Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GBZ28805-2012 English PDF

US$1634.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ28805-2012: Intelligrid methodology for developing requirements for energy systems
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/Z 28805-20121634 Add to Cart 8 days Intelligrid methodology for developing requirements for energy systems Valid

Similar standards

GB/T 30137   GB/T 35727   GB/T 32882   GB/T 20236   GB/Z 44118.1   GB/T 16679.1   

Basic data

Standard ID: GB/Z 28805-2012 (GB/Z28805-2012)
Description (Translated English): Intelligrid methodology for developing requirements for energy systems
Sector / Industry: National Standard
Classification of Chinese Standard: K04
Classification of International Standard: 29.020
Word Count Estimation: 82,842
Adopted Standard: IECPAS 62559-2008, IDT
Regulation (derived from): National Standards Bulletin 2012 No. 28
Issuing agency(ies): Ministry of Health of the People's Republic of China
Summary: This standard specifies the user needs to describe and define a set of smart grid systems engineering approach. The technical guidance document for the development of the project to determine the user or system functional and performance requirements of t

GBZ28805-2012: Intelligrid methodology for developing requirements for energy systems

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Intelligrid methodology for developing requirements for energy systems ICS 29.020 K04 People's Republic of China national standardization of technical guidance documents Smart grid approach to energy system needs development (IEC /PAS62559.2008, IDT) Posted on.2012-11-05 2013-05-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Overview 1 1.1 Scope 1 1.2 Method Overview 1 1.3 Objectives of this guidance document 1.4 The application of the guidance of technical documents 5 2 Reference 5 3 Abbreviations 5 4 Terms and definitions 7 5 Smart Grid Architecture Introduction 8 5.1 Background and source by 8 5.2 Basic Concepts 8 5.3 pyramid structure 9 5.4 business needs and functional requirements 10 5.5 Development Phase 10 5.6 Parallel Development Stream 11 5.7 Scope of this Guidance Technical Document 12 The first phase. The responsible person identifies the business needs and develops the project plan 6.1 Determine business and dominant rules 13 6.2 Select Item 13 6.3 Identify candidate technologies 13 6.4 Define high-level business use cases 13 6.5 Adjust the process according to the organization settings 13 6.6 Clear Stakeholders 13 6.7 to establish a project team 14 6.8 Select Project Team 14 Stage 2 Stakeholders Determine User Needs Based on Use Cases 14 7.1 Use Case Methodology 14 7.2 Use Case Development Workshop Requirements 16 7.3 Use Case Analysis 19 The third to the fifth phase of technology selection and deployment of 22 8.1 Architecture Design 22 8.2 Selection Techniques 25 Appendix A (informative) How to develop use cases 28 Appendix B (Informative) Smart Grid Use Case Template 45 Appendix C (Informative) Power System Synchronization Phasor Use Case 49 Appendix D (Informative) Examples of User Use Cases

Foreword

This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document uses the translation method equivalent to the smart grid using IEC /PAS62559.2008 "Energy System Requirements Development method". The following editorial changes have been made to this technical document. Replace "thisPubliclyAvailableSpecification" or "PAS" in the original text with "this Guidance Document"; Chapter 3, "Abbreviations," adds the explanations of some abbreviations appearing in this guidance document to facilitate the guidance of this guideline User of the file Chapter 4 "Terms and Definitions" adds the terms appearing in this technical document to guide the use. Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents. This Guidance Document is proposed and managed by the National Technical Committee for Voltage and Current Leveling and Frequency Standardization (SAC/TC1). The main drafting of the technical guidance of this document. China Electric Power Research Institute, China Machine Productivity Promotion Center, Hebei Electric Power Research Institute, Wuhan National Measurement Technology Co., Ltd., Shanxi Electric Power Company Electric Power Research Institute, Xi'an Boyu Electric Co., Ltd., Rongxin Power Electronics Co., Ltd., State Power Nanjing Automation Co., Ltd., State Grid Electric Power Research Institute, Anhui University, Ministry of Education Power Quality Engineering Research Research Center. The guidance of technical documents to participate in the drafting unit. International Copper Association, China Railway Fourth Survey and Design Group Co., Ltd., Shenzhen City, Technology Co., Ltd. The main drafters of this technical paper, Bai Xiaomin, Zhang Ping, Duan Xiaobo, He Jiang, Bu Zhengliang, Liu Juncheng, Zhang Fanyong, Wang Youlong, Wang Jinhao, Li Shusen, Li Lingdong, Gao Jun. This introductory technical document was drafted by drafters. Smart grid approach to energy system needs development

1 Overview

1.1 Scope This Guidance Document specifies a set of smart grid system engineering methods that describe and define user requirements. This guideline applies to the process of determining user functionality and performance requirements in project or system development. This Guidance Document (PAS) is based on the business needs of a utility company, and is an expert in the power system field in an automation system Identify and describe a set of methods for user needs development. This approach was originally developed by the United States Electric Power Research Institute (EPRI) as a smart grid system Research and development part of the structure, is to achieve future automatic, self-healing and efficient power system. This chapter describes the scope, purpose and objectives of this guidance document and the basic system on which it is based. 1.2 Method Overview 1.2.1 The concept of systems engineering Smart grid methodology is a branch of systems engineering. Systems Engineering Methodology Separation of "User Requirements" from "Technical Specifications" User requirements only determine what is needed, but do not refer to any particular design or technology, and technical specifications determine how "how" is implemented Motion control system to meet user needs. 1.2.2 Smart Grid Methodology The overall framework of smart grid methodology is shown in Figure 1 and consists mainly of the following personnel and project steps. The person in charge of business examines and approves the project according to the necessity and needs of the project. Field experts and project engineers to form a project team As the team's first task, should identify the project may be affected or subject to All power system specialists and other stakeholders (users) affected by the project, who or their representatives should (full-time, part-time or as far as possible) participate Project Team. Field experts review the concepts and applicability of existing smart grid use cases, which can be found on the Internet at. http.//inteligrid.info/inteligridArchitecture/ues_cases/IEC SA_use_cases_overview.htm Domain experts develop a list of use cases (functional descriptions) that considers not only the needs of a particular business, but also the needs of other users, And the likelihood that the project will affect or be affected in the future. Domain experts drafted key use cases with the help of project engineers who understand the use-case process, including all necessary user needs. Domain experts review and update these use cases to ensure that users' needs are properly understood, avoiding possible misunderstandings, Complex, missing and contradictory. The project engineer evaluates and adjusts these use cases to create a comprehensive and detailed document that contains only the user's needs. According to user requirements documents, information professionals decide which appropriate standards and techniques to use in determining key criteria and techniques should be Preparation of smart grid system strategic vision. Design engineers to develop technical specifications to user needs, information experts to determine the strategic standards and technologies and smart grid system development The combination of technical means. The details that are eventually described in the user requirements document are included. Function. refers to the function from the user's point of view, including the function description of the process, user options, the type of input data, the type of result As well as the possible appearance of the interface;
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ28805-2012_English be delivered?

Answer: Upon your order, we will start to translate GBZ28805-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ28805-2012_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ28805-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.