Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

HJ 619-2011 English PDF

US$659.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
HJ 619-2011: Technical guidelines for environmental impact assessment. Constructional project of coal development
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
HJ 619-2011659 Add to Cart 5 days Technical guidelines for environmental impact assessment. Constructional project of coal development Valid

Similar standards

GB/T 24021   HJ 630   GB/T 23384   HJ 616   HJ 617   HJ 611   

Basic data

Standard ID: HJ 619-2011 (HJ619-2011)
Description (Translated English): Technical guidelines for environmental impact assessment. Constructional project of coal development
Sector / Industry: Environmental Protection Industry Standard
Classification of Chinese Standard: Z00
Classification of International Standard: 13.020
Word Count Estimation: 25,213
Date of Issue: 2011-09-01
Date of Implementation: 2012-01-01
Quoted Standard: GB 18599; HJ 2.1; HJ 2.2; HJ/T 2.3; HJ 610; HJ 2.4; HJ 19; HJ 446; HJ/T 169
Regulation (derived from): Department of Environmental Protection Notice No. 64 of 2011
Issuing agency(ies): Ministry of Ecology and Environment
Summary: This standard specifies the coal mining engineering, coal project environmental impact assessment of the basic principles, contents, methods and technical requirements. This standard applies to the territory of the People's Republic of coal mining and engineering construction project environmental impact assessment. Coal mining project environmental impact assessment of coal resources exploration activities with environmental impact assessment may refer to this standard.

HJ 619-2011: Technical guidelines for environmental impact assessment. Constructional project of coal development


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical guidelines for environmental impact assessment.Constructional project of coal development People's Republic of China National Environmental Protection Standards Environmental Impact Assessment Technology Guidelines Coal mining project Technical guidelines for environmental impact assessment Constructional project of coal development Issued on.2011-09-01 2012-01-01 implementation Issued by the Ministry of Environmental Protection

table of Contents

Preface .II 1. Scope .1 2 Normative references .1 3 Terms and definitions 4 .3 job classifications and procedures 5 normative technical requirements .3 6 Contents and Requirements .4 Appendix A (normative) Environmental Impact Statement arrangements chapter 17

Foreword

To implement the "People's Republic of China Environmental Protection Law", "People's Republic of China Environmental Impact Assessment Law" and "building items Head of Environmental Protection Ordinance "to regulate the environmental impact assessment of coal mining project, the development of this standard. This standard specifies the coal mining project, the basic principles of environmental impact assessment of coal preparation, content, methods and techniques to begging. Appendix A of this standard is a normative appendix. This standard is the first release. This standard is developed by the Ministry of Environmental Protection Science, Technology organization. This standard is mainly drafted by. China Association of Coal Processing and Utilization. This standard MEP in September 1, 2011 for approval. This standard since January 1, 2012 implementation. The standard explanation by the Ministry of Environmental Protection. Environmental Impact Assessment Technology Guidelines coal mining project

1 Scope

This standard specifies the coal mining project, the basic principles of environmental impact assessment of coal preparation, content, methods and techniques to begging. This standard applies to the impact assessment carried out in the territory of People's Republic of China coal mining and engineering construction projects environment. Evaluation and exploration of coal resources after the environmental impact assessment of the environmental impact of coal mining project can refer to this standard.

2 Normative references

This standard incorporates the following documents contain provisions. For undated references, the effective version applies to this standard quasi. GB 18599 general industrial solid waste storage and disposal site pollution control standards HJ 2.1 Environmental Impact Assessment Technology Guidelines Master HJ 2.2 Technical Guidelines for Environmental Impact Assessment of Atmospheric Environment HJ/T 2.3 Environmental Impact Assessment Technology Guidelines surface water HJ 610 Environmental Impact Assessment Technology Guidelines groundwater environment HJ 2.4 Environmental Impact Assessment Technology Guidelines make a sound environment HJ 19 Environmental Impact Assessment Technology Guidelines ecological impact HJ/T 169 Construction Project Environmental Risk Assessment Guidelines HJ 446 Cleaner production standard coal mining industry (Environmental Protection Department Order No. 2) "construction project environmental impact assessment of Classification Catalogue" "Interim Measures on Public Participation in Environmental Impact Assessment" ([2006] No. 28)

3 Terms and Definitions

The following terms and definitions apply to this standard. 3.1 Underground coal mining underground coal mining Arrival by digging coal seam roadway, exploitation of coal resources of the job (also known as underground mining). 3.2 Coal opencast coal open-pit mining Overlying rock layers peeled back to expose the seam, made of coal resource mining operations. 3.3 Wells (mine) field diggings Coal delineated by the national and provincial (municipal and autonomous regions) mineral resources department to a coal mining enterprises to mine three Weifan Wai. 3.4 PREPARATION coal preparation The use of physical or chemical methods to get rid of impurities in coal, coal is needed into different quality and specifications of the product through processing Away. 3.5 Coal preparation plant coal preparation plant Coal sorting, production of different quality and specifications of the products processing plants. 3.6 Mine water coal mine water Generating and pumping from underground to the surface of the water, including underground water gushing in the construction of coal mines and coal mining process, underground production Waste water generated in the process. 3.7 Surface mine dewatering water opencast coal mine draining water In the process of mining and opencast coal mine peel (or earlier), drainage from mines. 3.8 Opencast mine drainage opencast coal mine pit water In opencast coal mine stripping and mining process, the influx from the ground or surface water into the mining pit. 3.9 Overburden overburden In Opencast mining process, stripping of surface soil and rock seams above collectively referred to as the release thereof. 3.10 Mining subsidence mining subsidence When the underground coal mining, coal resource recovery caused by the overlying rock layers and surface occurrence of the vertical and horizontal movement and deformation over Processes and phenomena. 3.11 Water flowing fractured zone water flowing fractured zone Rock collapse within a range of belt that was broken, and has a water conductivity, it can overburden the groundwater flow The mined-out area, the scope of this part of the hydraulic conductivity of rock fracture, said water flowing fractured zone. 3.12 Gangue gangue Mining, excavation process of coal production and processing from the top, bottom, or mixed with coal in coal partings rock (waste rock excavation) and Coal Discharged during washing waste rock. 3.13 Gangue gangue yards stacked field Piled gangue venues and facilities. 3.14 CBM coal bed methane CBM commonly known as "gas", whose main component is methane (CH4), which is mainly associated gas in coal mines, is Coal-forming process through biochemical pyrolysis adsorption or free state occurs in the seam and natural gas from the reservoir rock solid body, Unconventional natural gas, it is high-quality chemical raw materials and energy. 3.15 Construction of the construction period Shaft sinking and tunnel underground work and other construction projects, industrial floor space each plant, station, storage, transportation and other production line row EC construction period, or when Opencast mining surface soil, rock stripping and transport, storage periods are referred to the construction period. 3.16 Runtime runtime Coal mining, coal transportation and coal processing projects for the period of operation. 3.17 Mine Closure of mine closure period After the expiration of coal mining projects and services, outage, shutdown, resume land use function of time for the mine closure.

4 job classification and procedures

4.1 coal mining project environmental impact assessment classification shall be in accordance with the "construction project environmental impact assessment of Classification Catalogue" Provisions relating to the determination of coal mining section. 4.2 coal mining project environmental impact assessment procedures should be in accordance HJ 2.1, HJ 2.2, HJ/T 2.3, HJ 2.4, HJ 19, HJ/T 169, the implementation of the provisions HJ 610.

5 normative technical requirements

5.1 Environmental Factors and Evaluation Factors Environmental impact assessment can select the sensitivity factors and environmental impact assessment factors based on characteristics of the project and the surrounding environment. 5.2 Standard of Evaluation Standard 5.2.1 should be performed to evaluate the implementation of the relevant environmental elements according to the environmental function area construction projects required by the State Or local environmental quality standards and pollutant discharge standards. 5.2.2 When the construction project evaluation factor is no state or local environmental quality standards and pollutant discharge standards by the national or local loop After the written consent of the administrative department of environmental protection, you may refer to the relevant standards abroad. 5.3 Assessment Grade 5.3.1 atmosphere, surface water environment, acoustic environment, ecological impact and environmental risk assessment rating Respectively, in accordance HJ 2.2, HJ/T 2.3, HJ 2.4, HJ 19, HJ/T 169 provisions, determined the atmosphere, surface water ring Environment, acoustic environment, ecological impact, evaluation of environmental risk rating. 5.3.2 Groundwater level environmental assessment Preliminary evaluation of groundwater level is determined in accordance with the requirements of HJ 610 based coal mining industry on groundwater environmental Movies Sound characteristics, based on the evaluation of groundwater environmental sensitivity and hydrogeological problems in coal mining towns have no direct impact on When water and industrial water supply or potential significance of the aquifer, or comment area do not involve centralized water supply sources and other sensitive groundwater protection When protection goals, determine appropriate drop an underground coal mining project evaluation rating. 5.4 Evaluation Scope and environmentally sensitive targets 5.4.1 atmosphere, surface water environment, ground water environment, acoustic environment and environmental risk assessment scope Respectively, in accordance HJ 2.2, HJ/T 2.3, HJ 610, HJ 2.4, HJ/T 169 stipulated in the atmosphere, surface water environment, Groundwater environment, acoustic environment impact assessment of the environmental risk assessment scoping level work. Industrial sites, road transport and air shaft site sound environmental assessment generally range plant (field) bounds 200m. 5.4.2 Ecological Impact Assessment range Initially identified the ecological impact assessment in accordance with the scope of the requirements HJ 19, underground mining project in accordance with the scope of ground subsidence into Previous reasonably determine the scope of ecological evaluation; opencast mining projects are generally outside the field, outside the boundary dump expansion 1000-2000m As coal mining ecological assessment of the scope of the project. Sensitive and environment protection objectives 5.4.3 By environmental factors or environmental impacts of the production and living facilities, were described by the sensitive coal exploitation and environmental impact Conservation objectives; to determine the sensitivity and environmental protection goals, with graphs, charts indicate the relative position of the construction project, the distance, Characteristics and protection requirements. 5.4.4 Brief Attached to protect environmentally sensitive targets (including each project along the perimeter and linear) and the scope of the evaluation factors related to FIG. 5.5 Evaluation period According to the timing characteristics of the coal mining project, the general coal mining project is divided into construction and operation periods; when the remaining The service life of less than five years, should be carried out evaluation of environmental impact of mine closure. According to China's coal mining project run length of service characteristics should be carried out in stages after timely environmental impact assessments.

6 Contents and requirements

Contents and methods of engineering analysis 6.1 6.1.1 engineering analysis a) engineering analysis to design documents as the basis; b) can be used to determine the sources of strong analogy, mass balance and discharge coefficient method; expansion (or resource integration), Technological transformation projects can be measured by. 6.1.2 engineering analysis Project profiles, production process analysis, environmental factors engineering analysis includes content analysis of the environment to be taken Measures to protect the basic content, renovation and expansion (or resource integration), technological transformation projects including existing projects exist ENVIRONMENTAL PROTECTION Protection issues "with a new band and old" requirement. 6.1.2.1 Project Overview. including project name, the scale of construction, nature of construction, construction site, project components, product solutions And flows, general layout (including industrial sites vertical design and flood control) and covers an area of occupied land types, ground transportation, Labor capacity, the construction period, the main technical and economic indicators. A project overview presentation should provide the following chart. a) Project location and traffic patterns; b) the total floor layout; c) industrial site layout plan; Composition List d) project, in accordance with the main project (including preparation plant), aided engineering, public works, transportation engineering division Column engineering content and the main technical indicators; expansion and technological transformation projects should provide comparative list of project components and indicate items Project implementation relies on the relationship between the front and rear of the sub-projects. e) Main economic indicators project. 6.1.2.2 The main content of coal resources and production process analysis are. a) coal resource occurrence conditions. Including Wells (mine) field level, reserves of coal and coal quality, coal bed methane, coal dust, coal Spontaneous combustion characteristics, content and other harmful elements; b) development plan and production process. Mine includes underground mining development plan, mining technology, the level of division, Mining Division Points and the continuity plan, mining method, and the number of the first mining area Face Face parameters, underground transport, ventilation, drainage Systems, gas drainage systems; Opencast mining division includes mining and mining area order, mining technology and mining methods, mine stripping ratio and schedule, stripping Material from the abandoned plan, Water - prevention programs; c) Surface Production System. Underground mining mine including main and auxiliary, air shaft production systems, Reject system, the production of coal preparation plant Systems and processes, coal storage and handling system, coal stacking field siting. Surface mining including coal crushing systems, production systems and processes coal preparation plant, coal storage and transportation systems, general layout, Outer dump industrial sites and siting; d) to the drainage system. Including project sub-classification of water, displacement, design documents submitted water and drainage schemes, Sewage and wastewater treatment programs; e) power supply and heating. Including project electricity load, power supply source; boiler type and quantity of heat load, fuel type And consumption; Coal f) design documents submitted were associated with resource utilization project technical features (product, size, technical indicators Etc.), location and timing of construction; g) coal resources and production process analysis should provide the following chart. Wells (mine) field state diagram; stratigraphic integrated histogram (table); Coal Seam feature table; Mining Coal Quality Characteristics table; Ida plane and open up cross-sectional view; mining area (extent) Mining succeed sequence table; the mining area and mining division sequence diagram; The main technical indicators each table Opencast mining area; Opencast mining schedule and the release schedule was abandoned row; projects located mainly Preparation of technical features list; surface production process flow diagram; Coal production flow chart and MPS; ancillary roads, The main railway line technical features list; project production, domestic water and drainage water table; project water balance diagram (table). 6.1.2.3 The main content of the environmental impact factors a) Ecological Impact Factors Description of the construction period, operation of the main ecological factors, including tying up land, mining subsidence and surface excavation damage. b) environmental impact factors According to the construction period, operation period illustrate environmental factors. The main sources of pollution and contaminants analysis should include generating source water, waste gas, solid waste, noise, emissions manner, waste Gas discharge port parameters, emissions and waste water discharge destination, etc., the number of major pollutants concentration (strength). Expansion, technological transformation projects should also make clear the original sources and pollutant emissions, current environmental problems, After the implementation of the project changes and other sources and pollutants. 6.1.2.4 environmental protection measures to be taken A brief description to be taken to control pollution, ecological restoration and Subsidence Control Measures. Environmental factors to be taken and environmental protection measures of the chart should include. Induced pollution link schematic (can be combined with surface production process flow diagram); renovation and expansion, technological transformation projects "with a new band and old" Pollution and emission of pollutants summary;; a list of measures to renovation and expansion, technological transformation projects comparison list pollutant emissions table. Investigation and Evaluation 6.2 regional natural, socio-economic situation and environmental quality before 6.2.1 Environmental Principles and Methods of Investigation 6.2.1.1 should follow the Environmental Investigation of realistic, comprehensive and systematic, focused, time domain features significant principle. Situation 6.2.1.2 Environmental Assessment scope of the investigation should be consistent with the scope of various environmental factors. Investigation 6.2.1.3 Environmental Status commonly used to collect data, field surveys and state of the environment monitoring method, remote sensing image interpretation method, Several methods can be used in combination. Remote sensing image interpretation methods, remote sensing satellite images to obtain a representative period shall be within the meaning of the season the past three years, and Fig. Member of the general spatial resolution of not less than 15m. 6.2.2 Regional Nature and Socio-Economic Survey 6.2.2.1 Traffic Survey Location. Location of construction projects, under the administrative division, geographical coordinates. 6.2.2.2 Natural Environment Survey include. a) topography. Project construction area of terrain features. b) Geology and Mineral Resources. Before the formation, geological structure, proven or exploitation of mineral resources. May Construction Geological disasters and the underlying factors that affect the project, such as the mined-out area, avalanches, landslides and debris flows. c) climate and weather. Construction projects where the main climatic characteristics of the region, meteorological parameters. d) surface water hydrologic characteristics. Hydrological Characteristics Area project is mainly surface water, water system owned division of water environment Function zoning, water quality and water use, this water project, the relat......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of HJ 619-2011_English be delivered?

Answer: Upon your order, we will start to translate HJ 619-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of HJ 619-2011_English with my colleagues?

Answer: Yes. The purchased PDF of HJ 619-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.