Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 36545-2023 English PDF

US$929.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 36545-2023: Technical specification of mobile electrochemical energy storage system
Status: Valid

GB/T 36545: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 36545-2023929 Add to Cart 7 days Technical specification of mobile electrochemical energy storage system Valid
GB/T 36545-2018559 Add to Cart 3 days Technical requirements for mobile electrochemical energy storage system Obsolete

Similar standards

GB/T 36548   GB/T 36547   GB/T 36276   

Basic data

Standard ID: GB/T 36545-2023 (GB/T36545-2023)
Description (Translated English): Technical specification of mobile electrochemical energy storage system
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F19
Classification of International Standard: 27.180
Word Count Estimation: 46,487
Date of Issue: 2023-12-28
Date of Implementation: 2024-07-01
Older Standard (superseded by this standard): GB/T 36545-2018
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 36545-2023: Technical specification of mobile electrochemical energy storage system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27:180 CCSF19 National Standards of People's Republic of China Replace GB/T 36545-2018 Technical specifications for mobile electrochemical energy storage systems Published on 2023-12-28 2024-07-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee

Table of contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Classification and Coding 3 5 Normal operating conditions 4 6 Technical requirements 4 7 Test methods 12 8 Inspection Rules 30 9 Marking, transport and storage33 Appendix A (informative) Mobile electrochemical energy storage system structure 34 Appendix B (Normative) Clearances and Creepage Distances 35 Appendix C (Informative) Inspection Report 39

Foreword

This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document replaces GB/T 36545-2018 "Technical Requirements for Mobile Electrochemical Energy Storage Systems" and is consistent with GB/T 36545-2018: In addition to structural adjustments and editorial changes, the main technical changes are as follows: a) Added “classification and coding” of products (see Chapter 4); b) Changed the altitude requirements in "Environmental Conditions" and added ground bearing requirements (see 5:1, 4:3:2:1 of the:2018 version); c) Added general requirements for "batteries of electrochemical energy storage systems", "battery management systems", "energy storage converters" and "monitoring systems" (see 6:1:1); d) Changed the requirements for “safety signs” (see 6:1:2, 4:3:10 of the:2018 version); e) Added functional requirements for "starting and stopping", "operation information monitoring", "data statistics" and "data display and storage" (see 6:2:1, 6:2:8,6:2:9,6:2:10); f) Added the requirements for “protection”, including “no charging and no discharging protection, over-temperature protection, over-voltage and under-voltage protection, over-current protection, AC phase sequence protection, Information fault protection, fire alarm and protection, temperature control system fault protection” (see 6:2:6); g) Changed the switching time requirements for "conversion from grid-connected operation mode to off-grid operation mode" (see 6:3:2:1, 5:5:1 of the:2018 version); h) Added the switching time requirements for "conversion from off-grid operation mode to grid-connected operation mode" (see 6:3:2:2); i) The requirements for "grid-connected power quality" have been changed, and the requirements for "harmonic voltage", "voltage imbalance" and "voltage deviation" have been added (see 6:3:4,:2018 version of 5:1); j) Added functional requirements for “off-grid parallel connection” (see 6:3:5); k) Added the requirement for “rated energy” (see 6:3:6); l) Added the requirement of "energy conversion efficiency" (see 6:3:7); m) Changed the requirements for "electromagnetic compatibility" (see 6:4, 4:3:6 of the:2018 version); n) Changed the requirements for “insulation” (see 6:5:2, 4:3:8 of the:2018 edition); o) Changed the requirements for "equipotential bonding and protective grounding" (see 6:5:3, 4:3:9 of the:2018 version); p) Added the requirement of “structural stability” (see 6:6:3); q) Changed the requirements for “anti-vibration” (see 6:6:4, 4:2:2 of the:2018 edition); r) The requirements for "interface" have been changed, and the requirements for "DC charging interface" and "with remote monitoring wireless communication interface" have been added (see 6:7); s) Added the requirements for "vehicle compartment and auxiliary systems" (see 6:8); t) Added Chapter 7 "Test Methods" (see Chapter 7); u) The content of the test item table in the "Inspection Rules" has been changed (see Chapter 8, Chapter 6 of the:2018 edition); v) Added the content of "Appendix B Electrical Clearances and Creepage Distances" (see Appendix B): Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by the China Electricity Council: This document is under the jurisdiction of the National Electric Power Storage Standardization Technical Committee (SAC/TC550): This document was drafted by: China Electric Power Research Institute Co:, Ltd:, State Grid Shanghai Energy Internet Research Institute Co:, Ltd:, State Grid Jiangsu Provincial Electric Power Co:, Ltd: Electric Power Research Institute, State Grid Zhejiang Electric Power Co:, Ltd:, State Grid Fujian Electric Power Co:, Ltd:, State Grid Shandong Electric Power Co:, Ltd: Li Company Electric Power Research Institute, Guangdong Product Quality Supervision and Inspection Research Institute, Longyan Haidexin Automobile Co:, Ltd: The main drafters of this document: Wu Fubao, Tao Yibin, Yang Bo, Wang Deshun, Li Guanjun, Zhou Chen, Yang Qingbin, Sang Bingyu, Yu Haojie, Fan Yuanliang, Shi Mingming, Wang Xiangjin, He Dongsheng, Li Haoyuan, Zhuang Jun, Liu Weiliang, Li Kecheng, Feng Xinzhen, Sun Tiankui, Sun Bo, Zhu Shaojie, Huang Xinghua, Fu Jian, Xue Jinhua, Li Chong, Sun Jian, Yang Fan, Tu Xiaodong, Ji Liantao, Wei Lingfeng: The previous versions of this document and the documents it replaces are as follows: ---First published in:2018 as GB/T 36545-2018; ---This is the first revision: Technical specifications for mobile electrochemical energy storage systems

1 Scope

This document specifies the basic functions, electrical performance, electromagnetic compatibility, safety performance, appearance and mechanical requirements of mobile electrochemical energy storage systems: Technical requirements such as requirements, interfaces, vehicle compartments and auxiliary systems are described, the corresponding test methods are described, and the coding, normal working environment, inspection regulations are specified: regulations, marking, transportation and storage requirements: This document is applicable to lithium-ion batteries, lead-carbon batteries, and flow batteries as electrical energy storage media, with a three-phase AC port voltage level of 10kV: Design, manufacturing, testing, inspection, operation, maintenance and overhaul of mobile electrochemical energy storage systems of Chemical energy storage systems can be implemented as a reference:

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 1413 Series 1 Container Classification, Dimensions and Rated Mass GB 1589 External dimensions, axle load and mass limits of automobiles, trailers and automobile trains GB/T 2423:3 Environmental testing Part 2: Test method Test Cab: Constant humidity and heat test GB/T 2423:4 Environmental testing of electrical and electronic products Part 2: Test method Test Db: Alternating damp heat (12h 12h cycle) GB/T 2424:6 Environmental Testing Part 3: Supporting Documents and Guidelines Temperature/Humidity Test Chamber Performance Verification GB 2894 Safety signs and guidelines for their use GB/T 4208 Shell protection level (IP code) GB 4824 Limits and measurement methods for radio frequency disturbance characteristics of industrial, scientific and medical equipment GB/T 5273 Standardization of terminal dimensions for high-voltage electrical appliances GB/T 5338:1 Series 1 Container Technical Requirements and Test Methods Part 1: General Containers GB 7258 Motor vehicle operation safety technical conditions GB/T 11918:1 Industrial plugs, sockets and couplers Part 1: General requirements GB/T 12325 Power quality supply voltage deviation GB/T 12326 Power quality voltage fluctuation and flicker GB/T 14549 Power Quality Public Grid Harmonics GB/T 15543 Power quality three-phase voltage imbalance GB/T 15945 Power quality power system frequency deviation GB 16806 Fire linkage control system GB/T 16935:1 Insulation coordination of equipment in low-voltage systems Part 1: Principles, requirements and tests GB/T 17382 Series 1 Container handling and bolting GB/T 17626:2 Electromagnetic compatibility test and measurement technology electrostatic discharge immunity test GB/T 17626:3 Electromagnetic compatibility testing and measurement technology Radio frequency electromagnetic field radiation immunity test GB/T 17626:4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test GB/T 17626:5 Electromagnetic compatibility testing and measurement technology surge (impact) immunity test
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 36545-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 36545-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 36545-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 36545-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 36545-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 36545-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.