Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 42347-2023 English PDF

US$439.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 42347-2023: General technical requirement and test method for mechanical pre-cooling equipment
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 42347-2023439 Add to Cart 4 days General technical requirement and test method for mechanical pre-cooling equipment Valid

Similar standards

GB/T 25861   GB/T 41660   GB/T 40939   GB/T 45334   GB/T 22068   

Basic data

Standard ID: GB/T 42347-2023 (GB/T42347-2023)
Description (Translated English): General technical requirement and test method for mechanical pre-cooling equipment
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: J73
Classification of International Standard: 27.200
Word Count Estimation: 22,255
Date of Issue: 2023-03-17
Date of Implementation: 2023-10-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 42347-2023: General technical requirement and test method for mechanical pre-cooling equipment


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27.200 CCSJ73 National Standards of People's Republic of China General technical requirements and test methods for mechanical pre-cooling equipment pre-cooling equipment Released on 2023-03-17 2023-10-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee

table of contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Type, model and conditions of use 2 5 Technical requirements 3 6 Test method 6 Appendix A (Normative) Cold air type pre-cooling equipment full-load cooling test package and its loading requirements 14

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules for Standardization Documents" drafting. Please note that some contents of this document may refer to patents. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Refrigeration and Air Conditioning Equipment Standardization Technical Committee (SAC/TC238). This document is drafted by. Hefei General Machinery Research Institute Co., Ltd., Panasonic Refrigeration System (Dalian) Co., Ltd., Anhui Melco Refrigeration Air Conditioning Equipment Co., Ltd., Ice Wheel Environmental Technology Co., Ltd., China National Institute of Standardization, Hefei General Mechanical and Electrical Products Testing Institute Co., Ltd. Division, Tianjin University of Commerce, Qingdao Hairong Commercial Cold Chain Co., Ltd., Hefei General Environmental Control Technology Co., Ltd. The main drafters of this document. Zhang Xiuping, Wu Junfeng, Ma Jinping, Wu Zhengmao, Wang Tiejun, Zhang Huiming, Yun Zhenyu, Xia Linfeng, Shen Jiang, Song Hongjie, Li Yayun, Zhou Dan, Zhou Zhou, Niu Xiaowen, Ge Tan, Hu Yiqing, Qu Boyi, Li Tongbiao, Gu Chengxi. General technical requirements and test methods for mechanical pre-cooling equipment

1 Scope

This document specifies the types, models, service conditions, technical requirements and test methods of mechanical pre-cooling equipment (hereinafter referred to as "pre-cooling equipment") law etc. This document is applicable to cold air pre-cooling and vacuum pre-cooling machines for post-harvest pre-cooling of fresh agricultural products such as fruits, vegetables, flowers, and edible fungi. Mechanical pre-cooling equipment, cold (ice) water pre-cooling mechanical pre-cooling equipment can be implemented by reference. This document does not apply to the pre-cooling room in the cold storage that is cooled by the mechanical refrigeration system, but the pre-cooling unit independently provides an environment for a certain pre-cooling room. Except for the pre-cooling system of environmental conditions.

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 2934 Main dimensions and tolerances of intermodal flat pallets GB/T 5226.1 Safety of machinery and electrical machinery and electrical equipment - Part 1.General technical requirements GB/T 9237 Refrigeration system and heat pump safety and environmental requirements GB 16798 Food Machinery Safety and Hygiene GB/T 22360 Vacuum Pump Safety Requirements JB/T 4330 Determination of Noise of Refrigeration and Air Conditioning Equipment JB/T 7249 Terminology for Refrigeration and Air Conditioning Equipment

3 Terms and Definitions

The following terms and definitions defined in JB/T 7249 apply to this document. 3.1 Pre-cooling pre-cooling After the agricultural products are harvested and before long-distance transportation, sales or storage, the heat in the field is quickly removed through necessary devices or facilities, so that it can be reduced as soon as possible. to a suitable temperature range for operation. 3.2 Mechanical pre-cooling equipment mechanical pre-cooling equipment Using cooling methods such as cold air cooling, cold (ice) water cooling or vacuum cooling, the object to be cooled can be rapidly reduced from the initial temperature to the required final temperature. It is a mechanical device to realize the pre-cooling of the object to be cooled. Note 1.Mechanical pre-cooling equipment generally consists of a pre-cooling unit and a pre-cooling box. Note 2.Cold air cooling refers to the cooling method that cools the object by exchanging heat between the cold air and the object to be cooled; cold (ice) water cooling refers to the method of cooling the object by cold (ice) water The cooling method in which the object is cooled by exchanging heat; vacuum cooling refers to the method of cooling the object by evaporating part of the water in the vacuum state. cooling method.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 42347-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 42347-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 42347-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 42347-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.