Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 29549.3-2013 English PDF

US$559.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 29549.3-2013: Specification for offshore modular drilling rigs on fixed platforms -- Part 3: Hook-up, commissioning, and acceptance
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 29549.3-2013559 Add to Cart 5 days Specification for offshore modular drilling rigs on fixed platforms -- Part 3: Hook-up, commissioning, and acceptance Valid

Similar standards

GB/T 18604   GB/T 23258   SY/T 5164   GB/T 23506   GB/T 45134   GB/T 29549.1   

Basic data

Standard ID: GB/T 29549.3-2013 (GB/T29549.3-2013)
Description (Translated English): Specification for offshore modular drilling rigs on fixed platforms -- Part 3: Hook-up, commissioning, and acceptance
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: E92
Classification of International Standard: 75.180.10
Word Count Estimation: 24,286
Quoted Standard: GB 4914; GB/T 8423; GB/T 17744-2008; GB/T 20660; GB/T 23722; GB/T 29549.1-2013; GB/T 29549.2-2013; SY/T 5244; SY/T 5964; SY/T 10010; SY/T 10025
Regulation (derived from): National Standards Bulletin 2013 No. 9
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the fixed platform module for offshore oil rigs (hereinafter referred to as module rigs) offshore lifting, marine equipment connected to the system installation, system commissioning and acceptance requirements. This section applie

GB/T 29549.3-2013: Specification for offshore modular drilling rigs on fixed platforms -- Part 3: Hook-up, commissioning, and acceptance


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification for offshore modular drillling rigs on fixed platforms Part 3.. Hook-up, commissioning, and acceptance ICS 75.180.10 E92 National Standards of People's Republic of China Fixed offshore oil rig platform module Part 3. Offshore installation, commissioning and acceptance Part 3. Hook-up, commissioningandacceptance Issued on. 2013-06-09 2014-01-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions Offshore Lifting 2 4 Prepare documentation 2 4.1 4.2 job site preparation 2 4.3 lifting operations 2 5 offshore equipment installation and system connection 2 Work content 2 5.1 5.2 Technical Requirements 2 6 3 system debugging 6.1 Basic requirements 3 Preparation prior to commissioning 4 6.2 6.3 Debugging Content 4 6.4 Requirements for commissioning 5 7 Acceptance 10 10 7.1 Site Acceptance 7.2 Acceptance documents 10 Appendix A (informative) module lifting rig, commissioning work safety risk analysis unit 11 Annex B (informative) module rigs offshore installation content 12 Annex C (informative) Offshore rig module connection order and content 14 Annex D (informative) fixed offshore platform module rig inspection reports 16 Annex E (informative) fixed offshore platform module rigs final acceptance documents and records 19 References 20

Foreword

GB/T 29549 "Fixed offshore oil rig platform module" is divided into three parts. --- Part 1. Design; --- Part 2. construction; --- Part 3. Offshore installation, commissioning and acceptance. This is Part 3 GB/T 29549 of. This section drafted in accordance with GB/T 1.1-2009 given rules. Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents. This part of the National Oil Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96) and focal points. This section drafted by. China Oilfield Services Limited, CNOOC Research Institute, Institute of Petroleum Industry Standardization, Baoji Petroleum Machinery Co., Ltd., Nanyang PETRO-MACHINERY (Group) Co., Ltd., China Petrochemical Group Jianghan Petroleum Administration Bureau fourth Machinery Plant. The main drafters of this section. Jiang Wei, Liu Yuan, He Baosheng, Wu Xinsheng, Cai Weiming, Zhengguang Hong car Yonggang, Wang Jianjun, Cao Jing style, Zhang, Liu Aiguo, Liu Jian, Wang group. Fixed offshore oil rig platform module Part 3. Offshore installation, commissioning and acceptance

1 Scope

This section GB/T 29549 requirements for lifting offshore fixed platforms offshore oil rig module (hereinafter referred to as module rigs), and Offshore installation connected to the system, system testing and commissioning requirements. This section applies to offshore drilling rig module installation, commissioning and acceptance.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 4914 offshore oil exploration and development of pollutant emission concentration limits GB/T 8423 oil drilling equipment and specialized vocabulary pipe GB/T 17744-2008 Petroleum and natural gas industries - Drilling and workover equipment GB/T 20660 Fire oil and gas industry offshore production facilities, explosion control, reduction measures - Requirements and guidelines GB/T 23722 crane drivers (operators), slingers qualifications, command staff and assessors requirements GB/T 29549.1-2013 fixed offshore oil rig Platform Module - Part 1. Design GB/T 29549.2-2013 fixed offshore oil rig Platform Module - Part 2. Construction SY/T 5244 drilling fluid circulation manifold SY/T 5964 drilling well control device assembly supporting installation and maintenance SY/T 10010 Non-Classified regional level Ⅰ and Class 1 and Class 2 electrical systems design area of \u200b\u200bfixed and floating offshore oil facilities and Recommended practice for installation SY/T 10025 offshore drilling unit operations before inspection code Offshore Oil Safety Management Regulations (State Administration of Work Safety Order No. 25 December 1, 2009) Fixed offshore platform safety regulations (State Economic and Trade Commission in September 2000) The International Convention for the Safety of Life at Sea (IMO)

3 Terms and Definitions

GB/T 8423, GB/T 29549.1, GB/T 29549.2 defined and the following terms and definitions apply to this document. 3.1 Offshore Lifting hookupandinstalation Each module rig in accordance with the overall design layout and construction requirements for lifting the order and fixed installation process. 3.2 Lifting beam liftingbeam Hoisting crane load balancing tool for the construction work.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 29549.3-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 29549.3-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 29549.3-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 29549.3-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.