GB/T 34871-2017 English PDFUS$839.00 · In stock
Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34871-2017: Inspection specification of protection relay in smart substation Status: Valid
Basic dataStandard ID: GB/T 34871-2017 (GB/T34871-2017)Description (Translated English): Inspection specification of protection relay in smart substation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K45 Classification of International Standard: 29.240 Word Count Estimation: 42,461 Date of Issue: 2017-11-01 Date of Implementation: 2018-05-01 Regulation (derived from): National Standard Announcement 2017 No. 29 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 34871-2017: Inspection specification of protection relay in smart substation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Inspection specification of protection relay in smart substation ICS 29.240 K45 National Standards of People's Republic of China Intelligent substation relay protection testing and testing specifications Posted.2017-11-01 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 2 4 General 2 5 test conditions 2 5.1 Detection of environmental conditions 2 5.2 Detection of the benchmark conditions 2 5.3 test equipment 3 6 test and test 3 6.1 ICD model test 3 6.2 background communication normative test 4 6.3 Information Normative Testing 6 6.4 Packet Normative Test 10 6.5 Optical port transmit/receive power level test 13 6.6 Protection device function and basic performance test 14 6.7 Merger Unit Functions and Basic Performance Tests 17 6.8 intelligent terminal functions and basic performance testing 21 6.9 Structure and appearance inspection 24 6.10 power consumption test 24 6.11 Environmental Testing 25 6.12 power supply impact test 26 6.13 Mechanical properties test 27 6.14 insulation test 28 6.15 Electromagnetic compatibility 29 6.16 dynamic mode test 32 6.17 protection device network pressure test 36 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents. This standard proposed by the China Electricity Council and centralized. This standard was drafted by China Electric Power Research Institute, the State Power Dispatching Control Center, China Southern Power Grid Company Power Dispatching Control Center, Zhejiang Power Dispatching Control Center, Guangdong Power Dispatching Control Center, Hebei Power Dispatch Control Center, Shandong Power Dispatching Control Heart, Chongqing Power Dispatching Control Center, Hebei Electric Power Research Institute, Zhejiang Electric Power Research Institute, State Grid Electric Power Research Institute, Jiangsu Electric Power Power Science Research Institute, Henan Electric Power Research Institute, Hunan Electric Power Research Institute, Sichuan Electric Power Research Institute, Chongqing Electric Power Research Hospital, Nanjing NARI Insurance Co., Ltd., State Power Nanjing Automation Co., Ltd., Xu Ji Electric Co., Ltd., Beijing Sifang Ji Bao Automation Co., Ltd., Long Park, Shenzhen Rui Automation Co., Ltd. Following. The main drafters of this standard. Zhou Chunxia, Ai Shuyun, Xu Peng, Qian Jianguo, Wu Chonghao, Chen Qiaoping, Gao Xu, Yue, Wu Jun, Meng Chao, Tang Wing, Zhu Weijun, Li Naiyong, Zeng Zhian, Jiang Zhenchao, Ling Gang, Bu Qiangsheng, Han Wei, Wang Hongbin, Dai Guangwu, Chen Shi, Li Xu, Song Xiaozhou, Zhang Li Yang. Intelligent substation relay protection testing and testing specifications1 ScopeThis standard specifies the use of intelligent substation analog sampling, digital direct sampling, digital network sampling methods, the GOOSE Relay protection devices (hereinafter referred to as protection devices) and related devices (analog input type merging unit, intelligent Terminal) Test conditions, items, methods and results of the test method. This standard applies to 110 (66) kV and above voltage level intelligent substation protection devices and merger unit, the test of intelligent terminals test. 110 (66) kV voltage devices below the implementation of this standard.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2423.17-2008 Environmental testing for electric and electronic products Part 2. Test methods Test Ka. Salt spray GB/T 4208-2008 enclosure protection (IP code) Basic test methods of protection and automatic device GB/T 7261-2016 GB/T 11287-2000 Electrical relays - Part 21. Vibration, shock, bump and earthquakes of measuring relays and protection devices Test Part 1. Vibration test (sine) GB/T 14285 relay protection and safety automatic device technical regulations Shock and collision tests for relays and protection equipment GB/T 14537-1993 Measuring relays and protection equipment Part 1. General requirements Measuring relays and protection equipment - Part 22-3 - Electrical disturbance tests --- Radiated electromagnetic field resistance Scramble Measuring relays and protection equipment - Part 22-4. Electrical disturbance tests --- Electrical fast transient/pulse Rush immunity test GB/T 14598.11-2011 Measuring relays and protection equipment Part 11. Auxiliary power supply port voltage dips, short interruptions And voltage changes and ripple GB/T 14598.13-2008 Electrical relays - Part 22-1 - Electrical disturbance tests for measuring relays and protection devices 1MHz burst immunity test Measuring relays and protection equipment - Part 22-2. Electrical disturbance tests - Electrostatic discharge test GB/T 14598.16-2002 Electrical relays - Part 25. Electromagnetic emission test of measuring relays and protection devices GB/T 14598.17-2005 Electrical relays - Part 22-6. Electrical disturbance tests for measuring relays and protection devices --- RF field induced conduction disturbance immunity GB/T 14598.18-2012 Measuring relays and protection devices - Part 22-5 - Electrical disturbance tests --- Surge immunity test GB/T 14598.19-2007 Electrical relays - Part 22-7 - Electrical disturbance tests for measuring relays and protection devices --- Power frequency immunity test GB/T 14598.20-2007 Electrical relays - Part 26. Electromagnetic compatibility requirements for measuring relays and protection devices GB/T 14598.303 Digital motor general protection device general technical conditions ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34871-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34871-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 34871-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34871-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |