HJ 515-2009 English PDFUS$499.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 515-2009: Technical specifications for the supervision and management to the operation of centralized incineration disposal facilities for hazardous waste (On trial) Status: Valid
Basic dataStandard ID: HJ 515-2009 (HJ515-2009)Description (Translated English): Technical specifications for the supervision and management to the operation of centralized incineration disposal facilities for hazardous waste (On trial) Sector / Industry: Environmental Protection Industry Standard Classification of Chinese Standard: Z70 Classification of International Standard: 13.030.40 Word Count Estimation: 19,138 Date of Issue: 2009-12-29 Date of Implementation: 2010-03-01 Quoted Standard: GB 3095; GB 3096; GB 3838; GB 4387; GB 5085.1; GB 5085.2; GB 5085.3; GB 8978; GB 12348; GB 15562.1; GB 15562.2; GB 15618; GB 18484; GB 18597; GB 18598; GB 50041; GB/T 16157; HJ/T 20; HJ/T 176 Regulation (derived from): Department of Environmental Protection Notice No. 73 of 2009 Issuing agency(ies): Ministry of Ecology and Environment Summary: This standard specifies the incineration of hazardous waste disposal facilities dioxin emissions monitoring point layout, operating conditions during sampling, sampling equipment, analytical methods, quality assurance and quality control, data processing, the result expression and monitoring reports and other technical requirements. This standard applies to hazardous waste incineration facilities, medical waste incineration facilities and cement kilns co-disposal of hazardous waste facilities and acceptance of completed construction projects, supervision and monitoring of the process of dioxin monitoring. Delegate monitoring should refer to this standard. Dioxin emissions from municipal solid waste incineration facility monitoring can refer to this standard. HJ 515-2009: Technical specifications for the supervision and management to the operation of centralized incineration disposal facilities for hazardous waste (On trial)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical specifications for the supervision and management to the operation of centralized incineration disposal facilities for hazardous waste (On trial) HJ National Environmental Protection Standard of the People's Republic Hazardous waste centralized incineration disposal facility operation Supervision and Management Technical Specifications (Trial) Technical specifications for the supervision and management to the operation Of centralized incineration disposal facilities for hazardous waste(On trial) Released.2009-12-29 2010-03-01 Implementation Ministry of Environmental Protection released Ministry of Environmental Protection announcement No. 73 of.2009 To implement the Environmental Protection Law of the People's Republic of China, the Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Wastes Measures for the Administration of Business Licenses to strengthen the supervision and management of the operation process of centralized incineration facilities for hazardous wastes and medical wastes. The two standards, such as the technical supervision and management of the operation of hazardous waste centralized incineration disposal facilities (for trial implementation), are national environmental protection standards and are released. The standard name and number are as follows. 2. Technical Specifications for Operational Supervision and Management of Centralized Incineration and Disposal Facilities for Medical Waste (Trial) (HJ 516-2009) The above standards have been implemented since March 1,.2010 and published by the China Environmental Science Press. The standard content can be found on the website of the Ministry of Environmental Protection. Special announcement. December 29,.2009 ContentForeword..iv 1 Scope..1 2 Normative references..1 3 Terms and Definitions.1 4 Supervision and management procedures and requirements.. 2 5 Contents and methods of supervision and management..3 6 Supervision and implementation..4 Appendix A (Normative Appendix) Contents and methods of operation supervision and management of hazardous waste incineration disposal facilities.6ForewordTo implement the Environmental Protection Law of the People's Republic of China, the Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Wastes Measures for the Administration of Business Licenses, strengthen the supervision and management of the operation process of centralized incineration disposal facilities for hazardous wastes, and formulate this standard. This standard stipulates the supervision and management procedures, requirements, contents and supervision and management methods for the operation of centralized incineration disposal facilities for hazardous wastes. Appendix A of this standard is a normative appendix. This standard was formulated by the Science and Technology Standards Department of the Ministry of Environmental Protection. This standard is mainly drafted by. Shenyang Environmental Science Research Institute, Institute of High Energy Physics, Chinese Academy of Sciences, Environmental Protection Department of the Ministry of Environmental Protection Foreign cooperation center, National Environmental Protection Hazardous Waste Disposal Engineering Technology Center. This standard was approved by the Ministry of Environmental Protection on December 29,.2009. This standard has been implemented since March 1,.2010. This standard is explained by the Ministry of Environmental Protection. Iv Technical Specifications for Supervision and Management of Operation of Hazardous Waste Centralized Incineration and Disposal Facilities (Trial)1 Scope of applicationThis standard stipulates the supervision and management procedures, requirements, contents and supervision and management methods for the operation of centralized incineration disposal facilities for hazardous wastes. This standard is applicable to the supervision and management of the operation of centralized incineration disposal facilities for operational hazardous wastes, and the transportation of other hazardous waste incineration disposal facilities. The supervision and management during the line can be carried out with reference to this standard.2 Normative referencesThe contents of this standard refer to the terms in the following documents. For undated references, the valid version applies to this standard. GB 3095 Ambient Air Quality Standard GB 3096 Acoustic Environmental Quality Standard GB 3838 Surface Water Environmental Quality Standard GB 4387 Safety regulations for railway and road transportation within industrial enterprises GB 5085.1~3 Identification criteria for hazardous waste GB 8978 Integrated Wastewater Discharge Standard GB 12348 Environmental noise emission standards for industrial enterprises GB 15562.1 Environmental protection graphic mark discharge port (source) GB 15562.2 Environmental protection graphic sign solid waste storage (disposal) field GB 15618 Soil Environmental Quality Standard GB 18484 Hazardous Waste Incineration Pollution Control Standard GB 18597 Hazardous Waste Storage Pollution Control Standard GB 18598 Hazardous Waste Landfill Pollution Control Standard GB 50041 boiler room design specification GB/T 16157 Determination of particulate matter in gaseous sources of fixed pollution sources and sampling method of gaseous pollutants HJ/T 20 Technical Specifications for Sampling and Sample Preparation of Industrial Solid Waste HJ/T 176 Technical Specifications for Construction of Hazardous Waste Centralized Incineration Disposal Project Measures for the Administration of Dangerous Waste Business Licenses (Order No. 408 of the State Council of the People's Republic of China) National Directory of Hazardous Wastes (Organization of the Ministry of Environmental Protection, National Development and Reform Commission Order No. 1) Measures for the Administration of Hazardous Waste Transfer Joint Orders (Order No. 5 of the State Environmental Protection Administration) Guidelines for Preparing Emergency Plans for Hazardous Waste Business Units (State Environmental Protection Administration Announcement No. 48 of.2007)3 Terms and definitionsThe following terms and definitions apply to this standard. 3.1 Hazardous waste Refers to the list of national hazardous wastes or corrosive, according to the national hazardous waste identification standards and identification methods. One or more hazardous properties such as toxicity, flammability, reactivity and infectivity, and solid wastes having the above hazardous properties are not excluded. 3.2 Centralized incineration disposal facilities Refers to facilities that plan to construct and serve a certain area and use incineration methods to dispose of hazardous waste. 3.3 Supervision and management Refers to the supervision and management of the operation process of hazardous waste incineration disposal facilities, which is the local environmental protection administrative department for protection and improvement. Environment, a general term for activities such as supervision, inspection, and guidance for the operation of hazardous waste facilities. 3.4 Operational Hazardous Waste Centralized Incineration and Disposal Unit Refers to the units that meet the management scope of the “Administrative Measures for the Administration of Hazardous Wastes” and engage in the centralized incineration disposal of hazardous wastes.4 Supervision and management procedures and requirements4.1 The administrative department of environmental protection of the people's government at or above the county level and other supervision and management departments for the prevention and control of environmental pollution by hazardous wastes, The powers supervise and inspect the centralized incineration disposal facilities for hazardous wastes under their jurisdiction. 4.2 Units for centralized incineration of hazardous wastes shall actively cooperate with environmental protection administrative departments and other hazardous waste pollution prevention and control work. Supervise and manage the supervision and management activities, according to the corresponding supervision and management requirements, truthfully reflect the situation, provide the necessary information, and must not conceal, Lie, refuse, obstruct or delay. 4.3 The local environmental protection administrative department may implement the concentration of hazardous waste through written inspection, on-site inspection and remote monitoring. Supervision and management of the operation of incineration disposal facilities. 4.4 Supervision and management includes seven stages of preparation, inspection, monitoring, comprehensive analysis, feedback, rectification and review. Local environmental protection The competent administrative department may modify the procedures for adjusting supervision and management and determine the corresponding implementation plan according to the actual and needs of the work. 1) The preparation phase should include two parts. material collection and supervision and management implementation plan preparation. Material collection includes business licenses, Institutional setup, staffing, institutionalization, facility construction and operation, overall pollutant discharge, and the signing with the entrusting unit The status of the contract, etc.; the implementation plan should be prepared on the basis of material collection, and the regulatory objects, regulatory contents, procedures, methods and personnel should be clearly defined. Safety precautions, etc. 2) On-site inspection and inspection of the main facilities of the incineration and the operation and management of various auxiliary facilities shall be carried out according to the implementation plan. Read relevant records, ledgers, and verify the problems found. 3) During the monitoring phase, the pollutant discharge (exhaust gas, waste water, waste residue, noise) during the operation of the facility shall be in accordance with the requirements of the implementation plan. Etc.) to monitor, ensure the quality of monitoring, and maintain monitoring records. 4) The comprehensive analysis stage should comprehensively analyze and evaluate the overall situation of hazardous waste incineration disposal units on the basis of inspection and monitoring work. In this case, the conclusions of supervision and inspection shall be formed, and the existing problems shall be listed one by one; if rectification is required, the contents of written rectification and rectification shall be submitted. There are violations of the Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Wastes and the Measures for the Administration of Licenses for Hazardous Wastes. Where the rules and regulations act, the corresponding punishment opinions are proposed. 5) During the feedback stage, the supervision and inspection conclusions, rectification notices, and notices of punishment shall be delivered to the hazardous waste centralized combustion according to the prescribed procedures. Burn disposal unit. 6) During the rectification phase, the centralized incineration disposal unit for hazardous wastes shall be urged to rectify and submit rectification according to the results of supervision and inspection and rectification measures. report. 7) In the review and management review stage, the rectification of the centralized incineration disposal unit of hazardous waste should be reviewed and still not meet the requirements. Concentration of hazardous wastes in accordance with the Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Wastes and the Measures for the Administration of Hazardous Waste Management License The incineration disposal unit shall impose penalties such as warnings, rectification within a time limit, fines, suspension or revocation of business licenses. 4.5 Supervisory management personnel should observe the following requirements when conducting on-site inspections. 1) Supervisory management personnel should publicize and conscientiously implement the national environmental protection guidelines, policies and relevant laws and regulations during the inspection process. And standards. 2) When the supervisory management personnel conduct on-site inspections, more than two persons with corresponding administrative enforcement powers shall participate at the same time, carrying and Present relevant documents. 3) Supervising management personnel may take inquiry transcripts, on-site monitoring, sample collection, photo camera, inspection or The person will copy the relevant information and other inspection methods and keep the relevant information in a safe place. 4) The supervisory management personnel shall strictly implement the safety system during the on-site inspection and keep the technical business secrets for the inspected units. 5) The supervisory and management personnel shall make an objective and standardized record of the inspection and ask the representative of the inspected unit to confirm it. checker If the part of the inspection unit that is inconsistent with the contents of the inspection record cannot be resolved immediately, it should be recorded.5 Contents and methods of supervision and management5.1 Overall content of supervision and management The content of supervision and management of the local environmental protection administrative department shall include basic operating conditions, operation process of incineration disposal facilities, and pollution prevention. Control facility configuration and operation effects as well as safety production and labor protection measures. The local environmental protection administrative department may determine according to the actual situation. The specific content of supervision and management, in principle, the basic operating conditions of hazardous waste centralized incineration disposal units, incineration disposal facilities and supporting facilities Supervised inspection of hardware configurations such as facilities is performed only at the time of initial supervision and inspection. 5.2 Supervision and management of basic operating conditions 5.2.1 The institutional setup and personnel configuration of the centralized incineration disposal unit of hazardous waste complies with relevant policies, laws, regulations and standards. 5.2.2 Application and renewal of hazardous waste business licenses. 5.2.3 Acceptance of hazardous waste incineration technologies, processes and projects. 5.2.4 The rules and regulations of the centralized incineration disposal unit of hazardous waste shall include at least. the operation and management record system of the facility, Handover record system, hazardous waste receiving management system, hazardous waste analysis system, internal supervision and management system, facility operation and operation procedures, Laboratory (laboratory) characteristic pollutant detection program and implementation rules, emergency plan for accidents during operation of the disposal facility, safety production and labor Dynamic protection management system, personnel training system and environmental monitoring system. 5.2.5 Accident emergency plan for centralized incineration disposal of hazardous waste. The emergency plan shall be prepared according to the "Hazardous Waste Business Unit" The Guide to the Plan and other relevant local regulations are prepared and approved. 5.3 Supervision and management of the operation of hazardous waste incineration facilities 5.3.1 Supervision and management of the operation of hazardous waste incineration disposal facilities shall include at least. the receipt of hazardous waste and the distribution of hazardous waste. Analysis of identification, in-plant storage and pre-treatment of hazardous waste, operation of hazardous waste incineration facilities, etc. 5.3.2 The receipt of hazardous wastes should include special access channels and signs for hazardous wastes, pre-inspection of hazardous wastes, and transfer system for hazardous wastes. Execution and unloading of hazardous waste. 5.3.3 Analysis and identification of hazardous wastes should include the basic conditions for analysis and identification, the identification content of hazardous wastes, and the identification of hazardous waste characteristics. Registration management, preservation of characteristic identification data, sampling and analysis, and classification management of hazardous waste. 5.3.4 Hazardous waste storage facilities should include hazardous waste storage containers and hazardous waste storage facilities. 5.3.5 The hazardous waste incineration disposal system shall include the configuration of the incineration disposal facility and the operation of the incineration disposal process. 5.3.6 Hazardous Waste Disposal Ancillary facilities should include pretreatment and feed systems, thermal energy utilization systems, flue gas purification systems, slag and fly ash Processing system, automation control and online monitoring system, supervision and management content should include system configuration and operation. 5.4 Supervision and management of pollution prevention facilities configuration and treatment effects 5.4.1 The performance indicators of the incineration disposal facilities and the air pollutant emission control indicators shall comply with the requirements of GB 18484, and the ambient air around the plant area. Quality, all indicators should meet the requirements of GB 3095. 5.4.2 Bottom slag, fly ash, incineration process, waste gas generated by hazardous waste incineration process, waste activated carbon, filter cake, etc. are dangerous Waste shall be sent to a hazardous waste landfill in accordance with GB 18598 for safe landfill disposal. 5.4.3 The discharge of waste water from the centralized incineration disposal unit of hazardous wastes shall comply with the requirements of GB 8978. 5.4.4 The noise emission from the centralized incineration disposal unit of hazardous wastes shall comply with the requirements of GB 12348. 5.5 Supervision and management of safe production and labor protection 5.5.1 Hazardous waste centralized incineration disposal units should implement HJ/T 176 and other national safety production related aspects in terms of safety production. Provisions. 5.5.2 Hazardous waste centralized incineration disposal unit should implement HJ/T 176 and other national labor protection related aspects of labor protection. Provisions. 5.6 Monitoring management requirements 5.6.1 Environmental monitoring shall include two parts. monitoring of pollutant discharge in incineration facilities and environmental monitoring of centralized incineration disposal units of hazardous wastes. Pollutant emissions monitoring should monitor flue gas, fly ash, slag, process wastewater and noise according to relevant standards. Environmental monitoring should be based on hazards The discharge of pollutants from centralized waste incineration disposal units monitors ambient air, groundwater, surface water, soil and environmental noise. 5.6.2 The supervision and monitoring activities carried out......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 515-2009_English be delivered?Answer: Upon your order, we will start to translate HJ 515-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of HJ 515-2009_English with my colleagues?Answer: Yes. The purchased PDF of HJ 515-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |