Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

LST8006-2010 English PDF

US$989.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
LST8006-2010: Regulations to compile feasibility study report of grain engineering project
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
LS/T 8006-2010989 Add to Cart 6 days Regulations to compile feasibility study report of grain engineering project Valid

Similar standards

GB/T 8478   GB/T 50046   SN/T 4233   LS/T 8011   LS/T 8009   LS/T 8008   

Basic data

Standard ID: LS/T 8006-2010 (LS/T8006-2010)
Description (Translated English): Regulations to compile feasibility study report of grain engineering project
Sector / Industry: Food & Beverage Industry Standard (Recommended)
Classification of Chinese Standard: P35
Classification of International Standard: 91.040.20
Word Count Estimation: 40,481
Date of Issue: 2010-04-07
Date of Implementation: 2010-07-01
Regulation (derived from): National Food Authority Notice 2010 No. 3
Issuing agency(ies): National Grain Administration
Summary: This standard applies to grain, oilseeds and their products as raw materials storage, processing and distribution facilities construction project feasibility study report.

LST8006-2010: Regulations to compile feasibility study report of grain engineering project

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Regulations to compile feasibility study report of grain engineering project Book UDC People's Republic of China food engineering construction industry standard Depth regulations for the preparation of the feasibility study report for food engineering Released on.2010-04-07 2010-07-01 implementation National Food Bureau released

Content

Foreword III 0 General 1 1 General 1 1.1 Project Overview 1 1.2 Overview of the construction unit 2 1.3 Basis and Principle 2 1.4 Main research conclusions and recommendations 2 2 Project background and necessity 3 2.1 Background proposed by the project 3 2.2 Necessity of project construction 3 3 Market Forecast 3 3.1 Market Status and Forecast 3 3.2 Target Market Analysis 4 3.3 Price Status and Forecast 4 3.4 Market Competitiveness Analysis 4 4 Construction scale and product plan 4 4.1 Construction scale 4 4.2 Product Solution 5 5 site selection 5 5.1 Site Status 5 5.2 Site construction conditions 5 5.3 Site plan comparison 6 6 Engineering Technology Plan 6 6.1 General Map Transportation 6 6.2 Process 8 6.3 Building and structure 8 6.4 Electrical 9 6.5 Water supply and drainage 9 6.6 Heating, Ventilation and Air Conditioning 9 6.7 Power 10 7 Energy saving and water saving 10 7.1 Energy saving 10 7.2 Water saving 10 8 Environmental Protection 11 8.1 Basis for preparation 11 8.2 Status of the site environment 11 8.3 Major pollutants produced during the production process of the project and their impact on the environment 11 8.4 Main measures to prevent environmental pollution and their expected effects 11 8.5 Environmental Monitoring 12 8.6 Environmental Protection Investment 12 9 Labor safety, industrial hygiene and fire protection 12 9.1 Labor Safety 12 9.2 Industrial Hygiene 12 9.3 Fire 12 10 Organization and Human Resources Configuration 13 10.1 Organization 13 10.2 Human Resources Configuration 13 11 Project implementation progress and tender proposals 14 11.1 Project Implementation Progress 14 11.2 Project Tendering Proposal 14 12 Investment Estimation and Financing Options 15 12.1 Investment Estimation 15 12.2 Financing Programme 16 13 Financial Evaluation 21 13.1 Selection of financial evaluation methods 21 13.2 Basis for preparation 21 13.3 Basic data and parameter selection and related instructions 21 13.4 Income and Tax Estimate 21 13.5 Cost Estimate 21 13.6 Financial Evaluation 22 13.7 Uncertainty analysis 22 13.8 Financial Evaluation Conclusion 23 14 National Economic Evaluation and Social Assessment 34 14.1 National Economic Evaluation 34 14.2 Social Assessment 34 15 Risk Analysis 34 15.1 Identification of major risk factors 34 15.2 Risk Analysis and Evaluation 34 15.3 Risk prevention and risk reduction measures 34 16 Conclusions and recommendations 34 16.1 Conclusion 34 16.2 Recommendation 34 Drawings and Annexes 35

Foreword

The basis for the preparation of this regulation is mainly the five food items issued by the Office of the State Grain Administration regarding the issuance of the Code for the Design of the Grain Depot Management Information System. Notice on the Compilation of Engineering Construction Standards (Guoliang Office Exhibition [2007] No. 211), the original National Development Planning Commission issued the "Investment Project Guide to Conductive Research, “Methods and Parameters for Economic Evaluation of Construction Projects (Third Edition)” issued by the National Development and Reform Commission. In the process of preparation, the writing team carefully summarized the experience of the preparation of the feasibility study report for food engineering, and referred to the “Food Engineering Design Document”. In-depth provisions on the preparation of the depth of preparations and other industry feasibility study reports, extensive consultations on consulting, design, supervision, enterprises, and The opinions of political management and other units and experts will be reviewed and finalized by the expert review meeting. The main contents of this regulation are from general rules, general theory, project background and necessity, market forecast, construction scale and product plan, site selection, and work. Technical solutions, energy and water conservation, environmental protection, labor safety, industrial hygiene and fire protection, organization and human resource allocation, project implementation And tender proposals, investment estimates and financing options, financial evaluation, national economic evaluation and social evaluation, risk analysis, conclusions and recommendations, etc. 17 parts. This regulation is managed by the State Grain Administration, and the International Trade Engineering Design Institute is responsible for the interpretation of specific content. All units are required to implement this regulation, Combine the actual work, sum up experience, and accumulate information. If you find that you need to modify and supplement, please feedback your opinions and suggestions to Guomao Engineering Design. Courtyard (11 Million Street, Xicheng District, Beijing, Zip code 100037, fax 010-58523572). Chief editor. International Trade Engineering Design Institute. Participating unit. Zhengzhou Cereals, Oils and Foodstuffs Engineering Design and Design Institute. Main drafters. Liu Jihui, Zhao Xiaojin, Liu Lihua, Qiu Ping, Zheng Moli, Liu Chang, Zhou Zhixin, Hao Weihong, Wu Guosheng, Li Dongfang, Qiao Rongming. Depth regulations for the preparation of the feasibility study report for food engineering 0 General 0.0.1 To stipulate the depth of preparation of the feasibility study report of the grain project and ensure the quality and integrity of its preparation, this regulation is formulated. 0.0.2 This regulation applies to the feasibility study of warehousing, processing and distribution facilities construction projects using grain, oilseeds and their products as raw materials. Preparation of the report. 0.0.3 Principles and related requirements for the preparation of the feasibility study report 1 Must comply with national laws, regulations and regulations; implement relevant standards, norms and procedures in the countries, industries and areas where the project is located; 2 Feasibility studies must be realistic and adhere to objectivity, impartiality and scientificity; 3 Reflecting the state's requirements for the safety of food and its products; rational use of resources, land conservation, energy conservation, environmental protection and public protection interest; 4 For foreign-related projects such as overseas projects, foreign investment, joint ventures and cooperation, in addition to the implementation of these regulations, they shall also implement relevant national laws and regulations. And in line with the contract and agreement documents signed by the parties to the investment; 5 If the competent department has special requirements for the preparation of the feasibility study report of the project, it shall be prepared according to its requirements; When the contract of the research report requires otherwise, the requirements of the contract shall be met; 6 For independent projects involving docks, railways, off-site roads, etc., additional explanations should be made in the relevant sections; 7 The feasibility study report shall have the signature of the preparation unit and the registered consulting engineer and the signature of the main technical person in charge. By multiple units Collaborate on the feasibility study project, the overall responsible organization should be responsible for the depth, quality and integrity of the feasibility study report preparation; 8 In the implementation of these Provisions, if the State provides otherwise, it shall be prescribed. 0.0.4 Basic requirements for the depth of content of the feasibility study report 1 The compilation is based on reliable, complete content, accurate data, sufficient argumentation, clear conclusions, and standardized formats. Schedules, annexes and drawings should be complete. Meet the requirements of the decision makers to set the project; 2 The main technical and economic programs in the feasibility study should have a comparison of two or more programs; 3 The technical parameters such as the performance and specifications of the main equipment proposed shall meet the requirements for the equipment reservation; the information on the introduction of technology and equipment shall be Meet the requirements of contract negotiation; the main raw and auxiliary materials, fuel, power and other data should meet the requirements of the foreign agreement; 4 The project's investment estimate, financing plan and financial evaluation should meet the credit decision requirements of financial institutions such as banks; 5 The main engineering and technical data determined shall meet the requirements for the preliminary design of the project.

1 General

1.1 Project Overview 1.1.1 Project Name The full name of the project. 1.1.2 Project Management Department The full name of the project authority or major investor. 1.1.3 Construction unit The full name, address and legal representative of the construction unit. For Sino-foreign joint venture or cooperative business projects, the names of the parties, the country of registration, the address, and the law must be indicated. Representatives and nationality. 1.1.4 Project construction site Explain the detailed construction location of the project.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of LST8006-2010_English be delivered?

Answer: Upon your order, we will start to translate LST8006-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of LST8006-2010_English with my colleagues?

Answer: Yes. The purchased PDF of LST8006-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.