GB/T 41090-2021 English PDFUS$479.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41090-2021: General design requirements of pressurized water reactor nuclear power plants with active safety systems Status: Valid
Basic dataStandard ID: GB/T 41090-2021 (GB/T41090-2021)Description (Translated English): General design requirements of pressurized water reactor nuclear power plants with active safety systems Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F65 Word Count Estimation: 25,214 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 41090-2021: General design requirements of pressurized water reactor nuclear power plants with active safety systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. General design requirements of pressurized water reactor nuclear power plants with active safety systems ICS 27:120:20 CCSF65 National Standards of People's Republic of China General design requirements for PWR nuclear power plants with active safety systems Published on 2021-12-31 2022-07-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Nuclear Power Plant Design Objective 3 5 General design requirements for nuclear power plants4 6 General design requirements for professional fields10 Reference 21 forewordThis document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" drafted: Please note that some content of this document may be patented: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed and managed by the National Nuclear Energy Standardization Technical Committee (SAC/TC58): This document is drafted by: China Nuclear Power Engineering Co:, Ltd: The main drafters of this document: Xing Ji, Yuan Xia, Fan Li, Zhang Xueshuang, Li Hui, Li Chong: General design requirements for PWR nuclear power plants with active safety systems1 ScopeThis document specifies the basic requirements for the overall design of an active safety system pressurized water reactor nuclear power plant (hereinafter referred to as "nuclear power plant") to ensure that it can be to operate safely and reliably: This document is applicable to newly-built pressurized water reactor nuclear power plants with active safety systems:2 Normative referencesThe contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document: GB 6249 Nuclear Power Plant Environmental Radiation Protection Regulations GB 11806 Regulations for Safe Transport of Radioactive Materials GB 18871 Basic standard for ionizing radiation protection and radiation source safety NB/T:20035 Classification of working conditions of pressurized water reactor nuclear power plants HAD002/01-2019 Emergency Preparedness and Emergency Response of Operating Organizations of Nuclear Power Plants HAF102 Nuclear power plant design safety regulations3 Terms and DefinitionsThe following terms and definitions apply to this document: 3:1 safety system safetysystem Systems important to safety to ensure safe shutdown of the reactor, to remove residual heat from the core or to limit anticipated operational and design basis events the consequences of this: [Source: HAF102-2016, Glossary Explanation] 3:2 activesafetysystem Active systems used to ensure safe shutdown of the reactor, to remove residual heat from the core, or to limit the consequences of anticipated operational events and design basis accidents: [Source: GB/T 35730-2017, 3:3, with modifications] 3:3 Active Safety Systems Pressurized Water Reactor Nuclear Power Plantspressurizedwaterreactornuclearpowerplantswithactivesafetysystems Pressurized water reactor nuclear power plants that mainly rely on the active safety system to complete all safety functions in the design basis accident: Note: referred to as "energy nuclear power plant": [Source: GB/T 35730-2017, 3:4, with modifications] 3:4 safetyfunction To ensure that a facility or activity can prevent and mitigate the radiological consequences of normal operation of a nuclear power plant, anticipated operational transients and accident conditions, ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41090-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 41090-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 41090-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41090-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |