JJG 1076-2012 English PDFUS$369.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 1076-2012: Verification Regulation of Verification Equipment for Traffic Loop-based Speed Meters Status: Valid
Basic dataStandard ID: JJG 1076-2012 (JJG1076-2012)Description (Translated English): Verification Regulation of Verification Equipment for Traffic Loop-based Speed Meters Sector / Industry: Metrology & Measurement Industry Standard Classification of Chinese Standard: A57 Classification of International Standard: 17.080 Word Count Estimation: 16,123 Quoted Standard: JJG 180-2002; JJG 527-2007 Regulation (derived from): AQSIQ Announcement No. 35 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine Summary: This standard applies by changing the sense coil inductance principle vehicle speed sense coil system verification device initial verification, testing and use of follow-up checks. JJG 1076-2012: Verification Regulation of Verification Equipment for Traffic Loop-based Speed Meters---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Verification Regulation of Verification Equipment for Traffic Loop-based Speed Meters State verification procedures People's Republic of China Vehicle speed sense coil system verification equipment Issued on. 2012-03-05 2012-06-05 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Vehicle speed sense coil system verification Means test procedures eedMeters Focal point. the National Technical Committee of shock and vibration measurement speed Main drafting unit. Jiangsu Province Institute of Metrology Beijing Institute of Metrology detection Participated in the drafting unit. Fujian Institute of Measurement Science and Technology Xi'an Institute of Measurement Heilongjiang Provincial Academy of verification test This procedure entrust national shock and vibration speed measurement technology committee responsible for the interpretation The main drafters of this procedure. Lin Zhongyang (Jiangsu Province Institute of Metrology) Zhu Junjie (Beijing Institute of Metrology detection) Drafters participate. Jian-Hui Lin (Fujian Institute of Measurement Science Technology) Zang Xiaoxia (Jiangsu Province Institute of Metrology) Zhang Lijun (Xi'an Institute of Measurement) Wu Changshun (Heilongjiang Provincial Academy of verification test) Chen Li (Jiangsu Province Institute of Metrology) table of ContentsIntroduction (Ⅱ) 1 Scope (1) 2. References (1) 3 terminology and units of measurement (1) Trigger 3.1 (1) 3.2 trigger signal (1) Interval 3.3 (1) Sense of distance between the coils to 3.4 (1) 3.5 simulation speed (1) 4 Overview (1) 5 metering performance requirements (1) 5.1 1s frequency stability (1) 5.2 The maximum permissible time interval error (2) 5.3 Analog speed range (2) 5.4 Simulation Speed The maximum permissible error (2) 6 General Requirements (2) 6.1 Appearance (2) 6.2 Other (2) 7 control of measuring instruments (2) 7.1 verification Conditions (2) 7.2 test items and test with appliances (2) 7.3 Verification Methods (3) 7.4 test results processing (4) 7.5 test cycle (4) Appendix A sense coil type speedometer calibration device test records (recommended) format (5) Appendix B test certificate page format (7) Appendix C test results in the notice page format (8) Distance, speed and time interval between the coil table in Appendix D (9)IntroductionThis procedure based on JJF1002-2010 "national verification procedures write rules", JJF1001-1998 "Tong Metering terms and definitions ", JJF1059-1999" Evaluation and Expression of Uncertainty in Measurement ", JJF1094-2002 "Measuring instrument characteristics assessment" and other basic family of specifications developed. Vehicle speed sense coil system verification test procedures means1 ScopeThe order applies to the sense by changing the vehicle speed and the sense coil system verification device inductance coil principle (Hereinafter referred to as "verification unit") the initial verification, subsequent verification and the use of checks. 2. References This procedure references the following documents. JJG 180-2002 electronic measuring instruments within the quartz oscillator JJG 527-2007 vehicle speed automatic monitoring system For dated references, only the dated edition applies to this procedure; undated reference documents Member, the latest version (including all repair orders) applies to this procedure.3 terminology and units of measurement3.1 Trigger trigger By a wire wound or hollow core toroidal coil for sensing and sense coil excitation subject. 3.2 trigger triggersignal Verification issued by the host device, the signal generated by the flip-flop, in order to simulate the vehicle speed. 3.3 Interval timeinterval The time between two trigger signals. Distancebetweencoils 3.4 distance between the sense coil Coil mounted on the same lane, according to the direction of travel of the vehicle, adjacent edges of two coils (i.e., vehicle The vertical distance to go through the edge) between. 3.5 analog speed simulationspeed When the distance between adjacent coils being determined by measuring the time interval between their respective trigger signal derived ratio.4 OverviewTest device to simulate the speed and distance needed to set a given sense coil between the respective trigger signal derived Intervals. The principle of electromagnetic induction trigger signal is transmitted to the sense coil speedometer, thus simulating the bus Traveling speed vehicle. Verification by the host device and flip-flops for more than two and a sense coil vehicle speed automatic monitoring System simulation test speed error.5 metering performance requirements5.1 1s frequency stability ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 1076-2012_English be delivered?Answer: Upon your order, we will start to translate JJG 1076-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JJG 1076-2012_English with my colleagues?Answer: Yes. The purchased PDF of JJG 1076-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |