HJ 406-2021 English PDFUS$649.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 406-2021: Technical specifications for acceptance of environmental protection facilities for completed construction projects - Ethylene engineering Status: Valid HJ 406: Historical versions
Basic dataStandard ID: HJ 406-2021 (HJ406-2021)Description (Translated English): Technical specifications for acceptance of environmental protection facilities for completed construction projects - Ethylene engineering Sector / Industry: Environmental Protection Industry Standard Classification of Chinese Standard: Z01 Word Count Estimation: 28,212 Issuing agency(ies): Ministry of Ecology and Environment HJ 406-2021: Technical specifications for acceptance of environmental protection facilities for completed construction projects - Ethylene engineering---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. (Technical Specifications for Acceptance of Environmental Protection Facilities for Completion of Construction Projects Ethylene Project (Release Draft)) National Ecological Environment Standard of the People's Republic of China Replacing HJ/T 406-2007 Technical Specifications for Acceptance and Acceptance of Environmental Protection Facilities for Completion of Construction Projects Ethylene Engineering Technical specifications for acceptance of environmental protection facilities for completed construction projects -- Ethylene engineering This electronic version is the official standard text, which is reviewed and typeset by the Environmental Standards Institute of the Ministry of Ecology and Environment. Published on 2021-11-25 2021-11-25 Implementation Released by the Ministry of Ecology and Environment directory Foreword...ii 1 Scope...1 2 Normative references...1 3 Terms and Definitions...2 4 Acceptance work procedures...2 5 Start acceptance...3 6 Acceptance self-inspection...3 7 Compile the acceptance monitoring plan...4 8 Implement acceptance monitoring and inspection...6 9 Prepare the acceptance monitoring report (table)...7 10 Follow-up acceptance work...8 Appendix A (Informative Appendix) List of Ethylene Engineering Products...9 Appendix B (informative appendix) Acceptance work procedure diagram...10 Appendix C (informative appendix) Checklist of materials...11 Appendix D (informative appendix) Acceptance self-examination content table...12 Appendix E (informative appendix) Contents of the acceptance monitoring plan...16 Appendix F (informative appendix) Recommended monitoring and analysis methods...19 Appendix G (informative appendix) Recommended method for follow-up acceptance work... 23 Technical Specifications for Acceptance of Environmental Protection Facilities for Completion of Construction Projects Ethylene Engineering 1 Scope of applicationThis standard specifies the work procedures and general requirements for the acceptance of environmental protection facilities for the completion of ethylene projects, and proposes start-up acceptance, acceptance self-inspection, Technical requirements for compiling acceptance monitoring plans, implementing acceptance monitoring and inspection, and compiling acceptance monitoring reports (tables). This standard applies to the acceptance of environmental protection facilities for ethylene projects completed. In the ethylene project, the completed environmental protection facility acceptance work of the self-provided thermal power generating unit (plant) shall be carried out in accordance with HJ/T 255, and the dock and other ecological The acceptance check of the completed environmental protection facilities for the impacted projects shall be carried out in accordance with HJ/T 394. Other contents not stipulated in this standard shall be in accordance with the Pollution Impact Category of the Technical Guidelines for Environmental Protection Acceptance of Construction Projects (Ministry of Ecology and Environment) Report No. 9 of.2018) Annex implementation.2 Normative referencesThis standard refers to the following documents or clauses thereof. For dated references, only the dated version applies to this standard. For undated references, the latest edition (including all amendments) applies to this standard. GB 3096 Acoustic Environment Quality Standard GB 5085.7 General Rules for Identification Standard of Hazardous Waste GB 12348 Industrial Enterprise Boundary Environmental Noise Emission Standard GB 13271 Boiler Air Pollutant Emission Standard GB 14554 Emission Standard of Odor Pollutants GB 16297 Comprehensive Emission Standard of Air Pollutants GB 18484 Standard for Pollution Control of Hazardous Waste Incineration GB 18597 Hazardous Waste Storage Pollution Control Standard GB 18599 General Industrial Solid Waste Storage and Landfill Pollution Control Standard GB 31571 Pollutant discharge standard for petrochemical industry GB 34330 General Rules for the Identification Standard of Solid Waste GB/T 8170 Numerical Rounding Rules and Representation and Judgment of Limit Values GB/T 14581 Technical Guidelines for Sampling of Water Quality in Lakes and Reservoirs GB/T 16157 Determination of particulate matter in exhaust gas from stationary pollution sources and sampling methods for gaseous pollutants HJ/T 52 Technical Guidance for Water Quality River Sampling HJ/T 55 Technical guidelines for monitoring fugitive emissions of air pollutants HJ 75 Technical Specification for Continuous Monitoring of Flue Gas (SO2, NOx, Particulate Matter) Emissions from Stationary Pollution Sources HJ 76 Technical requirements and testing methods for continuous monitoring system for emission of flue gas (SO2, NOx, particulate matter) from stationary sources HJ/T 91 Technical Specification for Surface Water and Sewage Monitoring HJ 91.1 Technical Specification for Wastewater Monitoring HJ/T 92 Technical Specifications for Monitoring Total Discharge of Water Pollutants HJ 164 Technical Specification for Groundwater Environmental Monitoring HJ/T 166 Technical Specification for Soil Environment Monitoring HJ 194 Technical Specification for Manual Monitoring of Ambient Air Quality HJ/T 255 Technical Specifications for Environmental Protection Acceptance of Completion of Construction Projects for Thermal Power Plants5 Start acceptance5.1 Collect acceptance data The collected acceptance data includes environmental protection data, engineering data related to environmental protection, and drawing data. For the list of acceptance documents, please refer to the attached Record C. 5.2 Develop an acceptance work plan Formulate the acceptance work plan, clarify the acceptance monitoring method of the enterprise's self-test or entrust the technical organization to monitor, and the acceptance work schedule. 6 Acceptance self-check 6.1 Purpose of self-examination Self-inspection on the implementation of environmental protection procedures, the completion of projects and environmental protection facilities, and the environmental impact report (form) and its The consistency of the approval decision of the approval department, to determine whether it has the conditions to carry out the acceptance work as planned; self-check the distribution of pollution sources and pollutant discharge The situation and the setting of the discharge outlet, etc., are used as the basis for formulating the acceptance monitoring plan. 6.2 Self-inspection content 6.2.1 Implementation of environmental protection procedures The performance of environmental protection formalities includes the project environmental impact report (form) and its approval by the approval department; if there is a major change, the The completion of the corresponding approval procedures; the implementation of the project supervision, inspection and rectification requirements by the national and local ecological environment authorities; License application, etc. 6.2.2 Construction of the project Comparing with the environmental impact report (table) and the approval decision of the approval department, self-examination of the main project, storage and transportation projects, public and auxiliary projects and compliance Construction of supporting projects, etc. See Table D.1 to Table D.4 in Appendix D for the content of self-inspection. 6.2.3 Completion of environmental protection facilities 6.2.3.1 Pollution control/disposal facilities Comparing with the environmental impact report (form) and the approval decision of the approval department, self-examination of waste gas, waste water, noise, solid waste pollution control/ The completion of disposal facilities shall be used as the basis for determining the monitoring contents such as monitoring points and factors in the acceptance monitoring plan. See Appendix D for the content of the self-examination In Table D.5 to Table D.8. 6.2.3.2 Construction of other environmental protection facilities Comparing with the environmental impact report (form) and the approval decision of the approval department, self-inspect the completion of other required supporting environmental protection facilities, As the basis for determining the inspection content in the acceptance monitoring plan. See Table D.9 in Appendix D for the content of self-inspection. 6.3 Self-examination results Or the environmental impact report (form) has not been approved, and the environmental impact report (form) and the approval decision of the approval department have not been approved. Environmental protection facilities, and those who should have obtained but have not obtained a pollutant discharge permit, should go through relevant procedures or rectify before continuing the acceptance work. The self-inspection found that the location of the pollutant discharge outlet or the pollutant discharge method, the discharge destination, the number of pollutant discharge outlets or the type of pollutant discharge. If the pollutant discharge permit is inconsistent with the pollutant discharge permit, a new pollutant discharge permit shall be applied in accordance with the provisions of the Regulations on the Administration of Pollutant Discharge Permits. If the discharge outlet does not meet the monitoring conditions, such as the sampling platform and sampling hole setting are not standardized, it should be rectified in time to ensure the quality of the on-site monitoring data. Quantity and monitoring personnel safety.7 Prepare the acceptance monitoring plan7.1 Compilation principle of acceptance monitoring plan Ethylene engineering enterprises should determine the project acceptance monitoring content according to the results of the acceptance self-inspection, and formulate an acceptance monitoring plan. For a project with a simple content, the content of the acceptance monitoring plan can be appropriately simplified, but it should include acceptance execution standards, monitoring points, monitoring factors, monitoring frequency, etc. 7.2 Contents and requirements of acceptance monitoring plan 7.2.1 Contents of acceptance monitoring plan The content of the acceptance monitoring plan generally includes the project overview, acceptance basis, project construction, environmental protection facilities, acceptance implementation standards, Acceptance monitoring content, quality assurance and quality control, etc. See Appendix E for the content of the acceptance monitoring plan, and the recommended monitoring and analysis methods for acceptance monitoring refer to See Appendix F. 7.2.2 Acceptance Execution Criteria Acceptance and implementation standards include pollutant discharge standards and ecological environment quality standards. The relevant requirements of the annex to the Technical Guidelines for Pollution Impacts” shall be implemented. The emission and control of air pollutants and water pollutants in ethylene engineering projects and their production facilities mainly implement GB 31571, Odor Pollutants GB 14554 for emissions, GB 13271 for supporting power boilers (non-thermal power generating units), and tail gas from hazardous waste incinerators GB 18484, GB 12348 for environmental noise at factory boundaries, GB 5085.7, GB 34330, GB for solid waste identification, utilization and disposal 18597, GB 18599, etc. The environmental impact report (form) and the approval decision of the approval department or the standards or limits required by the pollutant discharge permit If the value is stricter than the above-mentioned standard, its stipulation shall prevail. The environmental quality assessment around the ethylene project shall implement the currently valid ecological environment quality standards. The treatment efficiency of environmental protection facilities shall be implemented in accordance with the relevant standards and the approval decision of the environmental impact report (form) approval department. 7.2.3 Contents of acceptance monitoring 7.2.3.1 Effect monitoring of commissioning and operation of environmental protection facilities a) Pollutant emission monitoring 1) Monitoring of organized waste gas emissions, and monitoring of unorganized waste gas emissions at the factory boundary. 2) Pollutant discharge monitoring of workshop or production facility waste water discharge outlets, total waste water discharge outlets, and rainwater discharge outlets (when there is flowing water), Wastewater monitoring with reuse or indirect discharge requirements in the environmental impact report (form) and its approval decision by the approval department. 3) Monitoring of environmental noise at the factory boundary. b) Monitoring of treatment efficiency of environmental protection facilities Relevant standards, environmental impact reports (forms) approval departments have requirements for the treatment efficiency of environmental protection facilities in the approval decision, should be carried out. When the amount is the same, the concentration value can be directly used to calculate the treatment efficiency. f) According to the requirements of GB/T 8170 and HJ 630, the judgment, processing and data revision of abnormal values shall be carried out. 9 Prepare acceptance monitoring report (table) 9.1 Main content of acceptance monitoring report (table) The main contents of the acceptance monitoring report (table) should include the project overview, acceptance basis, project construction, environmental protection facilities, acceptance Implementation standards, acceptance monitoring content, quality assurance and quality control results, acceptance monitoring results and acceptance monitoring conclusions. Acceptance monitoring report (table) For the recommended format, please refer to Appendix 2 in the Appendix of the "Technical Guidelines for Environmental Protection Acceptance of Construction Projects Completion and Pollution Impacts". 9.2 Quality Assurance and Quality Control Results On the basis of the "Quality Assurance and Quality Control" chapter of the acceptance monitoring plan, supplement the ability of the personnel participating in the acceptance monitoring. Indicate the quality assurance and quality control measures taken, and list the names, models, number, corresponding calibration, quality assurance and quality control results, etc. 9.3 Acceptance monitoring results 9.3.1 Production conditions The list describes the actual working conditions during the monitoring period, the key parameters that determine or affect the working conditions, and the main parameters that reflect the operating status of the environmental protection facilities. To index. 9.3.2 Effect of commissioning and operation of environmental protection facilities 9.3.2.1 Pollutant discharge monitoring results According to the acceptance monitoring data, evaluate whether the monitoring results of waste gas, waste water, and boundary environmental noise meet the relevant standards. According to the monitoring results of the "new and old" facilities, evaluate whether the pollutant discharge meets the requirements of relevant standards. 9.3.2.2 Monitoring results of treatment efficiency of environmental protection facilities Calculate the treatment efficiency of major pollutants and evaluate the treatment efficiency of environmental protection facilities according to the monitoring results of the inlet and outlet of waste gas and wastewater treatment facilities Whether the rate complies with the relevant standards and the approval decision requirements of the environmental impact report (form) approval department. If it does not meet the requirements, the reasons should be analyzed. If the monitoring conditions are not monitored, the reasons shall be explained. 9.3.3 Impact of project construction on environmental quality According to the acceptance monitoring data, evaluate the environmental quality of environmental sensitive targets such as ambient air, surface water, groundwater, seawater, acoustic environment, soil, etc. Whether the monitoring results meet the relevant standards. If it exceeds the standard, the reasons should be analyzed. For monitoring factors without evaluation criteria, just list Monitoring results, not evaluation. 9.4 Acceptance monitoring conclusion 9.4.1 Effect of commissioning and operation of environmental protection facilities 9.4.1.1 Pollutant discharge monitoring results Briefly describe whether the monitoring results of various pollutants such as waste gas, waste water, and boundary environmental noise meet the requirements of relevant standards. 9.4.1.2 Monitoring results of treatment efficiency of environmental protection facilities Briefly describe whether the treatment efficiency of major pollutants in environmental protection facilities such as waste gas and waste water complies with relevant standards, and the environmental impact report (form) review Approval decision requirements of the approval department. 9.4.2 Impact of project construction on environmental quality If environmental quality monitoring is involved, evaluate the ambient air, surface water, groundwater, seawater, acoustic environment, soil and other sensitive targets surrounding the project. Whether the results of environmental quality monitoring such as soil meet the relevant standards. 9.4.3 Implementation of environmental protection facilities Briefly describe whether the environmental impact report (form) and the approval decision of the approval department have implemented the waste gas, waste water and noise treatment facilities, solid Waste utilization and disposal facilities, environmental risk prevention facilities, groundwater pollution prevention and control facilities, soil pollution prevention and control facilities, online monitoring facilities, The requirements of various environmental protection facilities such as "new and old" facilities. 9.5 Attachment of acceptance monitoring report (table) The annex to the report is the main proof or supporting materials involved in the content of the acceptance monitoring report (table), mainly including the environmental impact of the approval department Approval decision of report (table), monitoring data report, description of project changes, agreement on entrusted utilization and disposal of hazardous waste and disposal unit Qualification certificate, etc. 10 Follow-up acceptance work After the acceptance monitoring report is completed, enter the follow-up acceptance work procedure, put forward acceptance opinions, and prepare "other matters that need to be explained". Form an acceptance report and disclose it to the public, log in to the National Construction Project Completion Environmental Protection Acceptance Information System Platform to fill in relevant information, and establish a file case. Refer to Appendix G for the recommended method for subsequent acceptance work. Acceptance opinions shall include the basic situation of project construction, project changes, implementation of environmental protection facilities, commissioning and operation of environmental protection facilities. The effect of the project, the impact of the project construction on the environment, the main problems existing in the project, the acceptance conclusion and the follow-up requirements. "Other Items to be Explained" should truthfully re......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 406-2021_English be delivered?Answer: Upon your order, we will start to translate HJ 406-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of HJ 406-2021_English with my colleagues?Answer: Yes. The purchased PDF of HJ 406-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version HJ 406-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version HJ 406-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |