GB/T 33590.2-2017 English PDFUS$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 33590.2-2017: Technical specification of smart grid operation and control systems -- Part 2: Terminology Status: Valid
Basic dataStandard ID: GB/T 33590.2-2017 (GB/T33590.2-2017)Description (Translated English): Technical specification of smart grid operation and control systems -- Part 2: Terminology Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K04 Classification of International Standard: 01.040.29 Word Count Estimation: 26,212 Date of Issue: 2017-05-12 Date of Implementation: 2017-12-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the terms, definitions, and abbreviations used in the Smart Grid Dispatch Control System. This standard is applicable to the preparation and system design, development and construction of the standard system of intelligent grid dispatching control system. It can also be used for reference of professional and technical exchange. GB/T 33590.2-2017: Technical specification of smart grid operation and control systems -- Part 2: Terminology---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Techaical specification of smart grid operation and control systems - Part 2. Terminology ICS 01.040.29 K04 National Standards of People's Republic of China Technical specification for intelligent grid dispatching control system Part 2. Terminology controlsystems-Part 2. Terminology 2017-05-12 released 2017-12-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 Basic Concept 1 3 basic platform 3 4 Application 5 5 Abbreviations 14 References 16 Index 17 ForewordThis part is drafted in accordance with the rules given in GB/T 1.1-2009. This part is proposed by the China Electricity Council. This part of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446) centralized. This part of the drafting unit. State Grid Corporation of the State Power Dispatching Control Center, China Southern Power Grid Power Dispatching Control Center, Rui Technology Co., Ltd., State Grid Corporation of Central China Branch, China Electric Power Research Institute, China Southern Power Grid Research Institute, the State Grid Corporation Division North Division, State Grid Corporation of Southwest Division, State Grid Liaoning Electric Power Co., Ltd., Guangdong Power Grid limited liability company. The main drafters of this part are. Nan Guilin, Cheng Yun, Hu Rong, Tengxianliang, Lu Jinjun, Chen Guoping, Xu Hongqiang, Yan Yaqin, Zhou Huafeng, Zhang Ximing, TANG Wei-dong, PAN Yi, FENG Shu-hai, CHEN Bo, ZHAI Ming-yu, MA Fa-yong, SUN Yun-feng, ZHANG Yong, WANG Min-kun, DUAN Rong-bin, Technical specification for intelligent grid dispatching control system Part 2. Terminology1 ScopeThis section specifies the terms, definitions, and abbreviations used in the Smart Grid Dispatch Control System. This part is applicable to the compilation and system design, development, construction and technical exchange of the standard of intelligent grid dispatching control system. reference.2 basic concepts2.1 Application application Smart grid scheduling control system consists of a group of closely related functions, used to complete a certain aspect of business work. 2.2 Application class applicationcategories Smart grid scheduling control system consists of a group of business needs similar to the nature of similar applications or similar to the completion of a class of business jobs. 2.3 Security check class application securitycheckingapplication Dispatch plan and grid operation operation (operation task, operation ticket) security check the technical support, mainly to complete the scheduling plan and power grid operation Operational safety check, stability margin assessment, and proposed adjustment recommendations. 2.4 Grid operation intelligent system operationsmartsystem; OS2 Support the operation of large power grid, provide power grid operation planning, monitoring, analysis, decision making, command, operation, control and management functions, integrating all two Sub-system, play a comprehensive benefit, with interactive, intelligent integration of the characteristics of the system. 2.5 Power grid running cockpit class application powersystemoperationalcockpitapplication Power grid operation KPI monitoring and early warning, information mining, auxiliary decision-making and control of technical support, including the operation of KPI monitoring early warning, transport Line panorama view, centralized console and so on. 2.6 Scheduling management class application operationmanagementapplication Dispatching agencies daily scheduling production management technical support, to achieve standardization of power grid dispatch, process and integrated management of technical support. 2.7 Dispatched plan class application dispatchingscheduleapplication The technical support of the scheduling planning business, the main completion of multi-objective, multi-constrained, multi-time scheduling of the automatic preparation, optimization and analysis Evaluation. 2.8 The underlying platform foundationalplatform Intelligent grid scheduling control system for the various types of applications for data management, information transmission and exchange, public services, security management, ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 33590.2-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 33590.2-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 33590.2-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 33590.2-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |