Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 34120-2023 English PDF

US$849.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 34120-2023: Technical requirements for power conversion system of electrochemical energy storage system
Status: Valid

GB/T 34120: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 34120-2023849 Add to Cart 6 days Technical requirements for power conversion system of electrochemical energy storage system Valid
GB/T 34120-2017225 Add to Cart Auto, < 3 mins Technical specification for power conversion system of electrochemical energy storage system Obsolete

Similar standards

GB/T 34131   GB/T 34133   GB/T 34537   GB/T 45539   GB/T 34129   

Basic data

Standard ID: GB/T 34120-2023 (GB/T34120-2023)
Description (Translated English): Technical requirements for power conversion system of electrochemical energy storage system
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F19
Classification of International Standard: 27.180
Word Count Estimation: 42,482
Date of Issue: 2023-12-28
Date of Implementation: 2024-07-01
Older Standard (superseded by this standard): GB/T 34120-2017
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 34120-2023: Technical requirements for power conversion system of electrochemical energy storage system


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27:180 CCSF19 National Standards of People's Republic of China Replace GB/T 34120-2017 Technical requirements for energy storage converters in electrochemical energy storage systems energy storage system 2024-07-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee

Table of contents

PrefaceⅠ 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Classification and Coding 2 5 Normal operating conditions 4 6 Appearance and protection level 5 7 Basic functions 5 8 Performance indicators 6 9 Electromagnetic compatibility 21 10 Auxiliary systems 25 11 Inspection Rules 25 12 Marking, packaging, transportation and storage28 Appendix A (informative) Typical topology of energy storage converter 30 Appendix B (Normative) Equipment Symbols 32 Appendix C (Normative) Clearances and Creepage Distances 34 Reference 38

Foreword

This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document replaces GB/T 34120-2017 "Technical Specifications for Energy Storage Converters for Electrochemical Energy Storage Systems" and is consistent with GB/T 34120-2017: In addition to structural adjustments and editorial changes, the main technical changes are as follows: ---Changed the scope of use of the document and determined the upper limit of "output AC voltage" to 35kV (see Chapter 1,:2017 Edition No: 1 chapter); ---Added "AC port", "DC port", "fault ride through", "low voltage ride through", "high voltage ride through", "primary frequency modulation" and "inertia response" and "contact current" and other terms, deleted terms that are repeated with DL/T 2528 (see Chapter 3, Chapter 3 of the:2017 edition); ---Added "by connection relationship with the power grid", "by access voltage level", "by installation and use environment", "by cooling method" and "by topology structure" Product classifications such as “structure” and “product coding” (see Chapter 4); ---Changed the "electrical conditions for grid-connected operation" and added "off-grid operation conditions" (see 5:2 and 5:3, 5:1 of the:2017 version); ---Added "Appearance and Protection Level" (see Chapter 6); ---Added "start and stop", "alarm and protection", "insulation resistance detection", "operation information monitoring", "statistics" and "data display and storage", etc: Functional requirements (see 7:1, 7:4, 7:5, 7:7, 7:8 and 7:9); ---Added "power output range", "primary frequency regulation", "inertia response", "high voltage ride through", "continuous fault ride through", "operation adaptability" and Electrical performance requirements such as "equipment availability" (see 8:1:1:1, 8:1:1:3, 8:1:1:4, 8:1:8:1:2, 8:1:8:4, 8:1:9 and 8:1:14); ---The "electrical safety distance" and "insulation requirements" have been changed, and "equipotential connection and protective grounding" and "capacitor residual energy hazard prevention" have been added: Safety performance requirements such as "protection" and "mechanical protection" (see 8:2:1:1, 8:2:1:2, 8:2:1:3, 8:2:1:4, 8:2:4, 5:7 of the:2017 edition and 5:8); ---The requirements for "low temperature adaptability", "high temperature adaptability" and "humid heat adaptability" have been changed, and the requirements for "salt spray adaptability" have been added (see 8:2:3:1~8:2:3:4,:2017 version 5:4:20); ---Changed the "electromagnetic compatibility" requirements and put forward corresponding requirements according to different access voltage levels (see Chapter 9, 5:8 of the:2017 edition); ---Added "auxiliary system" (see Chapter 10); ---The requirements for "inspection rules" have been changed, and test items have been adjusted according to product classification and new technical requirements (see Chapter 11,:2017 Chapter 6 of the annual edition): Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by the China Electricity Council: This document is under the jurisdiction of the National Electric Power Storage Standardization Technical Committee (SAC/TC550): This document was drafted by: China Electric Power Research Institute Co:, Ltd:, State Grid Corporation of China, Sungrow Power Supply Co:, Ltd:, Huawei Digital Energy Technology Co:, Ltd:, Xinjiang Goldwind Technology Co:, Ltd:, Shenzhen Kelu Electronic Technology Co:, Ltd:, Nanjing Nariji Bao Electric Co:, Ltd:, Guangzhou Zhiguang Energy Storage Technology Co:, Ltd:, Envision Energy Co:, Ltd:, China Power Purui Electric Power Engineering Co:, Ltd:, Xuchang Kai Pu Testing Research Institute Co:, Ltd: and Shangneng Electric Co:, Ltd: The main drafters of this document: Hui Dong, Xu Shouping, Du Ronghua, Zhao Mingquan, Chen Zhilei, Yang Bo, Wang Junli, Li Gang, Ruan Haiming, Huang Xiaoge, Shi Benxing, Li Xu, Hu Juan, Wen Jin, Yan Hui, Chen Zhuo, Zhang Ying, Xin Kai, Chen Fanglin, Chen Xitao, Yang Xingchen, Liu Yunfeng, Ge Shuzheng, Yang Meng, Liu He, Zhan Xiong, Li Zongyuan, Gao Jun'e, Fu Shanshan, Yan Xuesheng, Mao Haibo, Li Zhongqiong, Li Zeyang: The previous versions of this document and the documents it replaces are as follows: ---First published as GB/T 34120-2017 in:2017; ---This is the first revision: Technical requirements for energy storage converters in electrochemical energy storage systems

1 Scope

This document specifies the start-up, shutdown, power control, and off-grid switching of energy storage converters for electrochemical energy storage systems (hereinafter referred to as "energy storage converters"): Functional requirements such as replacement, alarm and protection, insulation resistance detection, communication, operating information monitoring, statistics, data display and storage, electrical performance and safety Full performance and other performance requirements, as well as classification and coding, normal working conditions, appearance and protection level, electromagnetic compatibility, auxiliary systems, inspection rules, Marking, packaging, transportation and storage requirements: This document is applicable to the design and manufacture of energy storage converters using electrochemical batteries as energy storage carriers and with AC port voltages of 35kV and below: manufacturing, testing, testing, operation, maintenance and overhaul:

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 191 Packaging, storage and transportation pictorial mark GB/T 4208 Shell protection level (IP code) GB/T 4798:2 Environmental condition classification Environmental parameter group classification and severity classification Part 2: Transportation and loading and unloading GB/T 12325 Power quality supply voltage deviation GB/T 12326 Power quality voltage fluctuation and flicker GB/T 13384 General technical conditions for mechanical and electrical product packaging GB/T 14549 Power Quality Public Grid Harmonics GB/T 15543 Power quality three-phase voltage imbalance GB/T 15945 Power quality power system frequency deviation GB/T 17626:2 Electromagnetic compatibility test and measurement technology electrostatic discharge immunity test GB/T 17626:3 Electromagnetic compatibility testing and measurement technology Radio frequency electromagnetic field radiation immunity test GB/T 17626:4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test GB/T 17626:5 Electromagnetic compatibility testing and measurement technology surge (impact) immunity test GB/T 17626:6 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity induced by radio frequency fields GB/T 17626:8 Electromagnetic compatibility testing and measurement technology power frequency magnetic field immunity test GB/T 17799:2 General standard for electromagnetic compatibility Part 2: Immunity standards in industrial environments GB/T 20626:1 Plateau electrical and electronic products under special environmental conditions Part 1: General technical requirements GB/T 24337 Power quality harmonics between public grids GB/T 34133 Technical regulations for testing of energy storage converters DL/T 860 (all parts) Power automation communication networks and systems DL/T 2528 Basic terminology of electric energy storage

3 Terms and definitions

The terms and definitions defined in DL/T 2528 and below apply to this document:
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 34120-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 34120-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 34120-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 34120-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 34120-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 34120-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.