HJ 864.1-2017 English PDFUS$1089.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 864.1-2017: Technical specification for application and issuance of pollutant permit Nitrogenous fertilizer industry Status: Valid
Basic dataStandard ID: HJ 864.1-2017 (HJ864.1-2017)Description (Translated English): Technical specification for application and issuance of pollutant permit Nitrogenous fertilizer industry Sector / Industry: Environmental Protection Industry Standard Classification of Chinese Standard: Z00 Word Count Estimation: 47,483 Date of Issue: 2017-09-29 Date of Implementation: 2017-09-29 Regulation (derived from): Ministry of Environmental Protection Bulletin 2017 No. 54 Issuing agency(ies): Ministry of Ecology and Environment HJ 864.1-2017: Technical specification for application and issuance of pollutant permit Nitrogenous fertilizer industry---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. (Sewage Permits Application and Issuance Technical Specifications Fertilizer Industry - Nitrogen Fertilizer) People's Republic of China national environmental protection standards Sewage permit application and issued technical specifications Fertilizer Industry - Nitrogen Fertilizer Technical specification for application and issuance of pollutant permit Nitrogenous fertilizer industry 2017-09-29 Posted 2017-09-29 Implementation Ministry of Environmental Protection released i directory Foreword ..ii 1. Scope of application 2. Normative references .1 3. Terms and definitions .2 4. The basic situation of the sewage unit reporting requirements 2 5. Production of sewage nodes and allowable emission limits 8 6. pollution prevention and control feasible technology 7. Self-monitoring management requirements 8.Environmental management accounting records and sewage permit implementation of the preparation of the report 20 9. Actual emissions accounting method .22 10. Compliance Determination Method Appendix A (Informative) The main process and production facilities Appendix B (Informative) Environmental Management Ledger Records Refer to Table 32 Appendix C (Informative) Sewage Permits Implementation Report Compilation .40 ForewordIn order to implement the "Law of the People's Republic of China on Environmental Protection" "Law of the People's Republic of China on Prevention and Control of Atmospheric Pollution" "People's Republic of China water Law of the People's Republic of China on Prevention and Control of Pollution "and the" Notice of the General Office of the State Council on Printing and Distributing the Implementation Plan for the Control of Permits for the Release of Pollutants "(Guo Ban Fa [2016] 81), improve the technical support system for sewage permits, guide and regulate the nitrogen fertilizer industry sewage treatment units to apply for the permit and the issuance of work, the formulation of this standard. This standard specifies the application of the nitrogen fertilizer industry permit and the issuance of the basic situation of the sewage unit reporting requirements, allowable emission limits to determine the actual International emissions accounting methods, compliance methods and self-monitoring, environmental management accounting and sewage permits implementation report and other environmental management requirements, Proposed nitrogen fertilizer industrial pollution prevention and control of feasible technical requirements. When the issuing authority issues a permit for sewage disposal, if it is located at a place prohibited by the laws and regulations that explicitly prohibit the construction area, the state or local government Regulations to be eliminated or banned nitrogen fertilizer industrial sewage units or production plants, should not be issued a sewage permit. This standard Appendix A, Appendix B and Appendix C is an informative annex. This standard is released for the first time. This standard is formulated by the Ministry of Environmental Protection Planning and Finance Department, Science and Technology Standards Division. This standard was drafted. MEP Environmental Engineering Assessment Center, China Huanqiu Engineering Co., Ltd., China Nitrogen Fertilizer Industry Association, China University of Petroleum (East China), Dalian University of Technology. This standard MEP approved on September 29,.2017. This standard since September 29,.2017 come into operation. This standard is interpreted by the MEP. 1 sewage permit application and issuance of technical specifications Fertilizer Industry - nitrogen fertilizer 1. Scope of application This standard specifies the application of the nitrogen fertilizer industry permit and the issuance of the basic situation of the sewage unit reporting requirements, allowable emission limits to determine the actual International emissions accounting methods, compliance methods and self-monitoring, environmental management accounting and sewage permits implementation report and other environmental management requirements, Proposed nitrogen fertilizer industrial pollution prevention and control of feasible technical requirements. This standard applies to guide the nitrogen fertilizer industrial sewage units to fill out the "sewage permit application form" (Central Water [186] Annex 2) And fill in the relevant application information online, apply to guide the issuing authority to examine and approve the permission requirements of the nitrogen fertilizer industrial sewage permit. This standard applies to the nitrogen fertilizer industrial wastewater discharge units discharge of pollutants and air pollutants permit management, including the production of synthetic ammonia and co Ammonia into raw materials for the production of urea, ammonium nitrate, ammonium bicarbonate and ammonia production enterprises or production facilities. Among the nitrogenous fertilizer industrial sewage units, the production facilities and discharge ports that implement GB 13223 are applicable to the "Application and Certification of Sewage Discharge Permits for Thermal Power Industry (Central Water Body 〔2016〕 189 Annex 1); Implementation of GB 13271 of the production facilities and discharges with reference to the implementation of this standard until the boiler The application for a permit for sewage and the issuance of technical specifications from its provisions. This standard does not make provisions, but other industrial wastewater discharge, emissions or toxic and hazardous pollutants nitrogen fertilizer sewage treatment facilities and other sewage production facilities and Discharge port, with reference to "General Guidelines for Technical Guidelines for the Application and Issuance of Permits for Sewage Discharge".2. Normative referencesThis standard references the following documents in the terms. For undated references, the effective version applies to this standard. GB 9078 Industrial Furnace Air Pollutant Emission Standard GB 13223 Thermal Power Plant Air Pollutant Emission Standard GB 13271 Boiler air pollutant emission standards GB 13458 Ammonia Industrial Water Pollutant Emission Standard GB 14554 Odor pollutant emission standards GB 16171 coking chemical industrial pollutant discharge standards GB 16297 Integrated Air Pollutants Emission Standard Determination of Particulate Matter and Gaseous Pollutants in Exhaust of Fixed Pollution Sources GB/T 16157 HJ/T 55 Guidelines for Unorganized Emissions Monitoring of Air Pollutants HJ/T 75 Stationary Pollutant Source Discharge Continuous Monitoring Technical Specifications (Trial Implementation) HJ/T 76 Fixed Pollutant Source Discharge Continuous Monitoring System Technical Requirements and Testing Methods (Trial) HJ/T 91 Technical Specifications for Surface Water and Sewerage Monitoring HJ/T 212 pollution source online automatic monitoring (monitoring) system data transmission standards HJ/T 353 water pollution source on-line monitoring system installation technical specifications (Trial) HJ/T 354 water pollution source on-line monitoring system acceptance Technical Specifications (Trial) HJ/T 355 water pollution source on-line monitoring system operation and evaluation of technical specifications (Trial) HJ/T 356 Water Pollution Source Online Monitoring System Data Validation Technical Specifications (Trial) HJ/T 373 fixed pollution source monitoring quality assurance and quality control technical specifications (Trial) HJ/T 397 fixed source exhaust gas monitoring technical specifications 2HJ 493 Technical Specification for the Preservation and Management of Water Quality Samples HJ 494 water sampling technical guidance HJ 495 water quality sampling program design specifications HJ 819 Technical Guidelines for Self-Monitoring of Sewage Disposal Units General HJ 820 Self-Monitoring Technical Guidelines for Sewage Disposal Units Thermal Power Generation and Boilers HJ 853 sewage permit application and issuance of technical specifications of the petrochemical industry3. Terms and definitionsThe following terms and definitions apply to this standard. 3.1 nitrogen fertilizer industrial sewage unit nitrogenous fertilizer industry pollutant emission units Refers to the production of synthetic ammonia and synthetic ammonia as raw materials to produce urea, ammonium nitrate, ammonium bicarbonate and ammonia production enterprises or production facilities. 3.2 Permitted emission limits permitted emission limits Refers to the maximum allowable emission concentration (rate) and emissions of pollutants permitted by the pollutant discharge unit as stipulated in the pollutant discharge permit. 3.3 special periods special periods Refers to the country and the local deadline for compliance planning and other relevant environmental management requirements, the pollutant discharge units have special requirements Period, including heavily polluted weather during the response. 4. The basic situation of the sewage unit to fill in the request 4.1 General Provisions The pollutant discharging entity shall fill in the basic information according to the actual conditions and bear the legal liability for the authenticity, legality and completeness of the application materials submitted. 3 pollutant discharge units should be in accordance with the requirements of this standard, in the sewage permit management information platform to declare the system to fill in the "sewage permit application form" (Central Water Body [2016] 186 in Annex 2) in the corresponding information. Filing system drop-down menu is not included in the provisions of the local environmental protection department Need to fill in or sewage units that need to be reported, can add their own content. 4.2 sewage unit basic situation The basic information of the sewage disposal unit includes the name of the unit, zip code, industry type (nitrogen fertilizer industry when reporting), latitude and longitude of production and operation site Degree, whether the location belongs to the key area, whether put into production and commissioning date, EIA approval number (record number), identified or filed Symbol, the total amount of major pollutants distribution plan document symbol, the total amount of particulate matter indicators, total sulfur dioxide indicators, total nitrogen oxides indicators, Total Oxygen Demand Indicators, Ammonia Nitrogen Index, Other Total Amount of Targets (if any), etc. 4.3 main products and capacity 4.3.1 General requirements In reporting "the main products and capacity", the need to select the industry category, apply to the standard production facilities, select the nitrogen fertilizer industry; the implementation of GB 13223 production facilities to choose thermal power industry. Main Products and Capacity Fill in the main production unit, the main process, the main process, production facilities, production facilities, facility parameters, production Product name, production capacity and measurement units, the design of production time and other. 4.3.2 The main production unit Including coal preparation (coal as raw sewage units fill), raw gas preparation, feed gas purification, ammonia synthesis, urea and ammonium nitrate and other processes Unit and utility unit. 4.3.3 The main processes and processes The main processes and main processes in Appendix A in Table A.1 ~ A.3. 4.3.4 Production facilities Points required and optional content. a) Mandatory, including. 1) Facilities that characterize the production capacity of the production unit, such as the gasifier for the feed gas preparation unit; the carbonation tower for the feed gas purification unit; the ammonia synthesis unit Yuan of ammonia synthesis tower; urea unit urea synthesis tower; ammonium nitrate unit neutralization reactor; 2) Effluent wastewater production and environmental protection facilities, such as raw gas preparation unit using a fixed bed atmospheric coal gasification process scrubber, gas waste Water settling tank, gas-making recycled water cooling tower, black (gray) water treatment system for CWS or dry-air entrained gasification process, crushed coal fixed bed pressurization Gas and water separation systems for gasification processes, phenolic ammonia recovery systems, blackwater treatment systems for natural gas or partial oxidation of heavy oils, Arts condensate treatment system, ammonium nitrate unit of the process condensate treatment system; 3) Emissions exhaust gas production and environmental protection facilities, such as coal preparation unit crusher, screening machines, belt conveyors, transfer stations, etc .; raw gas system Prepared unit fixed-bed atmospheric coal gasification process vent pipe, heat recovery air blower system or waste combustion system, dry pulverized coal bed entrained flow gasification process Coal mill drying stove, pulverized coal filter, coal bunker, coke oven gas conversion process of desulfurization regeneration tank, natural gas or coke oven gas conversion process section Reformer; feed gas purification unit of the decarbonization stripping tower, low-temperature methanol wash tail gas scrubber, sulfur recovery tail gas treatment system; urea unit vent Gas scrubber, prilling tower (machine); granulation tower ammonium nitrate unit; solid product (urea, ammonium nitrate) packaging machine; production unit started heating Furnace 44) storage tanks, such as liquid ammonia tank, methanol tank, formaldehyde tank, raw oil tank, etc .; 5) water purification system to the drainage system, desalination water station, circulating cooling water, sewage treatment plants, power boilers and power plants start the whole plant pot Stove, torch torch system. b) Optional content includes. Except a), other production facilities are optional. 4.3.5 Production Facilities Number Sewage units can fill in the internal production facilities number, if the sewage unit does not have an internal production facility number, according to "fixed sources of pollution (water, large Gas) code rules (Trial) "(Central Water [2016] 189, Annex 4) Numbering and reporting. 4.3.6 Facilities parameters Facility parameters fill in the design of the number of operating hours, throughput. Emission of exhaust gas production facilities should also fill out the design emissions. 4.3.7 Product Name Fill in the main product name of each production unit. Such as raw gas preparation unit products, including crude synthesis gas, phenol, liquid ammonia, tar, raw materials gas Purification unit products include the purification of syngas, naphtha, sulfur, liquefied gas, ammonia synthesis unit products including liquid ammonia, urea unit products include Urea. 4.3.8 Production capacity and measurement units Fill in the design and production (processing) capacity of the production unit and indicate the unit of measurement. Production (processing) capacity does not include national or local government Clearly stipulated to be eliminated or banned capacity. 4.3.9 Design Year of production Environmental impact assessment documents and their approval or local governments to identify violations of the project or filing documents to determine the number of hours of production. 4.3.10 Others Sewage units need to explain the contents, you can fill in. 4.4 The main raw and auxiliary materials and fuel 4.4.1 General requirements Fill in the name of the main raw materials, auxiliary materials and fuels of each production unit, design annual usage and composition. Belongs to the original "dangerous chemicals directory." Materials, auxiliary materials and fuels should be filled in completely. 4.4.2 raw materials, accessories 4.4.2.1 Name Raw materials include coal (anthracite, bituminous coal, lignite), natural gas, coke oven gas, oil, coke and so on. Excipients, including process and wastewater treatment, waste gas treatment process added accessories. 54.4.2.2 Design Year Usage Fill in the design year usage that matches the production (processing) capacity. 4.4.2.3 Components The proportion of sulfur in raw materials is required. Can refer to the design value or the actual use of the previous year report. 4.4.3 Fuel 4.4.3.1 Name Including fuel coal, fuel oil, fuel gas, natural gas, liquefied petroleum gas, etc., in the notes indicate the production or outsourcing. 4.4.3.2 design year usage Fill in the design year usage that matches the production (processing) capacity. 4.4.3.3 Components Coal sulfur, ash, volatile, mercury content, low calorific value and other fuel sulfur content, low calorific value is required, the remaining parameters Number is optional. Can refer to the design value or the actual use of the previous year report. 4.4.4 Other Fill out the sewage unit needs to explain the content. 4.5 production of sewage nodes, pollutants and pollution control facilities 4.5.1 General requirements Sewage emissions Sewage links, pollutants and pollution control facilities, including production units or production facilities corresponding to the production of pollutants, pollutant types, Emission form (organized, unorganized), pollution control facilities, whether it is viable technology, discharge number and discharge port settings are norms and rows Leave type and so on. Sewage discharge of sewage links, pollutants and pollution control facilities, including the type of wastewater, pollutant types, whereabouts of emissions, emission laws, pollution control Management facilities, whether it is feasible technology, discharge number, the discharge port is set norms and the type of discharge. 4.5.2 Exhaust gas 4.5.2.1 Production Sewage links and types of pollutants Sewage production links include coal preparation unit coal yard, dust collection and treatment facilities; raw gas preparation unit fixed bed atmospheric coal gasification Arts of the exhaust heat recovery system or waste gas waste combustion system, gas-fired circulating water cooling tower, gas stove vent, gas-making wastewater sedimentation tank, dry pulverized coal Airflow bed gasification process of coal-fired drying stove and coal powder filter, pulverized coal feeding and pulverized coal feeding system, a natural gas conversion process Stage reformer, coke oven gas conversion process desulfurization regeneration tank, a reformer; feed gas purification unit of the decarbonization stripping tower, low-temperature methanol wash exhaust Scrubber, sulfur recovery exhaust gas treatment system, etc .; air venting tower of urea production unit, prilling tower (machine), packaging machine; ammonium nitrate production list Yuan granulation tower, packaging machine; utility unit power boiler, sewage treatment plant exhaust gas collection and treatment facilities (coal or oil as raw material), fire Torch and other sources of emissions. The types of pollutants are all pollutants, as shown in Table 1. Where there is a requirement for local emission standards, it shall be determined according to local emission standards. 64.5.2.2 Pollution Control Facilities Waste gas treatment facilities include desulfurization, denitrification, dust removal, volatile organic compounds and odor treatment. 4.5.2.3 pollution control process a) desulfurization. dry desulfurization, semi-dry desulfurization, wet desulfurization (limestone method, magnesium oxide method, ammonia method, sodium hydroxide method); b) Denitration. low nitrogen co......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 864.1-2017_English be delivered?Answer: Upon your order, we will start to translate HJ 864.1-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of HJ 864.1-2017_English with my colleagues?Answer: Yes. The purchased PDF of HJ 864.1-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |