HJ 2019-2012 English PDFUS$529.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 2019-2012: Technical specifications for wastewater treatment and reuse of iron and steel industry Status: Valid
Basic dataStandard ID: HJ 2019-2012 (HJ2019-2012)Description (Translated English): Technical specifications for wastewater treatment and reuse of iron and steel industry Sector / Industry: Environmental Protection Industry Standard Classification of Chinese Standard: Z61 Classification of International Standard: 13.030.20 Word Count Estimation: 20,261 Quoted Standard: GB 12348; GB 13456; GB 16297; GB 50013; GB 50014; GB 50016; GB 50019; GB 50040; GB 50050; GB 50052; GB 50053; GB 50054; GB 50168; GB 50194; GB 50275; GB 50303; GB 50335; GB 50506; GB 50672; GBJ 22; GBJ 87; HG/T 2124; HG/T 2125; HG/T 2126; HJ/T 243; HJ/T 2 Regulation (derived from): Department of Environmental Protection Notice No. 61 of 2012 Issuing agency(ies): Ministry of Ecology and Environment Summary: This standard specifies the steel industry production units (excluding coking) technical requirements for wastewater treatment and reuse engineering principles, as well as integrated wastewater treatment and reuse of the overall project requirements, proc HJ 2019-2012: Technical specifications for wastewater treatment and reuse of iron and steel industry---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical specifications for wastewater treatment and reuse of iron and steel industry National Environmental Protection Standard of the People's Republic Technical specification for steel industry wastewater treatment and reuse engineering Technical specifications for waste water treatment and reuse Of iron and steel industry Published on.2012-10-17 2013-1-1 implementation Ministry of Environmental Protection released ContentForeword.ii 1 Scope.1 2 Normative references.1 3 Terms and Definitions 2 4 Contaminants and pollution loads 3 5 General requirements. 4 6 Process Design.5 7 Main process equipment and materials 13 8 Detection and Process Control..15 9 Major auxiliary works 16 10 Labor safety and occupational health 17 11 Construction and acceptance. 18 12 Operation and maintenance.19ForewordTo implement the Environmental Protection Law of the People's Republic of China, the Law of the People's Republic of China on Water Pollution Prevention and Control, and the Iron and Steel Industry Water Pollutant Emission Standards, which regulate the construction and operation management of steel industry wastewater treatment and reuse projects, environmental pollution, and protection This standard is formulated to protect the environment and human health. This standard specifies the general requirements, process design, main process equipment and materials for the treatment and reuse of steel industry wastewater. Technical requirements for materials, testing and control, construction, acceptance and operation. This standard is the first release. This standard was formulated by the Science and Technology Standards Department of the Ministry of Environmental Protection. This standard was drafted. China Metallurgical Construction Research Institute Co., Ltd. This standard was approved by the Ministry of Environmental Protection on October 17,.2012. This standard has been implemented since January 1,.2013. This standard is explained by the Ministry of Environmental Protection. Technical specification for steel industry wastewater treatment and reuse engineering1 Scope of applicationThis standard specifies the technical requirements and reuse principles for wastewater treatment engineering of steel industry production units (excluding coking), and General requirements, process technology, design parameters, equipment and materials, testing and control, and application of comprehensive sewage treatment and reuse projects Technical requirements for work, acceptance and operation. This standard applies to the process control and comprehensive wastewater treatment and reuse of waste water treatment and reuse in the production unit of the steel industry. Cheng, can be used as an environmental impact assessment for steel industry construction projects, environmental protection facilities design and construction, construction project completion environment The technical basis for the protection and acceptance and operation and management after completion.2 Normative referencesThe contents of this specification refer to the terms in the following documents. For undated references, the valid version applies to this specification. GB 12348 Environmental noise emission standards for industrial enterprises GB 13456 Water Industry Pollutant Emission Standard GB 16297 Integrated emission standards for atmospheric pollutants GB 50013 Outdoor Water Supply Design Code GB 50014 Outdoor Drainage Design Code GB 50016 Building Design Fire Code GB 50019 Heating, Ventilation and Air Conditioning Design Code GB 50040 power machine basic design specification GB 50050 industrial circulating cooling water treatment design specification GB 50052 design specification for power distribution system GB 50053 10kV and below substation design specifications GB 50054 Low Voltage Distribution Design Specification GB 50168 Electrical installation engineering Rotating electrical machine construction and acceptance specifications GB 50194 Safety requirements for power supply at construction site GB 50275 Compressor, fan, pump installation engineering construction and acceptance specifications GB 50303 Building electrical engineering construction quality acceptance specification GB 50335 Wastewater Recycling Engineering Design Specification GB 50506 Steel Enterprise Water Saving Design Specification GB 50672 Process design specification for comprehensive sewage treatment plant of iron and steel enterprises GB J 22 Factory Mine Road Design Code GB J 87 Industrial Enterprise Boundary Noise Control Design Specification GBZ 1 industrial enterprise design hygiene standard HJ/T 250 Environmental Protection Products Technical Requirements Rotary Fine Grille HJ/T 251 environmental protection product technical requirements Roots blower HJ/T 257 Environmental Protection Product Technical Requirements Electrolytic chlorine dioxide synergistic disinfectant generator HJ/T 258 Environmental Protection Products Technical Requirements Electrolytic Sodium Hypochlorite Generator HJ/T 262 environmental protection product technical requirements grille decontamination machine HJ/T 272 Environmental Protection Products Technical Requirements Chemical Process Chlorine Dioxide Disinfectant Generator HJ/T 279 environmental protection product technical requirements push flow submersible mixer HJ/T 283 environmental protection product technical requirements vane filter and plate and frame filter HJ/T 336 Environmental Protection Product Technical Requirements Submersible Sewage Pump HJ/T 369 Environmental Protection Product Technical Requirements Dosing Device for Water Treatment HJ/T 353 Water Pollution Source Online Monitoring System Installation Technical Specification (Trial) HJ/T 354 water pollution source online monitoring system acceptance technical specification Technical specification for operation and maintenance of HJ/T 355 wastewater online monitoring system "Design Manual for Water Supply and Sewerage in the Iron and Steel Industry" Measures for Completion and Acceptance of Construction Projects (Engineering) (National Planning Commission Construction [1990] No. 215) Measures for the Administration of Environmental Protection Completion Acceptance of Construction Projects (Order No. 13 of the State Environmental Protection Administration)3 Terms and definitionsThe following terms and definitions apply to this specification. 3.1 waste water from iron and steel industry Wastewater from various production units and auxiliary facilities in the steel industry. 3.2 waste water from the unit of iron and steel industry Waste water produced by various production processes (such as raw materials, sintering, iron making, steel making, steel rolling, etc.) in the steel production process. 3.3 Synthetic sewage from iron and steel industry Wastewater discharged and transported by the drainage system of the iron and steel enterprise plant. 3.4 concentrated salt-containing wastewater concentrated salt-containing wastewater Industrial wastewater with a salt content greater than or equal to.2000 mg/L. 3.5 integrated clarifier all-in-one sediment tank The special mud pump is used to promote the external circulation of the activated sludge in the pool, and the impurity particles in the sewage are in contact with the formed sludge. Flocculation and separation, a combination of flocculation, clarification, sedimentation and residual mud enrichment.4 Contaminants and pollution loads4.1 Wastewater sources and major pollutants The steel industry wastewater comes from the production process water, equipment and product cooling water, equipment and site cleaning water. Waste Water contains raw materials, intermediates and products that are lost with water, as well as contaminants produced during production. Wastewater source See Table 1 for major pollutants. Table 1 Sources and main pollutants of steel industry wastewater Production unit wastewater type source main pollutants and load Raw material raw material field wastewater discharge dust removal, flushing floor SS sintering Flushing tape, floor wastewater Rinse the mixing tape, rinse Floor SS concentration is generally 5000mg/L Wet dust collector wastewater wet scrubber Mainly SS, the concentration is generally 5000~10000mg/L, Among them, TFe accounts for 40%~45% Desulfurization waste liquid sintering machine flue gas desulfurization pH. 4~6, SS, Cl-high, mercury, lead, arsenic, zinc, etc. heavy metal ion Ironmaking Blast furnace gas washing wastewater Blast furnace gas washing and purification system System, pipe water seal SS, COD, etc., containing a small amount of phenol, cyanide, Zn, Pb, Sulphide and heat pollution. Where the SS concentration is 1000~5000mg/L, cyanide 0.1~10 mg/L, phenol 0.05~3 mg/L Slag granulation wastewater treatment system Mainly SS, concentration is 600~1500mg/L, cyanidation 0.002~1mg/L, phenol 0.01~0.08 mg/L The cast iron machine spray cooling waste water cast iron machine is mainly SS, the concentration is 300~3500mg/L Steel making Converter flue gas wet dust removal wastewater wet dust collector Unburned wastewater SS is mainly FeO, combustion wastewater SS is mainly Fe2O3, and the SS concentration is generally 3000~20000mg/L The refining device pumping and condensing wastewater refining device is mainly SS, and the concentration is 150~1000mg/L. Continuous casting production wastewater Two cold spray cooling, flame cutting Cutting machine, slab steel slag granulation Mainly SS, iron oxide, grease, SS concentration is 200~2000mg/L, oil 20~50mg/L Flame cleaning machine waste flame cleaning machine, gas cleaning Mainly SS, iron oxide, grease, SS concentration is 400~1500mg/L Production unit wastewater type source main pollutants and load Rolling steel (hot rolling) Hot rolling production wastewater Roller support roller, coiler, Descaling, roller conveyor, etc. Iron sheet Mainly iron oxide scale, grease, SS concentration is 200~4000mg/L, oil 20~50mg/L Rolling steel (cold rolling) Cold rolling acid-base wastewater pickling line, rolling line acid, alkali Cold rolling oil and emulsion wastewater Cold rolling mill, grinding roller, belt Steel degreasing unit and oil depot Lubricating oil and hydraulic oil Cold rolling chromium-containing wastewater Hot-dip galvanizing unit, electro-galvanizing, Electroplating tin and other units Heavy metal ions such as chromium, zinc and lead Self-provided power plant high-salt wastewater Desalting station backwashing or softening station Regeneration drainage Acid and alkali 4.2 Wastewater volume and pollution load 4.2.1 The amount of wastewater produced in the steel production unit shall be determined as follows. a) New steel enterprises should be calculated according to the water quality and water quality balance of each production unit, and determined by analogy verification; b) The steel enterprises that are to be rebuilt or expanded shall be determined according to the measured data of the measuring instruments set in the water supply and drainage system of each production unit; c) When there is no meter, it can be based on similar product varieties, production process, production scale, work system and management water The flat business analogy is ok. 4.2.2 The amount of water in the integrated sewage of the steel industry shall be calculated based on the sum of the displacements of the drains. 4.2.3 The pollution load of the steel production unit wastewater can be calculated according to the wastewater discharge amount and pollutant concentration of the corresponding production unit. Estimation; the pollution load of the integrated sewage can be estimated based on continuous sampling on site or based on the water quality of the drainage system.5 General requirements5.1 General provisions 5.1.1 In addition to complying with this standard, the steel industry wastewater treatment and reuse engineering technology should also comply with the relevant national standards. And the provisions of the specification. 5.1.2 Steel industry wastewater treatment and reuse project should be rationally matched with the overall planning and production process of iron and steel enterprise production development The set adopts high-efficiency, safe and reliable treatment process to ensure the water safety of the enterprise. 5.1.3 Steel industry wastewater treatment and reuse projects shall be controlled in accordance with the principle of cleaner production, and shall be controlled by the following Three important aspects of organic composition. the use of technology to reduce or eliminate pollutants entering the water at the source of production units; An effective circulating water treatment system; the end of the total discharge sewage treatment and reuse. 5.1.4 Steel industry wastewater treatment and reuse projects should be equipped with relevant online testing instruments to ensure the safety of wastewater treatment systems Reliable, continuous and stable operation. 5.1.5 The waste water of each production unit of the iron and steel enterprise shall be recycled after being collected and treated. Raw material field, sintering and iron making in new enterprises The production unit should be substantially free of waste water. 5.1.6 Iron and steel enterprises should construct integrated sewage treatment facilities, and collect and treat the integrated sewage to meet the user's water quality requirements. For use, the external drainage should meet the requirements of GB 13456. 5.1.7 The external discharge outlets of iron and steel enterprises shall be equipped with on-line monitoring devices for pollution sources, and in accordance with the national technical regulations on pollution source monitoring. Regulations are enforced. 5.2 Project composition 5.2.1 The main body of wastewater treatment and reuse of steel production unit is mainly composed of circulating water treatment, wastewater treatment, cascade water supply, etc. Body technology and supporting auxiliary facilities. 5.2.2 The integrated sewage treatment facility consists of a pretreatment process, a main process and ancillary auxiliary works. 5.3 Site selection 5.3.1 The site selection of wastewater treatment and reuse projects shall be in accordance with the overall planning of the iron and steel enterprise and the professional design requirements for water supply and drainage. 5.3.2 The site selection of integrated sewage treatment facilities shall comply with the provisions of GB 50672. 5.4 General layout 5.4.1 The general layout should consider the requirements of the process flow and the site conditions, and follow the principle of saving land, so that the general plan The layout is compact and the pipe distance is as short as possible. 5.4.2 The vertical design of the process should be designed to reduce energy consumption, reduce the number of lifts, and reduce the smooth drainage. Small head loss. 5.4.3 The dosing room and sludge treatment room should be placed in relatively independent areas and close to the road. 5.4.4 The setting of roads in the factory area shall meet the requirements for transportation, fire protection, greening and laying of various pipelines.6 Process design6.1 General requirements 6.1.1 The choice of wastewater treatment process should be based on the requirements of wastewater quality and post-treatment water quality, Under the premise of meeting the discharge standards, we will choose a mature and advanced, stable and economically reasonable technical route to achieve recycling as much as possible. 6.1.2 The design of the wastewater treatment process should consider that any structure or equipment can still guarantee output when it is shut down due to maintenance and cleaning. Meet the production requirements of qualified water quality and water requirements. 6.2 Wastewater collection facilities 6.2.1 The collection of wastewater from steel production units shall be carried out by means of a “drainage and diversion” diversion system, which shall be collected and treated separately. Reuse. 6.2.2 Exhaust wastewater from each production unit (except cold-rolled wastewater and concentrated salt wastewater) shall be collected and transported through the drainage system of the plant. Send it to the integrated sewage treatment facility for disposal. 6.3 Wastewater treatment and reuse of production units 6.3.1 The wastewater of the production unit shall follow the principle of multi-purpose and comprehensive utilization of water, and be combined with the overall circulating water system of the enterprise. Form a complete large-circulation system for water-saving wastewater treatment and reuse. 6.3.2 The wastewater discharged from each production unit shall be collected by the drainage system of the plant and transported to the integrated sewage treatment facility for treatment. 6.3.3 The raw material field wastewater is reused after precipitation treatment. 6.3.4 Sintering plant wastewater is recycled after being treated by precipitation or concentration. Figure 1 Sintering plant wastewater treatment process flow chart 6.3.5 The following treatment processes should be adopted for the waste water of the ironworks. a) Blast furnace gas washing wastewater should be recycled after using the process shown in Figure 2. Circulating water system forced drainage As a supplement to the blast furnace slag system. Figure 2 Flow chart of the treatment process of blast furnace gas washing wastewater Hydrating flocculant Gas washing wastewater flocculation sedimentation cooling circulating pool blast furnace slag hydration (The residual pressure power generation is not set) Supernatant Recycling or concentrating wastewater from sinter plant Sludge recovery Circulating pool b) The blast furnace slag wastewater should be recycled after using the process shown in Figure 3~6. Fig. 3 Flow chart of blast furnace slag wastewater treatment process--precipitation filtration method Figure 4 Flow chart of blast furnace slag wastewater treatment process--filtration method Fig. 5 Flow chart of blast furnace slag wastewater treatment process--drum filtration method Fig.6 Flow chart of blast furnace slag wastewater treatment process--drum dehydration method c) Cast iron machine ingot spray cooling wastewater should be recycled after the treatment process shown in Figure 7. Figure 7 Flow chart of the treatment process of spray cooling wastewater in cast iron machine 6.3.6 The following treatment processes should be adopted for steel mill wastewater. a) The converter flue gas wet purification dust removal wastewater should be recycled after using the process shown in Figure 8. Small amount of circulating water system The forced discharge of sewage can be used as blast furnace slag, steel slag treatment, cascade water for raw material field or discharge into integrated sewage treatment facilities. Force The sewage discharge SS≤100mg/L, and the water temperature≤35°C. Slag slag water mixture drum dewatering (belt slag) cooling circulation pool Hydration Slag slag water mixture drum filtration (belt slag) cooling Hydration Circulating pool Slag slag water mixture filtration (grab slag) cooling Hydration Circulating pool Cast iron machine sedimentation (grab clearing slag) Slag slag water mixture precipitation filtration......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 2019-2012_English be delivered?Answer: Upon your order, we will start to translate HJ 2019-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of HJ 2019-2012_English with my colleagues?Answer: Yes. The purchased PDF of HJ 2019-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |