GB/T 37523-2019 English PDFUS$279.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37523-2019: Specification for data inspection and correction of wind power plant meteorological observation Status: Valid
Basic dataStandard ID: GB/T 37523-2019 (GB/T37523-2019)Description (Translated English): Specification for data inspection and correction of wind power plant meteorological observation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: A47 Classification of International Standard: 07.060 Word Count Estimation: 14,181 Date of Issue: 2019-06-04 Date of Implementation: 2020-01-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 37523-2019: Specification for data inspection and correction of wind power plant meteorological observation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Specification for data inspection and correction of wind power plant meteorological observation ICS 07.060 A47 National Standards of People's Republic of China Wind farm meteorological observation data review, interpolation and Revised technical specification Published on.2019-06-04 2020-01-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Information Requirements 1 4.1 Wind farm data 1 4.2 Information on the participating stations 1 4.3 Reanalysis of data 2 5 Data review 2 5.1 Data Format Audit 2 5.2 Integrity Audit 2 5.3 Rationality Review 2 5.4 Consistency review 3 5.5 Unreasonable data processing 3 6 Short-term observation data interpolation 3 6.1 Overview 3 6.2 Reference data for interpolation 3 6.3 Wind speed interpolation 3 6.4 Wind direction interpolation 4 6.5 Temperature and air pressure interpolation 4 7 representative year data revision 4 7.1 Overview 4 7.2 Selection of long-term reference materials 4 7.3 Wind Speed Correction 4 7.4 Temperature and air pressure correction 4 Appendix A (informative) Data consistency test method 5 Appendix B (informative) Interpolation method for short-term observation data 6 Appendix C (informative) Representation of the annual data revision method 7 Reference 8ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the China Meteorological Administration. This standard is divided by the National Climate and Climate Change Standardization Technical Committee Wind Energy Solar Climate Resources Subcommittee (SAC/ TC540/SC2). This standard was drafted. China Meteorological Administration Public Meteorological Service Center, China Electric Power Research Institute, Xinjiang Goldwind Technology Co., Ltd. the company. The main drafters of this standard. Zhang Yongshan, Song Lili, Yuan Chunhong, Yang Zhenbin, Wang Bo, Hu Ju, Wang Xiangyun, Huang Linhong, Hu Gaoshuo, Han Dong. Wind farm meteorological observation data review, interpolation and Revised technical specification1 ScopeThis standard specifies data review of wind farm meteorological observation data, short-term observation data interpolation, and representative data revision technology. This standard applies to the development and utilization of wind energy resources and related wind engineering application research.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 18709-2002 Wind farm wind energy resource measurement method3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Wind tower windmeasurementtower Sensors for wind speed, wind direction, and wind data recorders are used to measure tower structures for wind energy parameters. 3.2 Reanalysis data reanalysisdata The meteorological analysis data obtained by assimilation analysis of various meteorological observations using the numerical model as a tool. 3.3 Representative year data representativeyeardata Wind farm observation data analysis and processing, and its wind energy resource parameters can represent a set of complete annual data of the wind farm's multi-year average.4 Information requirements4.1 Wind farm data 4.1.1 Wind tower observation data The measured data of wind speed, wind direction, air temperature and air pressure of the wind farm shall be obtained in accordance with the provisions of Chapter 4 of GB/T 18709-2002. 4.1.2 Wind Tower Setting and Maintenance Information It should include basic information of the wind tower and instrument, instrument verification report, detection environment and its changes. 4.2 Information on the participating stations 4.2.1 Requirements for the certification station The participating station should. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37523-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37523-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 37523-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37523-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |