GB/T 43991-2024 English PDFUS$599.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 43991-2024: Service specifications for operation and maintenance of urban tunnel Status: Valid
Basic dataStandard ID: GB/T 43991-2024 (GB/T43991-2024)Description (Translated English): Service specifications for operation and maintenance of urban tunnel Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: P21 Classification of International Standard: 93.060 Word Count Estimation: 30,343 Date of Issue: 2024-04-25 Date of Implementation: 2024-11-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 43991-2024: Service specifications for operation and maintenance of urban tunnel---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS 93:060 CCSP21 National Standards of People's Republic of China Urban tunnel operation and maintenance service specifications Released on 2024-04-25 2024-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General Requirements 2 4:1 Efficient Operation 2 4:2 Safe and reliable 2 4:3 Green and Low Carbon 2 4:4 Continuous Improvement 2 4:5 Digital Operation and Maintenance 2 5 Service Content 3 5:1 Tunnel takeover 3 5:2 Maintenance and management 3 5:3 Operational Services 3 5:4 Health Monitoring 3 5:5 Data Management 3 5:6 Life cycle assessment 4 6 Service Requirements 4 6:1 Maintenance requirements 4 6:2 Operational Requirements 6 7 Service Guarantee 9 7:1 Operation and maintenance service provider 9 7:2 Personnel Management 9 7:3 Material Management 10 7:4 Emergency Management10 7:5 File Management 10 8 Inspection and testing 10 8:1 Check 10 8:2 Detection 11 9 Evaluation and Improvement12 9:1 Service Quality Evaluation 12 9:2 Service Quality Improvement 13 Appendix A (Normative) Calculation Method of Pavement Intactness Rate 14 Appendix B (Normative) Equipment availability calculation method 16 Appendix C (Normative) Urban Tunnel Brightness Detection and Calculation Method 17 Appendix D (Informative) Example of urban tunnel structure inspection record 19 Appendix E (Informative) Example of Urban Tunnel Environmental Testing Record Table 21 Reference 23ForewordThis document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting: Please note that some of the contents of this document may involve patents: The issuing organization of this document does not assume the responsibility for identifying patents: This document was proposed and coordinated by the National Technical Committee for Standardization of Urban Public Facilities Services (SAC/TC537): This document was drafted by: Donglai Smart Transportation Technology (Shenzhen) Co:, Ltd:, Shenzhen Utop Technology Co:, Ltd:, Xiamen Leading the Future Technology Co:, Ltd:, Beijing Institute of Standardization, Chongqing Jiaotong University, Shanghai Urban Construction Urban Operations (Group) Co:, Ltd:, China Railway Engineering Equipment Group Co:, Ltd:, Shenzhen Urban Public Security Technology Research Institute Co:, Ltd:, Beijing Municipal Engineering Design and Research Institute Co:, Ltd:, Chongqing Transportation Research and Design Institute Co:, Ltd:, Shanghai Academy of Building Sciences Co:, Ltd:, China Railway Sixth Survey and Design Institute Group Co:, Ltd: Shanghai Municipal Engineering Design and Research Institute (Group) Co:, Ltd:, Chongqing Chengtou Road and Bridge Management Co:, Ltd:, Zhejiang Erjian Construction Group Co:, Ltd:, Inner Mongolia Xianhong Technology Co:, Ltd:, Zhongdao Jiye Maintenance Technology Co:, Ltd:, East China Jiaotong University, Fuzhou City Planning and Design Research Institute Group Co:, Ltd:, Shenzhen Yuetong Construction Engineering Co:, Ltd:, Wuhan Yangtze River Tunnel Construction Co:, Ltd:, CCCC First Navigation Engineering China Railway Survey and Design Institute Co:, Ltd:, China Railway Sixth Bureau Group Co:, Ltd:, China Railway 11th Bureau Group Co:, Ltd:, China Railway 15th Bureau Group Co:, Ltd:, China Railway 19th Bureau Group Co:, Ltd:, China Railway 20th Bureau Group Co:, Ltd:, China Railway First Bureau Group Urban Rail Transit Engineering Co:, Ltd:, China Railway Second Bureau Group China Railway Group Electric Engineering Co:, Ltd:, China Railway 14th Bureau Group Electrification Engineering Co:, Ltd:, China Railway 16th Bureau Group Railway Transportation Engineering Co:, Ltd:, China Railway Construction Bridge Engineering Bureau Group Fourth Engineering Co:, Ltd:, China Railway Beijing Engineering Bureau Group Urban Rail Transit Engineering Co:, Ltd:, China Railway Bridge and Tunnel Technology Co:, Ltd:, China Communications Construction Tunnel Engineering Bureau Co:, Ltd: The main drafters of this document are: Wang Xiaohui, Nie Huaidong, Lan Yujing, Luan Lin, Huang Zhiwei, Liu Xuetao, Tian Chuan, Lin Zhi, Dai Zhenyu, Jia Lianhui, Shi Zhongqi, Du Chuanjin, Ding Hao, Zhao Rongxin, Fan Jianguo, You Kesi, Li Zheng, He Guokang, Huang Zhiyong, Chen Yuxiao, Chen Huapeng, Lin Gongbo, Zou Aihua, Huang Yucheng, Zhao Faxiang, Fu Xiaofeng, Jiang Sheng, Tang Junhong, Guan Zhenxiang, Liu Xiaoyong, Wu Shengtao, Sun Sisong, Yang Hongjian, Peng Xianyin, Zhao Jian, Li Peilong, Fu Yixiao, Zhao Jun, Huang Yongheng, Su Quanke, Guo Zhongyin, Teng Li, Zhang Liyuan, Yao Xiaoli, Wei Xiaolong, Wu Huayong, Fan Hong, Guo Qing, Liu Qiuzhuo, Cai Pengcheng, Chen Wei, Xu Yajun, Zhang Wenming, Liu Shaohua, Shen Lei, Cao Ruqing, An Luming, Liu Guixiang, Chen Bin, Su Donghua, Luo Wanchun, Liu Tao, Ma Jinyong and Xu Pai:IntroductionWith the acceleration of industrialization, urbanization and modernization, various urban Urban tunnels and underground structures are increasing rapidly in cities across my country: Urban tunnels are a complex system that integrates multiple disciplines: The project has the characteristics of large project investment, complex technology, multiple operating facilities and wide coverage: There are a lot of people and a lot of vehicles passing through every day, and there may even be congestion during rush hour, which poses a hidden danger to the safety of urban tunnels: Once an accident occurs and causes traffic jam, the impact on urban traffic will be "thrombotic", which may cause heavy casualties and disasters: In particular, traffic congestion in large cities has seriously restricted our The rapid growth of China's urban economy: Whether urban tunnels are safe to operate is a matter of great concern to people's property and social stability: The operation and maintenance services of urban tunnels are of vital importance: This document helps operation and maintenance service providers build smart, safe, efficient and green The urban tunnel operation and maintenance service model solves the current problems of low systematization, single management method and lack of information sharing in urban tunnel operation and maintenance services: To ensure the safety and performance of urban tunnels, extend the service life of urban tunnels, and improve the quality and level of operation and maintenance services of urban tunnels: the goal of: Urban tunnel operation and maintenance service specifications1 ScopeThis document specifies the overall requirements, service content, service requirements, service guarantees, inspection and testing, evaluation and Improve: This document applies to operation and maintenance services provided by operation and maintenance service providers for newly built, rebuilt, and expanded urban tunnels: The operation and maintenance services of other tunnels can be used for reference:2 Normative referencesThe contents of the following documents constitute the essential clauses of this document through normative references in this document: For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document: GB/T 19580 Criteria for Performance Excellence Evaluation GB/T 29639 Guidelines for the preparation of emergency plans for production safety accidents in production and operation units JTG/T D70/2-01-2014 Highway Tunnel Lighting Design Specifications JTGH12-2015 Technical Specifications for Highway Tunnel Maintenance3 Terms and definitionsThe following terms and definitions apply to this document: 3:1 Urban Tunnel A tunnel within the city that is equipped with certain technical conditions and facilities for vehicles and pedestrians to pass through: 3:2 Routine inspection Inspect the appearance and working condition of the civil structures and electromechanical equipment of urban tunnels within a short period of time (generally less than 1 week): Check the activities: 3:3 Regular inspections Check the technical performance of the civil structures and electromechanical equipment of urban tunnels at a certain time period (monthly, quarterly, annually) Activity: 3:4 The process of managing and maintaining urban tunnels: Note: Operation and maintenance services include inspection, repair and maintenance of tunnel structure, equipment, lighting, ventilation, drainage and other aspects: The traffic flow, vehicle volume, weather and other external factors in the tunnel are monitored and managed to ensure the safety and smooth flow of the tunnel: 3:5 An internal or external service organization that provides operation and maintenance services: ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 43991-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 43991-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 43991-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 43991-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |