Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 41066.3-2022 English PDF

US$429.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 41066.3-2022: Petroleum drilling and production equipment - Offshore semisubmersible drilling unit - Part 3: Operations and surveys
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 41066.3-2022429 Add to Cart 4 days Petroleum drilling and production equipment - Offshore semisubmersible drilling unit - Part 3: Operations and surveys Valid

Similar standards

GB/T 23258   SY/T 5164   GB 50341   GB/T 23506   GB/T 45134   GB/T 41066.2   

Basic data

Standard ID: GB/T 41066.3-2022 (GB/T41066.3-2022)
Description (Translated English): Petroleum drilling and production equipment - Offshore semisubmersible drilling unit - Part 3: Operations and surveys
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: E92
Classification of International Standard: 75.180.10
Word Count Estimation: 22,278
Date of Issue: 2022-12-30
Date of Implementation: 2023-07-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 41066.3-2022: Petroleum drilling and production equipment - Offshore semisubmersible drilling unit - Part 3: Operations and surveys


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 75.180.10 CCSE92 National Standards of People's Republic of China Oil and gas drilling equipment Offshore oil semi-submersible Drilling platform part 3.operation and inspection Posted on 2022-12-30 2023-07-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee

table of contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 1 5 operation 2 5.1 General requirements 2 5.2 Migration job 2 5.3 Positioning system operation 5 5.4 Drilling system operation 5 5.5 Anti-tropical cyclone 8 5.6 Anti-internal wave flow 9 5.7 Antifreeze and anti-icing 9 6 test 10 6.1 Inspection classification 10 6.2 Preparation before inspection 10 6.3 Statutory inspection 10 6.4 Class survey 12 6.5 Special inspection 13 Appendix A (Normative) Documents Required for Platform Operation 15 Appendix B (Informative) Safety reserve time calculation table 16

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules for Standardization Documents" drafting. This document is part 3 of GB/T 41066 "Offshore Oil Semi-submersible Drilling Platforms for Oil and Gas Drilling Equipment". GB/T 41066 has issued the following parts. --- Part 1.Functional configuration and design; --- Part 2.Construction, installation and commissioning acceptance; --- Part 3.Operation and inspection. Please note that some contents of this document may refer to patents. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed and managed by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96). This document is drafted by. China Oilfield Services Co., Ltd., China Classification Society, Sinopec Offshore Oil Engineering Co., Ltd., Baojishi Petroleum Machinery Co., Ltd., Petroleum Industry Well Control Device Quality Supervision and Inspection Center, Youlian Shipyard (Shekou) Co., Ltd. The main drafters of this document. Liu Zhiliang, Xian Minyuan, Jin Xueyi, Song Linsong, Liu Jingyuan, Peng Zhihui, Huang Yuquan, Niu Maomeng, Zhong Ying, Liu Yuan, Li Chun, Wang Qing, Zhang Jianzhou, Jiang Aiguo, Song Qilong, Zhang Benwei, Wang Anyi, Xu Fangxiong, Gao Chang, Liao Jiang, Liu Zhexu.

Introduction

Semi-submersible drilling platform is the mainstream deepwater drilling equipment in the world. In recent years, my country has made great progress in the R&D and manufacturing of offshore drilling equipment. Great progress has been made, and the independent design and construction of large-scale medium and deep water oil and gas equipment has been basically realized, and an echelon series has been formed in terms of equipment scale. to ensure that Offshore drilling equipment has developed in an orderly and healthy manner. Offshore oil fixed platform module drilling rigs, offshore oil jack-up drilling platforms, and offshore rock drilling rigs have been established. Oil semi-submersible drilling platform as the main line of the standard system. In this standard system, "offshore oil semi-submersible drilling platform" focuses on the It is planned to establish a quality control technology system covering the entire life cycle of the platform to provide technical support for the high-quality development of offshore oil and gas resources. GB/T 41066 "Oil and Natural Gas Drilling Equipment for Offshore Oil Semi-submersible Drilling Platforms" consists of three parts. --- Part 1.Functional configuration and design. The purpose is to standardize the overall configuration, equipment selection and design of semi-submersible drilling platforms. --- Part 2.Construction, installation and commissioning acceptance. The purpose is to standardize the semi-submersible drilling platform construction and equipment installation, commissioning methods, Acceptance criteria. --- Part 3.Operation and inspection. The purpose is to standardize the certification, operation and inspection requirements of semi-submersible drilling platforms after they are put into operation. This document provides technical basis for platform operation and operation inspection, so that it has good safety operation guidelines and operation inspection methods. Oil and gas drilling equipment Offshore oil semi-submersible Drilling platform part 3.operation and inspection

1 Scope

This document specifies the operation and inspection requirements for offshore oil semi-submersible drilling platforms after delivery. This document applies to the operation and inspection of offshore oil semi-submersible drilling platforms (hereinafter referred to as "platforms").

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 3836.16 Explosive atmospheres Part 16.Inspection and maintenance of electrical installations GB/T 19832 Inspection, maintenance, repair and remanufacturing of drilling and production lifting equipment for oil and gas industry GB/T 25444.3 Mobile and fixed offshore installations electrical installations Part 3.Equipment GB/T 30217.2 Drilling and oil production equipment for oil and gas industry - Part 2.Analysis method and operation of deep water drilling riser work and integrity SY/T 6270 Use and maintenance of cementing and fracturing manifolds for oil and gas drilling and production equipment SY/T 6564 Safety Code for Offshore Petroleum Operation System SY/T 6632 Offshore Oil Safety Warning Signs SY/T 6666 Recommended practices for the selection and maintenance of steel wire ropes for the oil and gas industry SY/T 6667 Shunt system equipment and operation recommended practice SY/T 6671 Classification recommended practice for Class I Zone 0, Zone 1 and Zone 2 of electrical equipment sites for petroleum facilities SY/T 6868 Blowout prevention equipment system for drilling operations SY/T 6962 Configuration and Installation Requirements for Offshore Drilling Equipment Well Control System SY/T 10025 Pre-operation Inspection Specifications for Offshore Drilling Units SY/T 10035 Drilling platform towing and positioning operation specification

3 Terms and Definitions

This document does not have terms and definitions that need to be defined.

4 Abbreviations

The following abbreviations apply to this document. DP. Dynamic Positioning (DynamicPositioning)
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 41066.3-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 41066.3-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 41066.3-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 41066.3-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.