GB/T 34599-2017 English PDFUS$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34599-2017: Ramp control system application requirements Status: Valid
Basic dataStandard ID: GB/T 34599-2017 (GB/T34599-2017)Description (Translated English): Ramp control system application requirements Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: L79 Classification of International Standard: 35.100.01 Word Count Estimation: 14,139 Date of Issue: 2017-10-14 Date of Implementation: 2018-05-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 34599-2017: Ramp control system application requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Ramp control system application requirements ICS 35.100.01 L79 National Standards of People's Republic of China Ramp Control System Setup Requirements 2017-10-14 Published 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 symbol 2 5 basic requirements 2 6 control conditions and strategies 3 7 system structure and function 4 8 equipment and facilities layout requirements 6 9 central control system requirements 7 Appendix A (informative) ramp regulation algorithm 9 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Intelligent Transport System Standardization Technical Committee (SAC/TC268). This standard drafting unit. Shanghai Urban Construction Design and Research Institute (Group) Co., Ltd., Ministry of Transport Road Research Institute, Beijing China Communications Technologies Co., Ltd. Tong Tong, Tongji University, Shanghai Branch of Intelligent Systems Co., Ltd., Jiangsu Province, traffic planning Accounting Institute Co., Ltd. The main drafters of this standard.Police Lixia, Liu Weijie, Ji Jinzhang, Chen Hongjie, Ma Wanjing, Chen Hong, Peng Qingyan, Wang Wei Feng, Lu Xiaofang, Zhang Jiancang, Wang Qilin, Shen Ming, Yang Gencheng, Gao Xiang, Ni Wei, Wang Baohui, Yu Hong, Wang Liang. Ramp Control System Setup Requirements1 ScopeThis standard specifies the city expressway entrance ramp control system planning, design, implementation process and field, central control system settings basic requirements. This standard applies to the urban expressway ramp entrance ramp control strategy selection, system construction and equipment layout, guide the expressway control system Planning, design, construction and management. Highway entrance ramp, bridge entrance control can refer to the implementation.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 5768.3 Road traffic signs and marking Part 3. Road traffic marking GB 14886 Road traffic signal setting and installation specifications GB 14887 Road traffic lights GB/T 19582.1 Modbus based industrial automation network specification Part 1. Modbus Application Protocol CJJ37 Urban Road Design Code CJJ129 urban expressway design rules GA/T 484 LED Road Traffic Induces Variable Message Signs GA/T 496 red light automatic recording system General technical conditions3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Expressway entrance ramp expresswayentranceramp Into the expressway main line of the dedicated road. 3.2 Ramp control rampcontrol By setting a dedicated signal on the ramp to control the traffic flow into the expressway, including the ramp off, ramp adjustment and other means. 3.3 Ramp closes rampclosure Prohibit vehicles from entering the ramp into the expressway. 3.4 Ramp regulation rampmetering Set on-ramp signal to allow vehicles to enter the expressway at timed intervals. 3.5 Timing ramp adjustment pre-timedrampmetering According to historical traffic data, a fixed, or according to changes in the time of day and a few pre-set fixed ramp rate ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34599-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34599-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 34599-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34599-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |