GB/T 37399-2019 English PDFUS$359.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37399-2019: Test methods for high voltage shore connection system Status: Valid
Basic dataStandard ID: GB/T 37399-2019 (GB/T37399-2019)Description (Translated English): Test methods for high voltage shore connection system Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: U60 Classification of International Standard: 47.020.60 Word Count Estimation: 18,190 Date of Issue: 2019-05-10 Date of Implementation: 2019-12-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 37399-2019: Test methods for high voltage shore connection system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Test methods for high voltage shore connection system ICS 47.020.60 U60 National Standards of People's Republic of China High voltage shore power test method Published on.2019-05-10 2019-12-01 implementation State market supervision and administration China National Standardization Administration issued ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Marine Electrical and Electronic Equipment Standardization Technical Committee (SAC/TC531). This standard was drafted. Qingdao Beihai Shipbuilding Heavy Industry Co., Ltd. The main drafters of this standard. Gu Kechao, Li Xiaoqiang. High voltage shore power test method1 ScopeThis standard specifies the conditions, contents, methods and requirements for the mooring test of the shipboard high voltage shore power system. This standard is applicable to the test of shipboard high voltage shore power systems with rated voltages above 1kV and 15kV and below.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. CB/T 3908 ship cable laying process CB/T 3909 ship electrical equipment installation process IEC 60092-503 Ship Electrical Installation Part 503. AC power supply with special voltage range from 1kV to 15kV system3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Shipborne high voltage shore power system shiphighvoltageshoreconnectionsystem A system installed on a ship for connecting shore power during port landing. Note. Generally include high voltage shore power box, high voltage transformer, shore power access control board, cable management system, etc. 3.2 Cable management system cablemanagementsystem Control, monitor and process all equipment for high voltage flexible control cables and their connections. Note. Generally, it consists of cable winch, shore power cable, plug, cable control system, etc., to realize the retracting and disengagement control and safety protection of shore power cables. 3.3 Rated voltage ratedvoltage Uo/U(Um) The normal voltage of the power system or equipment. Note. Uo is the rated voltage between the cable conductor and the ground or metal shield, U is the rated voltage between the cable conductors, Um is the "most The maximum value of the high system voltage. The unit is kV. 3.4 High voltage shore box shoreconnectionswitchboard High voltage switchgear for connecting shore power high voltage cables and high voltage transformers. Note. Connect the circuit breaker and various instruments, indications and alarm devices in the high-voltage shore power box, generally as close as possible to the ship's shore power cable connection. 3.5 Shore power access control board on-boardreceivingswitchboard The control panel for receiving the shore power supply on the secondary side of the high voltage transformer is generally used as an integral part of the main switchboard. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37399-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37399-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 37399-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37399-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |