JJG 194-2007 English PDFUS$389.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 194-2007: Verification Regulation of Box Plates Status: Valid JJG 194: Historical versions
Basic dataStandard ID: JJG 194-2007 (JJG194-2007)Description (Translated English): Verification Regulation of Box Plates Sector / Industry: Metrology & Measurement Industry Standard Classification of Chinese Standard: A52 Classification of International Standard: 17.040.01 Word Count Estimation: 15,197 Date of Issue: 2007-06-14 Date of Implementation: 2007-12-14 Older Standard (superseded by this standard): JJG 194-1992 Quoted Standard: JJF 1001-1998; JJF 1059-1999; JJF 1094-2002 Regulation (derived from): AQSIQ Announcement No. 95 of 2007 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine Summary: This standard applies to cast iron square box and rock side box first test, follow-up testing and use of the test. JJG 194-2007: Verification Regulation of Box Plates---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Verification Regulation of Box Plates State verification procedures People's Republic of China Square box BoxPlates Posted 2007-06-14 2007-12-14 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Square box test procedures BoxPlates Replacing JJG 194-1992 The regulations by the State Administration of Quality Supervision, Inspection and Quarantine, 2007 June 14 ratification and From December 14, 2007 into effect. NFP. National Engineering Geometrical Parameters Measurement Technology Committee Drafting. Shanghai Institute of Measurement and Testing This procedure works commissioned by the National geometric parameter measurement technology committee responsible for the interpretation The drafters of the regulations. Zheng Yin (Shanghai Institute of Measurement and Testing) Mahao Hui (Shanghai Institute of Measurement and Testing) Chen Zhize (Shanghai Institute of Measurement and Testing) table of Contents1 Scope (1) 2. Referenced Documents (1) 3 Overview (1) 4 metering performance requirements (1) 4.1 Face Flatness (1) Face two parallel 4.2 (2) 4.3 Face verticality (2) 4.4 V-shaped groove on the bottom and side parallelism (2) 5 General Requirements (2) 5.1 appearance and surface quality (2) 6 Control of measuring instruments (3) 6.1 Verification condition (3) 6.2 Verification Project (3) 6.3 Verification Methods (3) Processing 6.4 Verification Results (6) 6.5 test cycle (6) Appendix A square box vertical measurement results Uncertainty Evaluation (7) Appendix B calibration certificate and test results notice (within the page) format (10) Square box test procedures1 ScopeThe order applies to the cast iron boxes and rock side box initial verification, subsequent verification and use of tests.2 CitationsThe regulations cited in the following documents. JJF1001-1998 common measurement terms and definitions JJF1059-1999 Evaluation and Expression of Uncertainty in Measurement JJF1094-2002 measuring instrument characteristics assessed technical specifications When using this procedure, it should pay attention to using the currently valid version of the documents cited.3 OverviewCast iron square box is a cube with six cavities face in which a work surface a V-shaped groove. Party Rock Box is a cube, there are six working surface. Square box for parts parallelism, perpendicularity measurement and inspection for scribing appliance. Structure type shown in Figure 1. 1 cast iron, rock square box structure type Figure 1,2,3,4,5,6-Face; 7-V-shaped groove Divided by the square box side length of 100mm, 160mm, 200mm, 250mm, 315mm and 400mm, and other specifications; Associate Press Accuracy level is divided into Level 1, Level 2 and Level 3; by end-use sub-normal levels 1, 2 test square box, crossed square box to level 3.4 metering performance requirements4.1 Face flatness Face each square box allowed convex, flatness requirements specified in Table 1. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 194-2007_English be delivered?Answer: Upon your order, we will start to translate JJG 194-2007_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JJG 194-2007_English with my colleagues?Answer: Yes. The purchased PDF of JJG 194-2007_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version JJG 194-2007?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 194-2007 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |