earthquakes in the reservoir earthquake monitoring area area. 2.0.4 Reservoir earthquake monitoring network A monitoring network or system composed of 4 or more seismic monitoring stations monitoring reservoir earthquakes. 2.0.5 Reservoir earthquake monitoring system A system composed of reservoir seismic monitoring instruments, recording, transmission, and data processing. 2.0.6 repeater station Import the received seismic station signals into the high-speed relay channel and... ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 10351-2019_English be delivered?Answer: Upon your order, we will start to translate NB/T 10351-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of NB/T 10351-2019_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 10351-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |