GB/T 40592-2021 English PDFUS$249.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40592-2021: Technical rules for automatic over-frequency generator tripping in electric power system Status: Valid
Basic dataStandard ID: GB/T 40592-2021 (GB/T40592-2021)Description (Translated English): Technical rules for automatic over-frequency generator tripping in electric power system Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F21 Word Count Estimation: 13,122 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 40592-2021: Technical rules for automatic over-frequency generator tripping in electric power system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical rules for automatic over-frequency generator tripping in electric power system ICS 29.020 CCSF21 National Standards of People's Republic of China Technical regulations for automatic high-frequency cut-off generator set in power system powersystem Released on 2021-10-11 2022-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee Table of contentsForeword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General requirements 1 5 Basic requirements for device configuration and setting 2 6 Principles of device configuration 2 7 Setting calculation 2 8 Coordinated configuration of high-frequency cutting machine, unit high-frequency protection, and steam turbine overspeed protection 3 Appendix A (informative) Allowable frequency abnormal operation capability of steam turbine generator set 4 Appendix B (informative) The theoretical derivation of the average frequency deviation of the single load model of the high-frequency cutting machine 5 Reference 9ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446). Drafting organizations of this document. State Grid Corporation of China National Electric Power Dispatching Control Center, China Electric Power Research Institute Co., Ltd., China Southern Power Grid Electric Power Dispatching Control Center, Central China Branch of State Grid Corporation, Northwest Branch of State Grid Corporation of China, State Grid Corporation of China Southwest Branch, State Grid Sichuan Electric Power Company, State Grid Chongqing Electric Power Company, State Grid Jilin Electric Power Co., Ltd., State Grid Liaoning Electric Power Co., Ltd. Company, State Grid Jiangsu Electric Power Co., Ltd., Yunnan Power Grid Co., Ltd., Guizhou Power Grid Co., Ltd. The main drafters of this document. Ma Shiying, Zhou Jian, Tang Xiaojun, He Fei, Wang Chao, Zhang Zhiqiang, Jin Yiding, Niu Shuanbao, Xie Yan, Zhang Jian, Hu Yang, Wang Shen, Zhang Zhi, Luo Xuzhi, Zhang Gang, Wei Ping, Wang Xin, Xu Guanghu, Xu Youping, Li Jian, Xu Xialing, Wang Biao, Zhang Tongzun, Liu Baisi, Huang Wei, Ma Qinfeng, Wang Chunhua, Liu Kai, Li Haifeng, Zhang Xin, Liu Yang, Shao Dejun, Ma Xiaowei, Chen Xiangyi, Li Yiqun, Tan Zhen, Li Xiaojun, Wang Qi, Liu Liping, Li Jing, Ji Ping, Huo Qidi, Shi Haobo. Technical regulations for automatic high-frequency cut-off generator set in power system1 ScopeThis document specifies the basic requirements, configuration principles, and setting calculations for the configuration and configuration of automatic high-frequency cut-off generator sets in the power system. And the principle of coordinated configuration with unit high frequency protection and steam turbine overspeed protection. This document is suitable for high-frequency control of large power grids and high-frequency control of isolated power grids that are disconnected from the main grid after an accident. Outgoing local power grid and Enterprise power grids with self-supplied power plants can be implemented by reference.2 Normative referencesThe content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB 38755 Safety and Stability Guidelines for Power Systems GB/T 38969 Technical Guidelines for Power System DL/T 1234 Technical Specification for Power System Security and Stability Calculation3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Over-speed protection control of turbine; OPC When the speed of the turbo-generator set exceeds the set value or reaches the specified limit A control that automatically opens the regulating valve after the rotation speed to maintain the unit running at the rated rotation speed. [Source. DL/T 1309-2013, 3.6, with modification] 3.2 Generator overfrequency protection When the frequency value of the generator set is higher than the set value, it will send out a warning signal or corresponding protection action according to the setting.4 General requirements4.1 The automatic high-frequency cut-off of the power system (hereinafter referred to as the high-frequency cut-off) measure belongs to the third line of defense for the stable operation of the power system. This is an emergency control measure taken to prevent the system frequency from rising sharply after a serious failure of the power grid. 4.2 When the power system has excessive active power, the transient frequency of the system exceeds the normal control range, and may cause system stability problems At the same time, the configuration of high-frequency cutting device should be considered. 4.3 The power system high-frequency cut-off configuration should include different types of generator set combinations, grid structure and operation mode, etc. 4.4 The power system high-frequency cutting plan should be formulated, organized and implemented by the power grid operation department, and checked regularly. When the system condition has When major changes are made, it should be reconfigured. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40592-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40592-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 40592-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40592-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |