JJF 1302-2011 English PDFJJF 1302: Historical versions
Basic dataStandard ID: JJF 1302-2011 (JJF1302-2011)Description (Translated English): Program of Pattern Evaluation for Optical Theodolites Sector / Industry: Metrology & Measurement Industry Standard Classification of Chinese Standard: A52 Classification of International Standard: 17.040 Word Count Estimation: 38,312 Date of Issue: 2011-07-28 Date of Implementation: 2011-10-28 Quoted Standard: JJG 414-2003; JJG 949-2000; GB/T 3161-2003; GB/T 2423.4-2008; JB/T 9329-1999 Regulation (derived from): AQSIQ Announcement No. 118 of 2011 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine Summary: This standard applies to DJ07, DJ1, DJ2, DJ6 optical theodolite type evaluation. JJF 1302-2011: Program of Pattern Evaluation for Optical Theodolites---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Program of Pattern Evaluation for Optical Theodolites People's Republic of China National Metrology Technical Specifications Optical theodolite type evaluation outline Issued on. 2011-07-28 2011-10-28 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Optical theodolite type evaluation outline EvaluationforOp This specification by the State Administration of Quality Supervision, Inspection and Quarantine approved on July 28, 2011, and from From October 28, 2011 into effect. Focal point. the National Technical Committee of length measuring geometry Main drafting unit. Hebei Supervision and Testing hospital Participated in the drafting unit. China Aviation Industry Corporation Beijing Great Wall Measurement and Testing Technology Institute of surgery Beijing Bowflex Instrument Co., Ltd. This specification length measuring geometry by the National Technical Committee is responsible for interpretation The main drafters of this specification. Xie Ping (Hebei Supervision and Testing Institute) Wang Shaoping (Hebei Supervision and Testing Institute) Hao Yanbin (Hebei Supervision and Testing Institute) Drafters participate. Teachers will be born (China Aviation Industry Corporation Beijing Great Wall Measurement and Testing Technology Surgical Institute) PAPERS (Beijing Bowflex Instrument Co., Ltd.) table of ContentsIntroduction (Ⅲ) 1 Scope (1) 2. Referenced Documents (1) 3 Overview (1) 4 legal management requirements (1) 4.1 units of measurement (1) 4.2 legal metrology marking and identification of measuring instruments (1) 4.3 offers the review of technical documents and test prototype (1) 5 measurement requirements (2) 5.1 telescope resolving power (2) 5.2 magnification telescope (2) 5.3 Effective aperture telescope (2) 5.4 level of vertical axis and the vertical axis (2) 5.5 Sight correctness of the rotary (2) 5.6 degree of collimation axis and perpendicular to the horizontal axis (2) 5.7 The horizontal axis and vertical axis of verticality (2) 5.8 Vertical index error (2) 5.9 telescope focusing run error (2) 5.10 Optical plummet visual axis coaxial with the vertical axis (2) 5.11 vertical dial indicator automatic compensation error (2) 5.12 one measuring the horizontal standard deviation (2) One measuring 5.13 Vertical Angle Surveying Standard Deviation (2) 6 General Requirements (3) 6.1 appearance quality and interaction (3) 6.2 telescope reticle degree vertical vertical wire (3) 6.3 Operating temperature test (3) 6.4 transport, environmental testing (4) 7 types of evaluation items (4) 8 pilot projects test methods and conditions (5) 8.1 Legal Requirements Management (5) 8.2 metrological requirements (6) 8.3 General technical requirements, test (15) 9 type evaluation and determination of the results (19) 10 original record format type evaluation (19) Appendix A collimation axis and perpendicular to the horizontal axis of the (multi-tooth indexing table method) (20) Appendix B rounds a horizontal standard deviation (multi-tooth indexing table method) (21) Appendix C back to a vertical angle measurement angle measurement standard deviation (multi-objective method) (22) Appendix D optical theodolite type evaluation original record format (24)IntroductionThis outline is based on JJF 1016-2009 "Measuring Instruments type evaluation outline guidelines for the preparation" and JJF 1015- 2002 "Measuring Instruments type evaluation and type approval of universal norms" have been made. The outline of the pilot projects and test procedures cited JJG414-2003 "theodolite" GB/T 3161-2003 "theodolite" provisions on requirements for test equipment cited JJG949-2000 Provisions "theodolite verification device". Optical theodolite type evaluation outline1 ScopeThis outline is applied to DJ07, DJ1, DJ2, DJ6 optical theodolite type evaluation.2 CitationsJJG414-2003 theodolite JJG949-2000 theodolite verification device GB/T 3161-2003 theodolite GB/T 2423.4-2008 Environmental testing for electric and electronic products Part II. Test methods - Test Db. cross Damp heat (12h 12h cycle) JB/T 9329-1999 instrumentation transportation, transportation, storage and basic environmental conditions and test methods When using this outline, note the use of the effective version of the documents cited.3 OverviewOptical theodolite (hereinafter referred to as theodolite) for measuring horizontal and vertical angles of precision optical instruments. Optical Jingwei Press one measuring instrument nominal standard deviation divided horizontally have DJ07, DJ1, DJ2, multiple DJ6 levels.4 legal management requirements4.1 units of measurement Theodolite legal units of measurement should be used. 4.2 legal metrology marking and measuring instruments logo In theodolite was part of the flag should be marked with legal metrology measuring instruments and logos, marks, number and description should Legible, solid and reliable. 4.2.1 legal metrology mark Legal metrology signs generally include. measurement equipment manufacturing license number and logo, new products can be left with It should position (only domestic instrument). 4.2.2 measuring instruments logo Measuring instruments logo should generally include. Instrument name, manufacturer name, model number, date of manufacture, serial number. 4.3 offers the review of technical documents and test prototype 4.3.1 provide technical documentation review 4.3.1.1 prototype photos; 4.3.1.2 product standards (including test methods); 4.3.1.3 assembly diagram and the main components of FIG; 4.3.1.4 Instructions; 4.3.1.5 Test report in accordance with product standard full term changes. 4.3.2 experimental prototype provided ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJF 1302-2011_English be delivered?Answer: Upon your order, we will start to translate JJF 1302-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically in 9 seconds (download/delivered in 9 seconds). The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of JJF 1302-2011_English with my colleagues?Answer: Yes. The purchased PDF of JJF 1302-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version JJF 1302-2011?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJF 1302-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |