JJG 1010-2013 English PDFUS$419.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 1010-2013: Verification Regulation of Electronic Parking Meters Status: Valid JJG 1010: Historical versions
Basic dataStandard ID: JJG 1010-2013 (JJG1010-2013)Description (Translated English): Verification Regulation of Electronic Parking Meters Sector / Industry: Metrology & Measurement Industry Standard Classification of Chinese Standard: A57 Classification of International Standard: 17.080 Word Count Estimation: 18,117 Older Standard (superseded by this standard): JJG 1010-2006 Quoted Standard: JJF 1001-2011; JJF 1180-2007 Regulation (derived from): AQSIQ Announcement No. 63 of 2013 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine Summary: This standard applies to: the timing of electronic parking meters, parking fee electronic timing device (system) (hereinafter referred to as the timing and charging device) initial verification, testing and use of the follow-up examination. JJG 1010-2013: Verification Regulation of Electronic Parking Meters---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Verification Regulation of Electronic Parking Meters State verification procedures People's Republic of China Electronic parking meter table Issued on. 2013-04-27 2013-10-27 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Electronic parking meter meter testing procedures Meters Replacing JJG 1010-2006 Focal point. the National Commission on Time and Frequency Measurement Technology Main drafting unit. Xinjiang Institute of Measurement and Testing Participated in the drafting unit. Beijing Institute of Metrology detection Zhengzhou City of Quality and Technical Supervision and Testing Center The national time and frequency measurement procedures commissioned technical committee responsible for the interpretation The main drafters of this procedure. Song Wei (Xinjiang Institute of Measurement and Testing) Luoxue Fang (Xinjiang Institute of Measurement and Testing) Drafters participate. Huang Yousheng (Xinjiang Institute of Measurement and Testing) Huang Yan (Beijing Institute of Metrology detection) Ke Chun-rong (Zhengzhou City of Quality and Technical Supervision and Testing Center) table of ContentsIntroduction (Ⅱ) 1 Scope (1) 2. References (1) 3 terminology and units of measurement (1) 3.1 Unit Charge time (1) 3.2 Rate (1) 3.3 Free parking time (1) 3.4 fixed fee (1) Current time synchronization error 3.5 (1) 4 Overview (1) 5 metering performance requirements (2) 5.1 clock day difference (2) Current time error 5.2 (2) 5.3 Maximum current time synchronization error (2) 5.4 Stop timing error (2) 5.5 tariff and billing correctness (2) 6 General Requirements (2) 6.1 Appearance (2) 6.2 Function (2) 7 control of measuring instruments (2) 7.1 verification Conditions (2) 7.2 Verification Project (3) 7.3 Verification Methods (3) 7.4 test results processing (6) 7.5 test cycle (6) Original record format in Appendix A (7) Appendix B test certificate page format (9) Appendix C test results in the notice page format (11)IntroductionJJG 1010-2013 "electronic parking meter table" is JJG 1010-2006 "electronic parking meter Table Revision "verification procedures. Compared with JJG 1010-2006, the main technical changes are as follows. --- Extended test range (see Chapter 1); --- Added introduction, the term content (see Introduction and Chapter 3); --- Supplementary content overview (see Chapter 4); --- Complement the performance requirements for content measurement (see Chapter 5); --- Increasing the current maximum test time synchronization error (see 7.2.1). JJG 1010-2006 for the first release. Electronic parking meter meter testing procedures1 ScopeThe order applies to electronic parking meter time charges, parking fees electronic timing device (system) (hereinafter referred to as Time charge means) initial verification, use and subsequent verification check. 2. References This procedure refers to the following documents. JJF1001-2011 common measurement terms and definitions JJF1180-2007 time and frequency measurement terminology and definitions For dated references, only the dated edition applies to this procedure; undated reference documents Member, the latest edition (including any amendments) applies to this procedure.3 terminology and units of measurement3.1 Unit Charge time unitchargetime Pre-approved by the local authorities in charge time charge means the minimum time interval. Unit of measure in hours (H) or minutes (min). 3.2 rate rate Charge fees per unit of time (such as 2 yuan/hour). 3.3 Free parking time free-chargeparkingtime After local authorities approved the maximum time interval of free parking. 3.4 Fixed fee fixedcharges Approved by the local authorities, within a certain period of time (usually at night) parking is a fixed amount charged, and Independent of the length of parking time. 3.5 current time synchronization error thesynchronouserroronpresentmoment In the same parking lot, when you have more than one time charge terminal, the difference between the current time in different time charge between terminals.4 OverviewElectronic parking meter time charges, parking fees electronic timing device (system) is the road system or site parking EC in charge terminal, generally paper bar code or IC cards, magnetic cards, etc. As time charge carriers, computer Processing and storage of information in the vehicle through the parking lot, the entrance were a record time information, and based on costs Rate and the time to achieve a road or parking temporary parking site real-time management fee. Press installation can be divided into fixed and hand Hold two. Fixed hourly rate means fixedly mounted in the parking lot and export, use in vehicle access; handheld Timing and charging device operated by an administrator, you can use the import and export in the parking lot, parking can also be used in internal flow. press Timing using a carrier can be divided into magnetic cards, contactless IC card, contactless IC card, bar code paper type and so on. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 1010-2013_English be delivered?Answer: Upon your order, we will start to translate JJG 1010-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JJG 1010-2013_English with my colleagues?Answer: Yes. The purchased PDF of JJG 1010-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version JJG 1010-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 1010-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |