GB/T 34575-2023 English PDFUS$389.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34575-2023: Railway applications - Converter equipment on board rolling stock - Auxiliary converter for locomotive and multiple unit Status: Valid GB/T 34575: Historical versions
Basic dataStandard ID: GB/T 34575-2023 (GB/T34575-2023)Description (Translated English): Railway applications - Converter equipment on board rolling stock - Auxiliary converter for locomotive and multiple unit Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: S35 Classification of International Standard: 29.280 Word Count Estimation: 19,152 Date of Issue: 2023-11-27 Date of Implementation: 2024-03-01 Older Standard (superseded by this standard): GB/T 34575-2017 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 34575-2023: Railway applications - Converter equipment on board rolling stock - Auxiliary converter for locomotive and multiple unit---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 29:280 CCSS35 National Standards of People's Republic of China Replace GB/T 34575-2017 Rail transit rolling stock converter equipment Auxiliary converters for locomotives and EMUs Published on 2023-11-27 2024-03-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee Table of contentsPrefaceⅠ 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Environmental conditions 2 5 product form 2 6 Main parameters 2 7 Technical requirements 5 8 Test methods 7 9 Inspection Rules 10 10 Marking, packaging, transportation and storage 12 Reference 14ForewordThis document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document replaces GB/T 34575-2017 "Auxiliary Converter for Electric Locomotives": Compared with GB/T 34575-2017, except for structural adjustments In addition to editorial changes, the main technical changes are as follows: a) Changed the scope of application (see Chapter 1, Chapter 1 of the:2017 edition); b) Changes in terms and definitions (see Chapter 3, Chapter 3 of the:2017 edition); c) Changed environmental conditions (see Chapter 4, Chapter 4 of the:2017 edition); d) Added product forms (see Chapter 5); e) Changed the auxiliary converter division mode according to the input voltage form (see 6:1:1, 5:1:1 of the:2017 version); f) Changed the output characteristic parameters (see 6:2, 5:2 of the:2017 version); g) The control power supply characteristic parameters have been changed (see 6:3, 5:3 of the:2017 edition); h) Changed the general requirements (see 7:1, 6:1 of the:2017 version); i) The insulation performance requirements have been changed (see 7:2, 6:2 of the:2017 edition); j) Added control method requirements (see 7:3); k) Changed the cooling performance requirements (see 7:5, 6:4 of the:2017 version); l) Protection requirements have been changed (see 7:6, 6:5 of the:2017 version); m) Changed the temperature rise requirements (see 7:8, 6:7 of the:2017 version); n) Changed the moisture resistance performance requirements (see 7:9, 6:8 of the:2017 edition); o) Changed the noise requirements (see 7:11, 6:10 of the:2017 version); p) The protection level requirements have been changed (see 7:12, 6:11 of the:2017 edition); q) Added high temperature starting temperature requirements (see 7:14); r) Changed the insulation resistance test method (see 8:8, 7:7 of the:2017 edition); s) Changed the commutation test method (see 8:12, 7:12 of the:2017 edition); t) The temperature rise test method has been changed (see 8:14, 7:14 of the:2017 version); u) Added overvoltage and transient energy test methods (see 8:16); v) The test method for short-term interruption of power supply has been changed (see 8:22, 7:21 of the:2017 version); w) The output current sharing test is deleted (see 7:22 of the:2017 version); x) Added high temperature startup test (see 8:29:1); y) Changed the high temperature operation test method (see 8:29:2, 7:30 of the:2017 edition); z) The low temperature test method has been changed (see 8:30, 7:31 of the:2017 edition); aa) The alternating damp heat test method has been changed (see 8:31, 7:32 of the:2017 edition); bb) Changed the type inspection conditions (see 9:3:3, 8:3:3 of the:2017 version); cc) Changed the minimum document content that should be included in the packaging box (see 10:2:2b), 9:2:2 of the:2017 version); dd) Added coolant filling requirements (see 10:3); ee) Changes to transportation and storage requirements (see 10:4, 9:3 of the:2017 edition): Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by the National Railway Administration: This document is under the jurisdiction of the National Rail Transit Electrical Equipment and Systems Standardization Technical Committee (SAC/TC278): This document was drafted by: CRRC Zhuzhou Electric Locomotive Research Institute Co:, Ltd:, China Academy of Railway Sciences Group Co:, Ltd: Locomotives and Rolling Stocks Research Institute, CRRC Qingdao Sifang Rolling Stock Research Institute Co:, Ltd:, CRRC Qingdao Sifang Rolling Stock Co:, Ltd:, CRRC Yongji Electric Co:, Ltd: Company, CRRC Zhuzhou Electric Locomotive Co:, Ltd:, China Railway Inspection and Certification Zhuzhou Traction Electrical Equipment Inspection Station Co:, Ltd:, CRRC Qishuyan Locomotive Ltd: The main drafters of this document: Rao Peinan, Wang Jiajia, Mei Wenqing, Liu Weizhi, Wang Yongxiang, Yang Dongjun, Chu Yongchen, Wang Changliang, Luo Guoyong, Chen Hong, Zou Huanqing, Zhang Ning, Chai Yongquan: The previous versions of this document and the documents it replaces are as follows: ---First published as GB/T 34575-2017 in:2017; ---This is the first revision: Rail transit rolling stock converter equipment Auxiliary converters for locomotives and EMUs1 ScopeThis document specifies the environmental conditions, product forms, main parameters, and technical requirements for auxiliary converters for electric locomotives, electric multiple units, and diesel locomotives: Requirements, inspection rules, marking, packaging, transportation and storage: This document describes the testing of auxiliary converters for electric locomotives, electric multiple units and diesel locomotives: method: This document applies to the design, manufacture, acceptance and use of auxiliary converters installed on electric locomotives, electric multiple units and diesel locomotives: The auxiliary converters of other locomotives or EMUs shall be implemented accordingly:2 Normative reference documentsThe contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 1402 Rail transit traction power supply system voltage GB/T 2423:1-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test A: Low temperature GB/T 2423:2-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test B: High temperature GB/T 2423:4-2008 Environmental testing of electrical and electronic products Part 2: Test methods Test Db: Alternating damp heat (12h 12h cycle) GB/T 2423:17 Environmental testing of electrical and electronic products Part 2: Test methods Test Ka: Salt spray GB/T 2900:32 Electrical terminology power semiconductor devices GB/T 2900:33 Electrical Terminology Power Electronics Technology GB/T 4208-2017 Shell protection level (IP code) GB/T 21413:1-2018 Electrical equipment for rail transit rolling stock Part 1: General conditions of use and general rules GB/T 21414-2021 Regulations on the protection of electrical hazards in rail transit rolling stock GB/T 21563-2018 Impact and vibration test of rail transit rolling stock equipment GB/T 24338:4 Rail transit electromagnetic compatibility Part 3-2: Rolling stock equipment GB/T 25119-2021 Electronic devices for rail transit rolling stock GB/T 25122:1-2018 Power converters for rail transit rolling stock Part 1: Characteristics and test methods GB/T 25122:3 Power converters for rail transit rolling stock Part 3: Locomotive traction converters GB/T 25122:4 Power converters for rail transit rolling stock Part 4: Traction converters for electric multiple units GB/T 32347:1-2015 Environmental conditions for rail transit equipment Part 1: Locomotive and rolling stock equipment GB/T 32350:1 Rail transit insulation coordination Part 1: Basic requirements for electrical clearance and creepage of electrical and electronic equipment distance GB/T 34571 Rail transit rolling stock wiring rules3 Terms and definitionsGB/T 2900:32, GB/T 2900:33, GB/T 32350:1 and GB/T 25122:1-2018 as well as the following terms and definitions ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34575-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 34575-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 34575-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34575-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 34575-2023?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 34575-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |