GB/T 30032.3-2017 English PDFUS$199.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30032.3-2017: Mobile elevating work platforms -- Design, calculations, safety requirements and test methods relative to special features -- Part 3: MEWPs for orchard operations Status: Valid
Basic dataStandard ID: GB/T 30032.3-2017 (GB/T30032.3-2017)Description (Translated English): Mobile elevating work platforms -- Design, calculations, safety requirements and test methods relative to special features -- Part 3: MEWPs for orchard operations Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J80 Classification of International Standard: 53.020.99 Word Count Estimation: 10,139 Date of Issue: 2017-10-14 Date of Implementation: 2018-05-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 30032.3-2017: Mobile elevating work platforms -- Design, calculations, safety requirements and test methods relative to special features -- Part 3: MEWPs for orchard operations---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Mobile elevating work platforms - Design, calculations, safety requirements and test methods relative to special features - Part 3. MEWPs for orchard operations ICS 53.020.99 J80 National Standards of People's Republic of China Mobile lifting platform with special components Design, calculation, safety requirements and test methods Part 3. Orchard mobile lifting platform Mobileelevatingworkplatforms-Design, calculations, safety Part 3.MEWPsfororchardoperations (ISO 16653-3.2011, MOD) 2017-10-14 Published 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Safety requirements and/or precautions 1 5 Verification of safety requirements and/or measures 4 Appendix A (informative) dangerous list 5 ForewordGB/T 30032 "mobile lifting work platform with special components design, calculation, safety requirements and test methods" is divided into three section. --- Part 1. Mobile lifting platform equipped with telescopic fence system; --- Part 2. Mobile lifting platform equipped with non-conductive (insulating) components; --- Part 3. Orchard with mobile lifting platform. This section GB/T 30032 Part 3. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses redrafted law revision using ISO 16653-3.2011 "mobile lifting platform with a special design components, Calculation, safety requirements and test methods - Part 3. Mobile lifting platform for orchards ". This part of ISO 16653-3.2011 technical differences and the reasons are as follows. --- On the normative references, this section made a technical difference with the adjustment to adapt to China's technical conditions, adjust the situation Concentration reflected in the second chapter "Normative references", the specific adjustments are as follows. ● ISO 16368, which is referenced in ISO 16653-3-2011, is replaced by GB/T 25849-2010, modified to adopt international standards. 2010 (see Chapter 1, 4.1.1, 4.1.2, 4.3, 4.4.1, 4.4.2, 4.4.3, 4.5.1, 4.5.2, 4.5.3, 4.6, Chapter 5 and Appendix A) ; ● GB/T 14048.5-2008 modified to adopt international standards instead of ISO 16653-3.2011 IEC 60947-5-1.2003 [see 4.5.14)]. --- Removed ISO 16653-3.2011 provisions unrelated to this section footnote [see 4.5.14)]. This part is proposed by China Machinery Industry Federation. This part of the national lifting work platform Standardization Technical Committee (SAC/TC335) centralized. This section drafted unit. Beijing Institute of Construction Machinery, Zhejiang Machinery Co., Ltd., Hunan Xingbang Heavy Industry Co., Ltd., in Construction Education Association of China Construction Machinery Vocational Education Professional Committee, Beijing Research and Development Machinery Technology Co., Ltd. The main drafters of this section. Yin Wenjing, Xu Shugen, Wang Xiaolan, Xie Danlei, Li Jing, Zhang Juan, Wang Chunzhuo. Mobile lifting platform with special components Design, calculation, safety requirements and test methods Part 3. Orchard mobile lifting platform1 ScopeGB/T 30032 provisions of this part of the applicable orchard operation of mobile lifting platform (hereinafter referred to as MEWP) design, Calculation, safety requirements and test methods. This section as a supplement to GB/T 25849 and with its supporting use. Unless otherwise stated in this section Ming, GB/T 25849 the provisions apply to this section. This section provides the MEWP first applied to the orchard operation before the structural design calculations and stability criteria, manufacturing, safety inspection and test Test This section identifies the hazards that MEWP applies to orchard operations and describes measures to eliminate and mitigate these risks. This section applies to single-arm MEWP. The single-arm MEWP is controlled at the platform and used in the orchard for movement Personnel to work position for picking fruit and cutting trees and erecting vines. Note. The Orchard MEWP is a typical non-rotating device based on a two-wheel drive shaft and a caster rear wheel. Different lifting height requirements depend on the planting Growth and climatic conditions. MEWP for drupes, pomes and citrus orchards usually has a height of 2.5m ~ 4.5m. Used for avocado fruit Park MEWP usually lift height up to 6.5m, and occasionally there are equipment up to 8m ~ 10m. Receiving season, MEWP for orchard operations Fruit bags are available to collect fruits and nuts and deliver them to collection points. Rated load, including staff, usually 170kg ~.200kg.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 14048.5-2008 Low-voltage switchgear and control equipment Part 5-1. Control circuit devices and switching elements Electrical and Mechanical Control circuit electronics (IEC 60947-5-1.2003, MOD) GB/T 25849-2010 mobile lifting work platform design calculations, safety requirements and test methods (ISO 16368.2003, MOD)3 Terms and definitionsGB/T 25849 defined and the following terms and definitions apply to this document. 3.1 Orchard orchard A specific area where fruits or nuts grow. 4 Safety requirements and/or protective measures 4.1 Structural calculation 4.1.1 Rated load When calculating the rated load, the following provisions replace GB/T 25849-2010 5.2.3.1. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30032.3-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 30032.3-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 30032.3-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30032.3-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |