GB/T 31991.4-2015 English PDFUS$169.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31991.4-2015: Technical specification of electric energy service management platform -- Part 4: Design specification Status: Valid
Basic dataStandard ID: GB/T 31991.4-2015 (GB/T31991.4-2015)Description (Translated English): Technical specification of electric energy service management platform -- Part 4: Design specification Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K07 Classification of International Standard: 29.020 Word Count Estimation: 8,847 Date of Issue: 2015-09-11 Date of Implementation: 2016-04-01 Quoted Standard: GB/T 2887; GB/T 31991.1-2015; GB/T 31991.2; GB/T 31991.3; GB/T 31991.5 Regulation (derived from): National Standard Announcement 2015 No.25 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This Standard specifies the design principles of electricity service management platform, the platform architecture, functional design, interface design, communications network design, interface design, performance, safety and working environment for a total. This section applies to the platform design, development, construction and operation and maintenance. GB/T 31991.4-2015: Technical specification of electric energy service management platform -- Part 4: Design specification---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical specification of electric energy service management platform Part 4.. Design specification ICS 29.020 K07 National Standards of People's Republic of China Energy Service Management Platform Technical Specifications Part 4. Design Specification Part 4. Designspecification Issued on. 2015-09-11 2016-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordGB/T 31991 "Energy service management platform technical specifications" is divided into five sections. --- Part 1. General; --- Part 2. Functional specification; --- Part 3. Interface Specification; --- Part 4. design specifications; --- Part 5. Security specification. This section GB/T Part of 431,991. This section drafted in accordance with GB/T 1.1-2009 given rules. This section is proposed and managed by the China Electricity Council. This part of the main drafting units. China Electric Power Research Institute. Participated in the drafting of this section. State Grid Power Company, Shandong Province, Beijing Power Price Waterhouse Information Technology Co., Beijing Guodian Technology Network Limited surgery, Longshine Technology Co., Waterhouse - Micron (Beijing) Technology Co., Ltd. Beijing Huadian Fang Sheng Technology Development Co., Ltd. The main drafters of this section. Chen Chu enterprises, Li Bin, Xie Hongbin, Yan Hua, Liu Chang, Lin Jingyi, Cai Liang, Yan Aimei, Wang Zhiliang, Sun Zhongcheng, Zheng too. Energy Service Management Platform Technical Specifications Part 4. Design Specification1 ScopeThis section GB/T 31991 specifies the electrical energy service management platform (hereinafter referred to as "platform") design principles, platform architecture, feature set Design, interface design, communications network design, interface design, performance, safety and working environment requirements. This section applies to the platform design, development, construction and operation and maintenance.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2887 computer sites generic specification GB/T 31991.1-2015 Energy Service Management Platform Technical specifications - Part 1. General GB/T 31991.2 Energy Service Management Platform Technical specifications - Part 2. Functional specification GB/T 31991.3 Energy Service Management Platform Technical specification - Part 3. Interface Specification GB/T 31991.5 Energy Service Management Platform Technical specification - Part 5. Security Specification3 Terms and DefinitionsTerms and definitions GB/T 31991.1 defined apply to this document.4 Design PrinciplesPlatform design should follow the following principles. --- Safe, reliable, full-featured, advanced technology, open and orderly; --- Overall design platform should have good form, among various functional modules to meet the low coupling, to meet the high inner functional modules Cohesion; --- Internet service should be energy saving and improve the important information support tools for energy efficiency; --- Platform should conform to the principles of recent construction scale and long-term development plan coordinated.5 platform architecture5.1 Logical Architecture Logical architecture design shall be GB/T 31991.1-2015 System Architecture 5.2 implemented. 5.2 Technical Architecture Platform should meet safety at construction, reliability, availability, scalability, and other characteristics. Platform functionality should be realized in a modular way. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31991.4-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31991.4-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 31991.4-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31991.4-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |