JJG 247-2008 English PDFUS$529.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 247-2008: Verification Regulation of Standard Incandescent Lamp for Total Luminous Flux Status: Valid JJG 247: Historical versions
Basic dataStandard ID: JJG 247-2008 (JJG247-2008)Description (Translated English): Verification Regulation of Standard Incandescent Lamp for Total Luminous Flux Sector / Industry: Metrology & Measurement Industry Standard Classification of Chinese Standard: A60 Classification of International Standard: 17.180 Word Count Estimation: 23,234 Date of Issue: 2008-03-25 Date of Implementation: 2008-09-25 Older Standard (superseded by this standard): JJG 247-1991 Quoted Standard: GB 15039-1994; GB 15040-1994; JJG 213-2003; JJF 1002-1998; JJF 1059-1999 Regulation (derived from): ?AQSIQ Announcement 2008 No.35 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine Summary: This standard applies to initial verification AC bridge, follow-up test and use the test. AC bridge operating frequency is limited to within the range of 20Hz to 100kHz, the working voltage is less than 500V, accuracy range of 0. 001 and below. This procedure does not apply to high-voltage bridge, verification LCR impedance meter and automatic balancing of the bridge. JJG 247-2008: Verification Regulation of Standard Incandescent Lamp for Total Luminous Flux---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Verification Regulation of Standard Incandescent Lamp for Total Luminous Flux State verification procedures People's Republic of China The total flux standard incandescent Posted 2008-03-25 2008-09-25 implementation The State Administration of Quality Supervision, Inspection and Quarantine released The total flux standard incandescent test procedures Replacing JJG 247-1991 The regulations by the State Administration of Quality Supervision, Inspection and Quarantine approved on March 25, 2008, and from From September 25, 2008 into effect. Focal point. the National Technical Committee on Optical metrology Drafting units. China Institute of Metrology This procedure committee commissioned by the National Optical measurement technology is responsible for interpreting The drafters of the regulations. Emily (China Institute of Metrology) Yang Chen cast (China Institute of Metrology) This procedure drafters participate. Xiao Wenbin (China Institute of Metrology) table of Contents1 Scope (1) 2. Referenced Documents (1) 3 Overview (1) 4 metering performance requirements (1) 4.1 Stability of the total flux standard lamps (1) 4.2 rating total luminous flux standard lamps (1) 4.3 total luminous flux standard composition and magnitude of the expanded uncertainty (2) 5 General Requirements (2) 5.1 Appearance (2) 5.2 The label (2) 6 Control of measuring instruments (2) 6.1 Verification condition (2) 6.2 Verification Project (4) 6.3 Verification Methods (5) Processing 6.4 Verification Results (7) 6.5 test cycle (7) Appendix A domestic total luminous flux standard incandescent photovoltaic parameters (8) B BDT Standard light stability test method Appendix (9) Appendix C measuring system instability correction factor calculation method (10) Appendix D nonlinear correction factor calculation method (11) Appendix E absorption photometer spherical correction factor measuring method (12) Appendix FV (λ) calculated mismatch correction (13) Appendix G Recommended integrating sphere coating formulation (14) Appendix H Examples of uncertainty analysis (15) Appendix I of the total luminous flux standard incandescent calibration certificate and test results of notice (in-page) format (18) The total flux standard incandescent test procedures1 ScopeThe order applies to work on benchmarks and primary, secondary, total luminous flux standard incandescent lamp (hereinafter referred to as flux standard lamp Or standard lamp) verification. Standard lamp type evaluation, the requirements for performance measurement can be implemented by reference.2 CitationsGB 15039-1994 "luminous intensity and luminous flux standard lamp" GB 15040-1994 "ordinary photometric standard bulb" JJG 213-2003 "distribution (color) temperature standard lamp test procedures" JJF1002-1998 "national verification procedures to write rules" JJF1059-1999 "Evaluation and Expression of Uncertainty in Measurement" When using this procedure, it should pay attention to using the currently valid version of the documents cited.3 OverviewTotal luminous flux standard lamp is used to maintain and the total flux transfer unit --- lumens (lm) magnitude measuring instruments, is Measure the total luminous flux measuring light relative method. It is the light emission characteristics according to the specific requirements of the production of stable incandescent.4 metering performance requirementsStability 4.1 total luminous flux standard lamp The first submission of the DC power supply standard lamp aging must be in accordance with relevant regulations. Stability after aging should be achieved in the reference Current test ignite under 8h, lamp terminal voltage variation is less than 0.05% (for vacuum lamp) and 0.07% (for inflatable lamp) (Experimental Method see Appendix B). For standard AC-powered lamp, its stability should meet the requirements of GB 15040-1994's. Grading 4.2 total luminous flux standard lamp First standard lamp censorship not rated. When retested after one year, according to the time rate of change of the lamp and the calibration used On one level to be rated according to criteria specified in Table 1. Table 1 standard lamp classification regulations Q is the rate of change in the level of the higher standard inspection standard lamp luminous flux level Working Standard reference or sub-reference is not more than 0.6% Not less than a reference work not more than 0.8% Two of not less than a 1.0% or less Q = | Φ2-Φ1 | Φ1 × 100% (1) Where. Φ1 --- First check the total luminous flux values; The total flux value Φ2 --- retest. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 247-2008_English be delivered?Answer: Upon your order, we will start to translate JJG 247-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JJG 247-2008_English with my colleagues?Answer: Yes. The purchased PDF of JJG 247-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version JJG 247-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 247-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |