GB/T 40425.2-2025 English PDFUS$379.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40425.2-2025: Overhead contact charging system for electric buses - Part 2: Charging connection set Status: Valid
Basic dataStandard ID: GB/T 40425.2-2025 (GB/T40425.2-2025)Description (Translated English): Overhead contact charging system for electric buses - Part 2: Charging connection set Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: T35 Classification of International Standard: 43.040.99 Word Count Estimation: 18,119 Date of Issue: 2025-04-25 Date of Implementation: 2025-11-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 40425.2-2025: Overhead contact charging system for electric buses - Part 2: Charging connection set---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 43.040.99 CCST35 National Standard of the People's Republic of China Top contact charging system for electric buses Part 2.Charging connection device Released on 2025-04-25 2025-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of contentsPreface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Symbols 2 5 Rating 2 6 Technical Requirements 3 7 Size 5 8 Test methods 5 9 Logo 7 Appendix A (Normative) Pantograph and receiving bar contact dimensions 8 Appendix B (Informative) Installation Dimensions 9 Appendix C (Informative) Inclination Angle of the Power Bar 11ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is part 2 of GB/T 40425 "Top contact charging system for electric buses". GB/T 40425 has published the following part. --- Part 1.General requirements; --- Part 2.Charging connection device. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the Ministry of Industry and Information Technology of the People's Republic of China. This document is under the jurisdiction of the National Technical Committee on Automotive Standardization (SAC/TC114). This document was drafted by. BYD Auto Industry Co., Ltd., Shanghai Aowei Technology Development Co., Ltd., Anhui Ankai Automobile Co., Ltd. Company, China Automotive Research Institute Automobile Inspection Center (Tianjin) Co., Ltd., Yutong Bus Co., Ltd., China Automotive Technology and Research Center Co., Ltd., SAIC Commercial Vehicle Technology Center, Zhengzhou Shanxiang New Energy Technology Co., Ltd., and Beijing Weitongli Electric Co., Ltd. The main drafters of this document are. Peng Wang, Miao Xiaoli, Ma Aiguo, Li Zhen, Wang Jiaojiao, Zhang Jin, Zhu Zhengli, Xu Xiao, Xie Lingfeng, Yang Guosen, Jiang Jiefeng, Liu Chao, Liu Wei, Fang Pengwei, Huang Jian, and Liu Yubin.IntroductionElectric buses have the characteristics of large vehicle mass and large on-board power. They have high platform voltage and large battery capacity. Electric city buses generally run on fixed routes and can use stations and temporary stations for charging. Therefore, we can learn from the experience of supercapacitor electric vehicles and adopt the top contact automatic charging method to reduce the manual operation of charging and improve GB/T 40425 "Top contact charging system for electric buses" aims to establish the top contact conductive charging system for electric buses. The system requirements are to be composed of two parts. --- Part 1.General requirements. The purpose is to establish the overall requirements for the top contact charging system of electric buses and give the charging system Guidance circuit and control principle. --- Part 2.Charging connection device. The purpose is to establish the definition, requirements and test methods of the top contact charging connection device for electric buses. The test methods are used to guide the design and development of the industry as well as the construction and installation of charging facilities. Top contact charging system for electric buses Part 2.Charging connection device1 ScopeThis document specifies the ratings, technical requirements, test methods and markings for the top contact charging connection device of electric buses. This document is applicable to M2 and M3 electric buses with rated voltage not exceeding 1500V, rated current not exceeding 1500A, and complying with Design, development, production and installation of charging connection devices for top contact charging systems with connection method D.2 Normative referencesThe contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2408 Determination of the burning properties of plastics - Horizontal and vertical methods GB/T 2423.1-2008 Environmental testing for electric and electronic products Part 2.Test methods Test A. Low temperature GB/T 2423.2-2008 Environmental testing for electric and electronic products Part 2.Test methods Test B. High temperature GB/T 2423.4-2008 Environmental testing for electric and electronic products Part 2.Test methods Test Db. Cyclic damp heat (12h 12h cycle) GB/T 11918.1-2014 Industrial plugs, sockets and couplers Part 1.General requirements GB/T 16935.1-2023 Insulation coordination for equipment in low voltage systems Part 1.Principles, requirements and tests GB 18384 Safety requirements for electric vehicles GB/T 18487.1-2023 Electric vehicle conductive charging system Part 1.General requirements GB/T 19596 Terminology for Electric Vehicles GB/T 20234.1 Connection devices for conductive charging of electric vehicles Part 1.General requirements GB/T 21561.2-2018 Pantograph characteristics and tests for rail vehicles Part 2.Pantographs for subway and light rail vehicles Pantograph GB/T 28046.3-2011 Environmental conditions and testing for electrical and electronic equipment of road vehicles Part 3.Mechanical loads GB/T 40425.1-2021 Top contact charging system for electric buses Part 1.General requirements3 Terms and definitionsGB/T 11918.1-2014, GB/T 18487.1-2023, GB/T 19596, GB/T 20234.1 and GB/T 40425.1-2021 The following defined terms and definitions apply to this document. 3.1 Mechanical and electrical connection components connecting electric buses and electric bus power supply equipment. Note 1.Includes charging pantograph, charging bus, charging cable, etc. Note 2.See Figure 1 for a schematic diagram of the charging connection device. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40425.2-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 40425.2-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 40425.2-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40425.2-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |