GB/T 28807.2-2017 English PDFUS$519.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28807.2-2017: Railway applications -- Compatibility between rolling stock and train detection systems -- Part 2: Compatibility with track circuits Status: Valid
Basic dataStandard ID: GB/T 28807.2-2017 (GB/T28807.2-2017)Description (Translated English): Railway applications -- Compatibility between rolling stock and train detection systems -- Part 2: Compatibility with track circuits Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: S04 Classification of International Standard: 45.060 Word Count Estimation: 26,212 Date of Issue: 2017-09-29 Date of Implementation: 2018-04-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 28807.2-2017: Railway applications -- Compatibility between rolling stock and train detection systems -- Part 2: Compatibility with track circuits---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Railway applications - Compatibility between rolling stock and train detection systems - Part 2. Compatibility with track circuits ICS 45.060 S04 National Standards of People's Republic of China Rail transit rolling stock and train detection system Compatibility - Part 2. Compatibility with track circuits traindetectionsystems-Part 2.Compatibilitywithtrackcircuits 2017-09-29 Posted 2018-04-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms, definitions, symbols and abbreviations 1 3.1 Terms and definitions 1 3.2 Symbol 3 3.3 Abbreviations 4 4 locomotive vehicle interference current limit 4 4.1 Locomotive and rolling stock to determine the current limit 4 4.2 interference current limit in the design of rolling stock 4 4.3 System Definition 4 5 Assessment Method 6 5.1 General 6 5.2 Selected Evaluation Scheme 6 5.3 Locomotive and vehicle interference current limit and margin determination 6 5.4 Compatibility Guidelines 7 6 locomotive and rolling stock interference current limit based on interworking line7 locomotive and vehicle interference measurement 8 7.1 General 8 7.2 Compatibility Test 8 7.3 Test Equipment Requirements (Hardware) 108 Train Interference Analysis and Evaluation Method8.1 Evaluation Methods 11 8.2 on-board interference monitoring requirements 13 8.3 Documentation Requirements 13 Appendix A (Normative) Locomotive and rolling stock disturbance current limit 14 Appendix B (informative) Typical voltage resonance Figure 16 Appendix C (informative) basic data 18ForewordGB/T 28807 "rail traffic rolling stock and train detection system compatibility" is divided into three parts. --- Rail transport rolling stock and train detection system compatibility; (General) --- Part 2. Compatibility with the track circuit; --- Part 3. Compatibility with shaft counter. This section GB/T 28807 Part 2. This section drafted in accordance with GB/T 1.1-2009 given rules. Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents. This part is proposed by the National Railroad Administration. This part of the traction electrical equipment and systems standardization Technical Committee (SAC/TC278) centralized. This section is responsible for the drafting unit. Zhuzhou Times Electric Co., Ltd. car. This section participates in the drafting unit. Beijing Allway Communications Signal Research and Design Institute Group Co., Ltd., Qingdao Sifang Locomotive and Rolling Stock Co., Ltd. Limited company. The main drafters of this section. Wang Qi, Luo Yongsheng, Zhang Zhi Xue, Shi Hongfei, Hu Xueyong, Dai Xiaofeng. Rail transit rolling stock and train detection system Compatibility - Part 2. Compatibility with track circuits1 ScopeGB/T 28807 provisions of this part of the rolling stock of the conducted interference current limit requirements and verification of rolling stock to meet these Method of measurement of limit value. This part of the limit requirements apply only to locomotives and rolling stock supporting the use of track circuits given in this section, the assessment of this section The law can be used to assess the compatibility of rolling stock with other types of track circuits. This section gives the derivation of the disturbance current limit of rolling stock Guidance notes, and provides interference current limit measurement and evaluation methods. Note. This section does not include the basic parameters of the track circuit related to the current limit of the locomotive and vehicle interference current.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 1402 rail transit traction power supply system voltage (GB/T 1402-2010, IEC 60850.2007, MOD) GB/T 21562 rail transport reliability, availability, maintainability and safety specifications and examples (GB/T 21562-2008, IEC 62278.2002, IDT) GB/T 28027 rail transportation power supply system and rolling stock operation matching (GB/T 28027-2011, IEC 62313.2009, MOD) Compatibility of GB/T 28807 railway rolling stock and train testing system (GB/T 28807-2012, IEC 62427. 2007, IDT) GB/T 28808 rail transit communications, signal and processing system control and system protection software (GB/T 28808-2012, IEC 62279.2002, IDT) GB/T 28809 rail transit communications, signal and processing system signal safety-related electronic systems (GB/T 28809- 2012, IEC 62425.2007, IDT) UIC550 bus powered device (Powersupplyinstalationsforpassengerstock) 3 Terms, definitions, symbols and abbreviations 3.1 Terms and definitions GB/T 28807 and defined by the following terms and definitions apply to this document. 3.1.1 Affecting unit influencingunit Locomotive and rolling stock affecting the train inspection system. Note. An impact unit (see Figure 1 for an example) contains various types of linked or connected vehicles, such as single or multi-section trains, single-section vehicles, Multi-section combination (linked) vehicles, up to 16 car single-section or multi-section traction of the entire passenger train. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28807.2-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 28807.2-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28807.2-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28807.2-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |