GB/T 45278.1-2025 English PDFUS$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 45278.1-2025: Information technology - Time aware network - Part 1: Protocol Status: Valid
Basic dataStandard ID: GB/T 45278.1-2025 (GB/T45278.1-2025)Description (Translated English): Information technology - Time aware network - Part 1: Protocol Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: L78 Classification of International Standard: 35.110 Word Count Estimation: 26,266 Date of Issue: 2025-02-28 Date of Implementation: 2025-09-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 45278.1-2025: Information technology - Time aware network - Part 1: Protocol---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.GB/T 45278.1-2025 English version. Information technology - Time aware network - Part 1.Protocol ICS 35.110 CCSL78 National Standard of the People's Republic of China Information Technology Time Clear Network Part 1.Protocol Released on 2025-02-28 2025-09-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 TAN Protocol Overview 2 5.1 The position of TAN protocol corresponding to OSI reference model 2 5.2 TAN physical layer 3 5.3 TAN Control Layer 3 5.4 MAC layer of TAN 3 5.5 Interaction between TAN control layer and MAC layer 3 6 TAN control layer data frame structure 3 6.1 TAN frame structure 3 6.2 Components of TAN frame 4 7 TAN control layer clock synchronization and transmission control with definable delay 8 7.1 TAN clock synchronization and time tag processing flow 8 7.2 Clock Synchronization 9 7.3 Transmission Control with Definable Delay 9 8 TAN control layer data exchange and transmission 10 8.1 Relationship between TAN control layer, MAC layer and physical interface of TAN switching equipment 10 8.2 TAN data exchange process 10 8.3 Data exchange and path selection 11 8.4 Preempting Transmission 15 Appendix A (Informative) Time-explicit Network and Wireless Network Interconnection Scenarios 19 A.1 System architecture based on 5G network TAN protocol transmission 19 A.2 System architecture based on WLAN network TAN protocol transmission 19 A.3 TAN-W frame 19 A.4 Multipath Transmission in Wireless Networks 20ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is part 1 of GB/T 45278 "Information Technology Time-Explicit Network". GB/T 45278 has been published as follows part. --- Part 1.Protocol. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Information Technology Standardization Technical Committee (SAC/TC28). This document was drafted by. Beijing Enyitong Technology Development Co., Ltd., China Electronics Technology Standardization Institute, Shenzhen CESI Information Technology Co., Ltd., China Mobile Communications Corporation Research Institute, China Electronics Technology Standardization Institute East China Branch, Yanshan University, University of Electronic Science and Technology of China Jiangsu Zhongtian Technology Co., Ltd., Wuxi Internet of Things Industry Research Institute, Shanghai Tianchen Micro-Nano Technology Co., Ltd., China United Network Communications Co., Ltd. Research Institute, Chongqing Industrial Big Data Innovation Center Co., Ltd., Jingfeng Technology (Shenzhen) Co., Ltd., Guangdong Power Grid Foshan Power Supply Bureau Limited Liability Company. The main drafters of this document are. Wang Shuaibing, Wang Ting, Yang Hong, Chen Qiang, Zhuo Lan, Guo Xiong, Qu Wenming, Su Jingru, Zhang Chi, Cai Tingxiao, Wei Anni, Fu Genli, An Gang, Yang Bohan, Wu Haijiang, Ge Yongxin, Li Xiaoyu, Yuan Yazhou, Xie Shuhong, Wu Mingjuan, Ma Kai, Liu Lanhui, Ren Junmin, Deng Fei, Zhou Lixiong, Wei Ziyuan, and Chen Jinrong.IntroductionGB/T 45278 "Information Technology Time-Explicit Network" is a basic standard in the field of Ethernet network applications. The relevant criteria for establishing a MAC layer switching network with strict time requirements and data fault-tolerant transmission capabilities are proposed to consist of the following parts. --- Part 1.Protocol. The purpose is to specify the protocol specifications for time-explicit networks. Clock synchronization and the definition of time-delay transmission, data exchange and transmission can be defined, so that users can understand the time-clear network coordination The main mechanisms and methods of the meeting. --- Part 2.Technical requirements and test methods for switching equipment. The purpose is to clarify the technical requirements for network switching equipment within a specified time. and testing methods. Part 1 is a protocol specification for time-explicit networks, which defines the frame structure of the time-explicit network protocol, as well as clock synchronization and The workflow and mechanism of the main capabilities such as data time tag processing, data exchange and transmission. Part 2 is the implementation of time-explicit network Unified technical requirements and test methods for switching equipment, providing technical specifications and design specifications for the interconnection and interoperability of switching equipment. Information Technology Time Clear Network Part 1.Protocol1 ScopeThis document specifies the structure of the Time Explicit Network (TAN) control layer data frame, TAN control layer clock synchronization and transmission with definable delays. Transmission control, TAN control layer data exchange and transmission, etc. This document is applicable to the development and application of MAC layer switching equipment with strict time requirements and data fault-tolerant transmission capabilities.2 Normative referencesThe contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 9387.1-1998 Information technology Open Systems Interconnection Basic Reference Model Part 1.Basic Model GB/T 15629.3-2014 Specific requirements for local area networks and metropolitan area networks for telecommunications and information exchange between information technology systems Part 3.Access method and physical layer specifications for Carrier Sense Multiple Access with Collision Detection (CSMA/CD) GB/T 25931-2010 Precision clock synchronization protocol for network measurement and control systems3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 timeawarenetwork A network based on Ethernet and clock synchronization that time-stamps and schedules data and transmits it in a fault-tolerant manner. 3.2 TAN switch equipmentTANswitch Equipment capable of exchanging TAN frames. 3.3 TAN fieldTAN field A network domain consisting entirely of time TAN switching equipment. 3.4 Data terminal equipmentdataterminalequipment Any data source device or data destination device connected to the TAN. 3.5 Accumulateddelay The sum of the time taken by all TAN switching devices through which the TAN clock synchronization frame has passed. 3.6 Network access time networkaccesstime The moment when the TAN switching device receives data on the Ethernet interface. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 45278.1-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 45278.1-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 45278.1-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 45278.1-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |