JB/T 7332-2016 PDF EnglishUS$235.00 · In stock · Download in 9 seconds
JB/T 7332-2016: Manual trolleys Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid JB/T 7332: Historical versions
Similar standardsJB/T 7332-2016: Manual trolleys---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/JBT7332-2016JB MECHANICAL INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 53.020.99 J 80 Filing No.: 56465-2017 Replacing JB/T 7332-2007 Manual trolleys ISSUED ON: OCTOBER 22, 2016 IMPLEMENTED ON: APRIL 01, 2017 Issued by: Ministry of Industry and Information Technology of PRC Table of ContentsForeword ... 3 1 Scope ... 4 2 Normative references ... 4 3 Terms and definitions ... 4 4 Types and basic parameters ... 5 4.1 Types ... 5 4.2 Basic parameters ... 7 5 Technical requirements ... 8 5.1 Operating ambient temperature ... 8 5.2 Operating performance ... 8 5.3 Strength of the whole machine ... 9 5.4 Main parts ... 9 5.5 Painting and appearance ... 10 5.6 Safety protection ... 10 6 Test methods ... 11 6.1 Test load ... 11 6.2 Visual inspection ... 11 6.3 Operating performance test ... 11 6.4 Strength test of whole machine ... 12 6.5 Determination of paint film adhesion ... 13 7 Inspection rules ... 13 7.1 Inspection classification ... 13 7.2 Exit-factory inspection ... 14 7.3 Type inspection ... 14 8 Marking, packaging, transportation, storage ... 15 8.1 Marking ... 15 8.2 Packaging ... 15 8.3 Transportation and storage ... 15 Manual trolleys1 ScopeThis standard specifies the terms and definitions, types and basic parameters, technical requirements, test methods, inspection rules, markings, packaging, transportation, storage of manual trolleys. This standard applies to the manual trolleys, which have a rated load of 0.25 t ~ 50 t AND are driven by hand zipper, as well as the manual trolleys, which have a rated load of 0.25 t ~ 10 t AND driven by hand-pushed lifting heavy objects, running on the lower flange of the horizontally installed rails, such as I- beams (hereinafter referred to as trolley).2 Normative referencesThe following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document. For undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 9286 Paints and varnishes - Cross cut test for films GB/T 13306 Plate GB/T 13384 General specifications for packing of mechanical and electrical product3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Rated capacity The sum of the weight that the monorail trolley can carry AND the mass of the lifting device. 3.2 Running height The vertical distance, FROM the contact point between the working plane of the monorail trolley's wheel and the running I-beam track TO the standing plane of the operator. 3.3 Minimum turning radius The minimum radius of curvature on the inner side of the lower flange of the I-beam and other curved sections, where the monorail trolley is running. 3.4 Passage space The vertical distance, FROM the contact point between the working plane of the monorail trolley's wheel and the running I-beam track TO the top of the lifting ring. 3.5 Overturn A phenomenon in which the working plane of a monorail trolley's wheel deviates from the running I-beam or other track, thereby making it unable to operate normally. 3.6 Hand pull The pulling force, which is required to operate the monorail trolley at a uniform speed, by applying to the hand-chain. Note: For the hand pull of the monorail trolley, which has the hand-chain of combined structure, it refers to the pulling force on a single body, when the hand- chains on the two bodies are simultaneously pulled, with the same force, to drive the whole machine to run.4 Types and basic parameters4.1 Types The types of monorail trolleys are divided into the following two types, according to the driving mode: equipped with an anti-overturning device. 5.6.2 The hand-chain trolley shall be equipped with a chain stop device, to prevent the hand chain from falling out of the ring groove of the hand sprocket wheel.6 Test methods6.1 Test load The test load can adopt the direct loading method by heavy objects, OR hydraulic pressure, OR other loading methods that can generate the test load. When loaded by the heavy object method, the allowable deviation of the test load is ± 1%. When hydraulic pressure OR other loading methods, that can generate test loads, are used, the allowable deviation of the test load is 0 ~ 10%. The heavy object loading method shall be adopted as the basis for arbitration. 6.2 Visual inspection The visual inspection shall include whether the specifications and/or status of all important components meet the requirements, such as: - Wheels, hand chain; - All protective devices, including anti-overturning devices, chain stop devices, etc. 6.3 Operating performance test 6.3.1 Operating performance test under no-load The monorail trolley runs, in a reciprocated manner, on a straight line AND the minimum turning radius as specified in Table 1 or Table 2, under no-load conditions. The cumulative running length shall not be less than that specified in Table 3. 6.3.2 Operating performance test under dynamic load The test load specified in Table 3 is applied to the lifting ring of the monorail trolley. The monorail trolley is driven to reciprocate on the straight-line track, by pulling the hand chain OR pushing a heavy object. The cumulative running length shall not be less than that specified in Table 3. 6.3.3 Operating performance test along curve A test load of rated capacity is applied to the lifting ring of the monorail trolley. The monorail trolley is driven to reciprocate on the track, which has the minimum turning radius as given in Table 1 or Table 2, by pulling the hand chain OR pushing a heavy object. The cumulative running length shall not be less than 4 m. 6.3.4 Determination of hand pull When measuring the hand pull, the track, on which the tested hand-chain trolley runs, shall meet the following requirements: - The slope does not exceed 3/1000; - The track surface shall be flat AND free of oxide scale, rust, dirt and other debris. The hand pull is measured by the heavy weight method. The measurement method is as follows: Apply a test load of rated capacity to the hand-chain trolley. Tighten the hand chain on one side. Hang a heavy weight on the other hand chain. Instantly loosen the tightened hand chain. If the hand-chain trolley is running, the weight of the heavy weight, which is hung at this time, is regarded as the hand pull as measured this time. When the hand-chain trolley moves in the reverse direction, measure the hand pull again. The average of the two hand pulls is the hand pull of the tested hand-chain trolley. For the hand-chain trolley of combined structure, it is allowed to test the hand pull of one body, after disassembly. At this time, the test load is one-half of the test load of the whole machine. 6.4 Strength test of whole machine The performance test under static load is carried out on the testing machine, as shown in Figure 4. When the monorail trolley has a combined structure, the body and the lifting ring are allowed to be tested separately. However, the stressing method during the test shall be similar to the stressing method in actual use. ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of JB/T 7332-2016 be delivered?Answer: The full copy PDF of English version of JB/T 7332-2016 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of JB/T 7332-2016_English with my colleagues?Answer: Yes. The purchased PDF of JB/T 7332-2016_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- JB/T 7332-2016 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.Question 5: Should I purchase the latest version JB/T 7332-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JB/T 7332-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.How to buy and download a true PDF of English version of JB/T 7332-2016?A step-by-step guide to download PDF of JB/T 7332-2016_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "JB/T 7332-2016". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |