HYT0350-2023 English PDFUS$539.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. HYT0350-2023: Technical requirement for terrain and topography integration survey of land-ocean transitional zone Status: Valid
Basic dataStandard ID: HY/T 0350-2023 (HY/T0350-2023)Description (Translated English): Technical requirement for terrain and topography integration survey of land-ocean transitional zone Sector / Industry: Marine Industry Standard (Recommended) Classification of Chinese Standard: A45 Classification of International Standard: 07.060 Word Count Estimation: 27,254 Date of Issue: 2023-07-11 Date of Implementation: 2023-09-01 Issuing agency(ies): Ministry of Natural Resources of the People's Republic of China HYT0350-2023: Technical requirement for terrain and topography integration survey of land-ocean transitional zone---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 07.060 CCSA45 Marine Industry Standards of the People's Republic of China Technical requirements for shipborne integrated survey of land and sea topography Published on 2023-07-11 2023-09-01 Implementation Released by the Ministry of Natural Resources of the People's Republic of China Table of contentsPreface III 1 Scope 1 2 Normative reference documents 1 3 Terms and Definitions 1 4 General 2 4.1 Purpose 2 4.2 Composition of shipborne integrated survey system 2 4.3 Shipboard integrated survey content 2 4.4 Adoption of Benchmark 2 4.5 Time System 2 4.6 Measurement requirements 3 4.7 Quality requirements 3 5 Technical Design 4 5.1 Technical design basis 4 5.2 Project Design 4 5.3 Professional design 4 5.4 Survey Implementation Plan 5 6 Investigation Implementation 5 6.1 Preparation before test 5 6.2 Field collection 7 7 Result production and quality inspection 7 7.1 Preprocessing content 7 7.2 Point cloud coordinate calculation 8 7.3 Projection transformation 8 7.4 Vertical datum conversion 8 7.5 Point cloud editing 8 7.6 Point cloud classification 8 7.7 Digital elevation model production 9 7.8 Quality Check 9 8 Data sorting and archiving10 8.1 Archiving requirements10 8.2 Archived content10 Appendix A (informative) System calibration method 11 A.1 Overview 11 A.2 Indoor rough inspection 11 A.3 Outdoor precision calibration12 Appendix B (normative) Shipboard integrated survey of land and sea topography class report 13 Appendix C (informative) Location calculation of measuring points 18 C.1 Definition of relevant coordinate systems18 C.2 Conversion from sensor coordinate system to carrier coordinate system 19 C.3 Conversion of carrier coordinate system to local horizontal coordinate system 19 C.4 Conversion from local horizontal coordinate system to geodetic coordinate system 20 Reference 22ForewordThis document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents. This document is proposed by the Ministry of Natural Resources of the People's Republic of China. This document is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283). This document was drafted by. Shandong University of Science and Technology, the Second Institute of Oceanography of the Ministry of Natural Resources, and the Tianjin Water Transport Engineering Research Institute of the Ministry of Transport Institute, Qingdao Xiushan Mobile Surveying Co., Ltd. The main drafters of this document. Yang Fanlin, Shi Bo, Wu Ziyin, Yang Kun, Li Guoyu, Lu Xiushan, Li Shoujun, Shang Jihong, Sui Haichen, Qi Chao, Zhao Dineng, Cui Xiaodong, Li Dingshuo. Technical requirements for shipborne integrated survey of land and sea topography1 ScopeThis document establishes the general principles for integrated shipborne land and sea topography surveys, and stipulates technical design, survey implementation, results production and quality Technical requirements for inspection, data compilation and archiving. This document is suitable for 1.500~1.2000 shipborne integrated survey of regional topography and landforms in the transition zone between sea and land, and other types of land and sea topography. The geomorphological survey project can be implemented as a reference.2 Normative reference documentsThe contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document. GB/T 12763.2-2007 Marine Survey Specifications Part 2.Marine Hydrological Observation GB/T 12898-2009 National third- and fourth-class level measurement specifications GB/T 17501-2017 Specification for topographic survey of marine engineering CH/T 8023-2011 Airborne lidar data processing technical specifications CH/T 9008.2-2010 Basic geographical information digital results 1.500, 1.1000, 1.2000 digital elevation model3 Terms and definitionsThe terms and definitions defined in CH/T 8023-2011 and the following apply to this document. 3.1 The intertidal zone affected by the rising and falling seawater and a certain range of land and shallow sea on both sides. Note. Generally no more than 1km. 3.2 vertical datum verticaldatum The starting plane or reference datum of geospatial information in the vertical direction. Note. It includes elevation datum, depth datum and other vertical reference datums. This document involves elevation datum and depth datum. 3.3 Navigation System (INS) is a combined system that directly determines the spatial position and attitude of the sensor. 3.4 Using surface ships (including unmanned ships) as carriers, it integrates laser scanners, multi-beam depth sounders, and combined positioning and attitude determination systems. It is a system that conducts topographic and landform survey in the land-sea transition zone. 3.5 point cloudpointcloud A collection of points distributed in a discrete and irregular manner in three-dimensional space. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HYT0350-2023_English be delivered?Answer: Upon your order, we will start to translate HYT0350-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of HYT0350-2023_English with my colleagues?Answer: Yes. The purchased PDF of HYT0350-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |