GB/T 38329.2-2021 English PDFUS$1024.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38329.2-2021: Utility connections in port - Part 2: High and low voltage shore connection systems - Data communication for monitoring and control Status: Valid
Basic dataStandard ID: GB/T 38329.2-2021 (GB/T38329.2-2021)Description (Translated English): Utility connections in port - Part 2: High and low voltage shore connection systems - Data communication for monitoring and control Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: U60 Word Count Estimation: 54,591 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 38329.2-2021: Utility connections in port - Part 2: High and low voltage shore connection systems - Data communication for monitoring and control---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Utility connections in port-Part 2.High and low voltage shore connection systems-Data communication for monitoring and control ICS 47.020.60 U60 National Standards of People's Republic of China Port ship-shore connection part 2.high pressure and low pressure Data transmission for shore power connection system monitoring and control (IEC /IEEE80005-2.2016, IDT) Released on 2021-05-21 2021-12-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee Table of contentsForeword Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 2 5 Shore interface 4 6 Ship interface 14 7 Start the program 23 8 Process stopped 26 9 Data type format (big endian format) 27 10 Verification and Testing 28 Appendix A (Normative Appendix) Requirements for Cruise Ship Communication System 29 Appendix B (Normative Appendix) Modbus Register List 35ForewordGB/T 38329 "Port Ship-shore Connection" is planned to be divided into 3 parts. ---Part 1.General requirements for high-voltage shore connection (HVSC) systems; ---Part 2.Data transmission for monitoring and control of high-voltage and low-voltage shore connection systems; ---Part 3.General requirements for low-voltage shore connection (LVSC) systems. This part is Part 2 of GB/T 38329. This section was drafted in accordance with the rules given in GB/T 1.1-2009. The translation method used in this part is equivalent to IEC /IEEE80005-2.2016, Port Ship-to-shore Connection Part 2.High Voltage and Low Voltage Shore Power Data transmission for connection system monitoring and control". This part is proposed and managed by the National Marine Electrical and Electronic Equipment Standardization Technical Committee (SAC/TC531). Drafting organizations of this section. China Shipbuilding Industry Corporation 704 Research Institute, Jimei University, NARI Group Corporation. The main drafters of this section. Wang Shuo, Li Jia, Wu Jiying, Zhu Jinda, Ma Weiliang, Sheng Weiqun. Port ship-shore connection part 2.high pressure and low pressure Data transmission for shore power connection system monitoring and control1 ScopeThis part of GB/T 38329 specifies the data interface between the shore and the ship, as well as the implementation of non-emergency communications if necessary. The communication procedures for low-voltage and high-voltage shore connection systems specify interface descriptions, addresses and data types. Appendix A also stipulates the Communication requirements. The application of this part involves the appendix of GB/T 38329.1. This section does not specify the emergency communications described in GB/T 38329.1.2 Normative referencesThe following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 38329.1-2019 Port ship-to-shore connection Part 1.General requirements for high-voltage shore connection (HVSC) system (IEC /ISO /IEEE80005-1.2012, IDT)3 Terms and definitionsThe terms and definitions defined in GB/T 38329.1 apply to this document. 3.1 Emergency communication communicationforemergencyfunction A hard-wired signal to trip the feeder circuit breaker (ship and shore). 3.2 Non-emergency communication for non-emergency function Information and data exchange between the shore and the ship. Note. If this data exchange requires the circuit breaker to trip, then the communication will also be carried out through the secondary circuit. 3.3 Register 16-bit location for storing data. 3.4 High byte highbyte; HB The upper byte of the register, the leftmost 8 bits. 3.5 Low byte lowbyte; LB The low byte of the register, the rightmost 8 bits. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38329.2-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 38329.2-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 38329.2-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38329.2-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |