Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GBZ32880.2-2016 English PDF

US$539.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ32880.2-2016: Economic evaluation of power quality -- Part 2: Economic evaluation method for the distribution network
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/Z 32880.2-2016539 Add to Cart 5 days Economic evaluation of power quality -- Part 2: Economic evaluation method for the distribution network Valid

Similar standards

GB/T 30137   GB/T 35727   GB/T 32882   GB/Z 32880.1   GB/T 32876   GB/T 32880.3   

Basic data

Standard ID: GB/Z 32880.2-2016 (GB/Z32880.2-2016)
Description (Translated English): Economic evaluation of power quality -- Part 2: Economic evaluation method for the distribution network
Sector / Industry: National Standard
Classification of Chinese Standard: K04
Word Count Estimation: 27,252
Date of Issue: 2016-12-13
Date of Implementation: 2017-07-01
Regulation (derived from): National Standard Notice No.127 of 2016
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

GBZ32880.2-2016: Economic evaluation of power quality -- Part 2: Economic evaluation method for the distribution network


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Economic evaluation of power quality - Part 2. Economic assessment of public distribution networks) ICS 29.020 K04 People's Republic of China national standardization of technical guidance documents Power Quality and Economic Evaluation Part 2. Economic evaluation of public distribution networks Part 2.Economicevaluationmethodforthedistributionnetwork 2016-12-13 released 2017-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ 1 Scope 1 2 Terms and definitions 1 3 Variable Description 3 4 public distribution network power quality and economic evaluation principles 6 5 public distribution network power quality economic costs 6 6 Economic Loss Assessment Methods 9 7 Power Quality Control Program Economic Evaluation Method 11 8 Evaluation Process 12 9 Evaluation indicator 14 Appendix A (Informative) Distribution Network Harmonic Economic Assessment 15 Appendix B (informative) device life model 19 Appendix C (informative) capital equivalent formula 22 References 23

Foreword

"Power Quality and Economic Evaluation" is divided into three parts. --- Part 1. Economic assessment of power users (GB /Z 32880.1); --- Part 2. Economic evaluation of public distribution networks (GB /Z 32880.2); --- Part 3. Methods of data collection (GB/T 32880.3). This section is the second part of "Power Quality and Economic Evaluation". This section drafted in accordance with GB/T 1.1-2009 given rules. Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents. This part is proposed and managed by the National Standardization Technical Committee of Voltage and Current Ratings and Frequency (SAC/TC1). This part of the drafting unit. State Grid Jiangsu Electric Power Company Electric Power Research Institute, China Machine Productivity Promotion Center, North China Electric Power University, State Grid Shanxi Electric Power Company Electric Power Research Institute, Anhui University, China Electricity Council, the International Copper Association, State Grid Shanghai Electric Power Company Electric Power Research Institute, China Power Construction Group Guangdong Electric Power Design and Research Institute, State Grid Smart Grid Research Institute, Southeast University, State Grid Beijing City Power Company Electric Power Research Institute, NARI (Wuhan) Electrical Equipment and Engineering Energy Efficiency Assessment Center. The main drafters of this section. Yuan Xiaodong, Liu Dan, Zhang Ping, Tao Shun, Wang Jinhao, Liu Juncheng, Li Qun, Zhu Mingxing, Lu Chonghui, Huang Wei, Chen Zhigang, Zhou Zuochun, Zhou Shengjun, Gu Wei, Peng Xudong, Sun Hao. Power Quality and Economic Evaluation Part 2. Economic evaluation of public distribution networks

1 Scope

This part of the standard specification of public power distribution network power quality and economic evaluation methods, given the typical power quality problems caused by public distribution Network economic loss assessment methods and distribution network operators main power quality control program economic evaluation methods. This section applies to the public distribution network in the economic evaluation of power quality problems. Other power plants and other distribution network with reference to the implementation.

2 Terms and definitions

The following terms and definitions apply to this document. 2.1 Power quality powerquality; qualityofpowersystem Electrical characteristics of the power system at the designated point, relates to the power supply equipment for normal operation (or operation) of the voltage and current indicators of deviation from the base The degree of quasi-technical parameters. Note. The reference specifications generally refer to the value of the indicator under ideal power conditions. These parameters may relate to the compatibility between supply and load. [GB/T 32507-2016, Definition 2.1.1] 2.2 Voltage Sag voltageag (voltagedig) The root mean square value of power frequency voltage suddenly drops to 0.1pu ~ 0.9pu in power system, and after 10ms ~ 1min Return to normal phenomenon. Note. The IEC standard is reduced to the range of 0.01pu ~ 0.9pu. [GB/T 30137-2013, Definition 3.1] 2.3 Shortinterruption of short interruptions The root mean square value of power frequency voltage at a certain point in the power system suddenly drops below 0.1pu and resumes after a brief period of 10ms ~ 1min normal phenomenon. [GB/T 30137-2013, Definition 3.2] 2.4 Harmonic (component) harmoniccomponent The non-sinusoidal periodic Fourier series decomposition, the frequency of the fundamental frequency is an integer multiple of the sine component. [GB/T 32507-2016, Definition 2.6.7] 2.5 Interharmonic component The periodic exchange of Fourier series decomposition, the frequency is not equal to an integral multiple of the fundamental component. [GB/T 24337-1993, Definition 3.6] 2.6 Voltage fluctuation voltagefluctuation Voltage rms (rms) A series of changes or continuous changes. [GB/T 12326-2008, Definition 3.3]
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ32880.2-2016_English be delivered?

Answer: Upon your order, we will start to translate GBZ32880.2-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ32880.2-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ32880.2-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.