Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

JJF 1648-2017 English PDF

US$559.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
JJF 1648-2017: Calibration Specification for Test Systems of Ducted Silencers
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
JJF 1648-2017559 Add to Cart 4 days Calibration Specification for Test Systems of Ducted Silencers Valid

Similar standards

GB/T 3222.2   GB/T 3222.1   JJG 188   JJF 1650   JJF 1651   JJF 1649   

Basic data

Standard ID: JJF 1648-2017 (JJF1648-2017)
Description (Translated English): Calibration Specification for Test Systems of Ducted Silencers
Sector / Industry: Metrology & Measurement Industry Standard
Classification of Chinese Standard: A59
Classification of International Standard: 17.140
Word Count Estimation: 24,213
Date of Issue: 2017-11-20
Date of Implementation: 2018-02-20
Quoted Standard: JJG 188; JJF 1001-2011; JJF 1034-2005; GB/T 3102.5-1993; GB/T 3102.7-1993; GB/T 6881.1-2002; GB/T 17697-2014
Regulation (derived from): AQSIQ Notice 2017 No. 103
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine
Summary: This standard specifies the calibration conditions for the pipeline muffler test system and the calibration method for its main metrological characteristics. This standard is applicable to the calibration of test systems for measuring the performance of pipeline mufflers including ventilation and air conditioning systems, gas inlet and exhaust systems, and other similar systems (referred to as pipeline muffler test systems).

JJF 1648-2017: Calibration Specification for Test Systems of Ducted Silencers

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Pipeline muffler test system calibration specification) People's Republic of China National Metrology Technical Specifications Pipe Muffler Test System Calibration Specifications Published on.2017-11-20 2018-02-20 Implementation The State Administration of Quality Supervision, Inspection and Quarantine issued Pipe Muffler Test System Calibration specification Integral Unit. National Acoustic Measurement Technical Committee Drafted by. China Shipbuilding Industry Corporation Seventh Institute China Institute of Metrology Hubei Institute of Measurement and Measurement Technology This specification entrusts the National Acoustic Measurement Technical Committee to explain Drafters of this specification. Zhu Chuanhuan (The 7th Research Institute of China Shipbuilding Industry Corporation) Tang Jun (The Seventh Institute of China Shipbuilding Industry Corporation) Zhang Hengping (The 7th Research Institute of China Shipbuilding Industry Corporation) Yang Ping (China Institute of Metrology) Yao Qiuping (Hubei Provincial Measurement and Measurement Technology Research Institute) Niu Feng (China Institute of Metrology)

table of Contents

Introduction (II) 1 Scope (1) 2 References (1) 3 Terms and units of measure (1) 3.1 Terms and Definitions (1) 3.2 Units of measurement (2) 4 Overview (2) 5 Metrological characteristics (2) 5.1 Front Reflection Factor (2) 5.2 Final reflection coefficient (3) 5.3 Limit Insertion Loss (3) 5.4 Sound Power Level of Regeneration Current Noise (3) 5.5 Wind speed uniformity (3) 5.6 System Sound Source Stability (3) 6 Calibration Conditions (3) 6.1 Environmental Conditions (3) 6.2 Main Standards and Other Equipment (3) 7 Calibration Items and Calibration Methods (4) 7.1 Calibration Items (4) 7.2 Calibration Methods (4) 8 Expression of Calibration Results (9) 8.1 Calibration Record (9) 8.2 Calibration Data Processing (9) 8.3 Calibration Certificate (9) 8.4 Measurement uncertainty of calibration results (9) 9 Re-school interval (9) Appendix A Contents of Calibration Records (10) Appendix B Content of Calibration Certificate (12) Appendix C Examples of Measurement Uncertainty Evaluation (14)

Introduction

This specification is prepared in accordance with the requirements and format of the JJF 1071-2010 "Rules for the preparation of national measurement calibration specifications". This specification mainly refers to the technical aspects of GB/T 25516-2010 "Acoustic pipe muffler and duct ends Laboratory Measurement Methods for Insertion Loss, Airflow Noise, and Total Pressure Loss in a Unit's Pipeline Muffler Test System Performance parameter requirements and test methods. This specification gives the limit insertion loss test according to JJF 1059.1-2012 "Uncertainty Evaluation and Representation of Measurement". Examples of assessments of quantity uncertainty. This specification is the first release. Pipe Muffler Test System Calibration Specifications

1 Scope

This specification specifies the calibration conditions for the pipeline muffler test system and calibration methods for its main metrological characteristics. This specification applies to pipelines including ventilation and air conditioning systems, gas intake and exhaust systems, and other similar systems. Calibration of a muffler performance measurement test system (called a pipeline muffler test system).

2 references

This specification refers to the following documents. JJG188 sound level meter JJF 1001-2011 Universal Measurement Terms and Definitions JJF 1034-2005 Acoustic Measurement Terms Terms and Definitions GB/T 3102.5-1993 Electrical and magnetic quantities and units GB/T 3102.7-1993 Acoustic quantities and units GB/T 6881.1-2002 Acoustics and sound pressure method for determining sound power levels of noise sources Reverberation room method GB/T 17697-2014 Acoustics Fans and other ventilation equipment Sound power measuring tubes radiated into pipes Road Act For dated references, only dated editions apply to this specification; all undated references The latest version (including all amendments) applies to this specification.

3 Terms and units of measure

3.1 Terms and Definitions The following terms and definitions defined in JJF 1001-2011, JJF 1034-2005, and JJG188 apply to this specification. 3.1.1 insertion loss insertionloss The difference in sound power level measured in the downstream pipeline before and after installation of the test piece in the pipeline, and the insertion loss symbol Di Shown, see equation (1). Di=LWII -LWI (1) In the formula. LWI—Before installing the test piece, propagate along the test pipe or radiate into the reverberation room (or half-silenced) connected to the pipe. The measured sound power level in the room); LWII---After installation of the test piece, it propagates or radiates along the test pipe to the reverberation room (or semi-silencer) connected to the pipe. The measured sound power level in the room. Note. The insertion loss is in decibels, dB. 3.1.2 Face Velocity The wind speed (vf) in front of the test specimen, in m/s, see equation (2).
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of JJF 1648-2017_English be delivered?

Answer: Upon your order, we will start to translate JJF 1648-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of JJF 1648-2017_English with my colleagues?

Answer: Yes. The purchased PDF of JJF 1648-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.