GBZ32519.3-2016 English PDFUS$699.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ32519.3-2016: 1 000 MW class hydraulic -- Generator -- Part 3: Quality inspection stands for installation Status: Valid
Basic dataStandard ID: GB/Z 32519.3-2016 (GB/Z32519.3-2016)Description (Translated English): 1 000 MW class hydraulic -- Generator -- Part 3: Quality inspection stands for installation Sector / Industry: National Standard Classification of Chinese Standard: K52 Classification of International Standard: 29.160.40 Word Count Estimation: 35,324 Date of Issue: 2016-02-24 Date of Implementation: 2016-09-01 Regulation (derived from): National Standard Announcement No. 5 of 2016 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China GBZ32519.3-2016: 1 000 MW class hydraulic -- Generator -- Part 3: Quality inspection stands for installation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. 1 000 MW class hydraulic - Generator - Part 3. Quality inspection stands for installation ICS 29.160.40 K52 People's Republic of China national standardization of technical guidance documents 1000MW water turbine generator Part 3. Installation quality inspection guidelines Part 3.Qualityinspectionstandsforinstalation Posted on.2015-02-24 2016-09-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 1 5 General Provisions 1 6 turbine installation test content 1 7 generator installation test content 10 ForewordThis instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document is proposed by China Electrical Equipment Industry Association. This guidance document is organized by the National Large Scale Generator Standardization Technical Committee (SAC/TC511). The drafting of this technical guidance document. China Three Gorges Corporation, China Power Construction Co., Ltd., China's water conservancy and hydropower Fourth Engineering Bureau Co., Ltd. Mechanical and Electrical Installation Branch, Harbin Electric Machinery Co., Ltd., Dongfang Electric Group Dongfang Electrical Machinery Co., Ltd. State Power Construction Group East China Survey and Design Institute Co., Ltd., the Yangtze River design company. The main drafters of the guidance of technical documents. Zhang Run, Fu Yuanchu, Ran Yi Chuan, Tu Yang Wen, Sun Dezhao, Shao Yongbin, with Liu Chang, Fu Changhong, Li Yuzhen, Wang Shuqing, Ma Wenhao.IntroductionSince the installation of the 700MW hydroelectric generating set of the Three Gorges Project in China, the installation of a domestic giant hydroelectric generating set has entered a Peak, Longtan, Xiaowan, Laxiwa, Xiluodu, Xiangjiaba power plant giant units have been put into operation, the installation of the giant unit of more attention to the quality of the total Results giant unit installation quality testing standards is imperative, the original GB GB/T 8564-2003 quality testing standards need to be improved, with After improving the quality inspection standards can also guide Baihetan, Wudongde and other follow-up giant unit installation. This guidance document is based on the summary of the domestic large hydro-generator sets (single-flow capacity of 700MW and above Francis turbine Motor unit) installed on the basis of quality standards prepared for the future stand-alone capacity 1000MW Francis turbine installation Quality testing provide a standard basis. 1000MW water turbine generator Part 3. Installation quality inspection guidelines1 ScopeThis Guidance Document sets forth the requirements for the installation, commissioning and testing of hydroelectric generating sets and their ancillary equipment. This guideline technique The document is applicable to the installation and acceptance guidance of 1000MW Francis turbine units with single capacity.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2900.25 Electrotechnical terminology rotary motor Hydropower plant hydraulic machinery and equipment GB/T 7894 hydroelectric generator basic technical conditions GB/T 8564 turbine generator installation technical specifications GB/T 11345 Weld non-destructive testing ultrasonic testing technology test grade and assessment GB/T 14541 operating turbine oil maintenance management guidance GB/T 20160 rotating motor insulation resistance test GB/T 20835 generator stator core magnetization test guidelines GB/T 50150 electrical installations installation of electrical equipment transfer test standards DL/T 330 Water conservancy and hydropower projects metal structures and equipment welded joints diffraction time difference method ultrasonic testing DL/T 1067 evaporative cooling hydro-generator (power generation/motor) basic technical conditions3 Terms and definitionsGB/T 20160, GB/T 2900.45 and GB/T 2900.25 defined terms and definitions apply to this document.4 General rulesGeneral requirements for the installation of 1000MW hydro-generator set specifications should be consistent with the relevant provisions of GB/T 8564.5 General provisionsGeneral requirements for the installation of 1000MW hydro-generator set specifications should be consistent with the relevant provisions of GB/T 8564.6 turbine installation test content6.1 Buried installation quality inspection Press "Buried installation quality inspection standards" (see Table 1 ~ Table 8) implementation. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ32519.3-2016_English be delivered?Answer: Upon your order, we will start to translate GBZ32519.3-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GBZ32519.3-2016_English with my colleagues?Answer: Yes. The purchased PDF of GBZ32519.3-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |