Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 28799.4-2024 English PDF

US$459.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 28799.4-2024: Polyethylene of raised temperature resistance(PE-RT) piping systems for hot and cold water installations - Part 4: Valves
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 28799.4-2024459 Add to Cart 4 days Polyethylene of raised temperature resistance(PE-RT) piping systems for hot and cold water installations - Part 4: Valves Valid

Similar standards

GB/T 32020   GB/T 32439   GB/T 24456   GB/T 28799.3   GB/T 28799.5   GB/T 28799.2   

Basic data

Standard ID: GB/T 28799.4-2024 (GB/T28799.4-2024)
Description (Translated English): Polyethylene of raised temperature resistance(PE-RT) piping systems for hot and cold water installations - Part 4: Valves
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: G33
Classification of International Standard: 83.140.30
Word Count Estimation: 22,273
Date of Issue: 2024-03-15
Date of Implementation: 2024-10-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 28799.4-2024: Polyethylene of raised temperature resistance(PE-RT) piping systems for hot and cold water installations - Part 4: Valves


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 83.140.30 CCSG33 National Standards of People's Republic of China Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water Part 4.Valves Released on 2024-03-15 2024-10-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and definitions, symbols and abbreviations 2 4 Materials 2 5 Model compilation 3 6 Requirement 3 7 System Suitability 6 8 Test methods 6 9 Inspection Rules 10 10 Marking, packaging, transportation and storage 12 Appendix A (Normative) Opening and closing torque test method 13 Appendix B (Normative) Tensile test method 14 Appendix C (Normative) Impact resistance test method 16

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is part 4 of GB/T 28799 "Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water". GB/T 28799 has been The following parts were published. --- Part 1.General; --- Part 2.Pipes; --- Part 3.Pipe fittings; --- Part 4.Valves; --- Part 5.System suitability. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by China Light Industry Federation. This document is under the jurisdiction of the National Technical Committee for Standardization of Plastic Products (SAC/TC48). This document was drafted by. China Urban Construction Research Institute Co., Ltd., Beijing Songtiancheng Technology Co., Ltd., Beijing Construction Engineering Quality The Fourth Testing Institute Co., Ltd., Asia Plastics Products Co., Ltd., Hanwha Total Energy Chemicals (Shanghai) Co., Ltd., Jilin Songjiang Plastics Pipeline Equipment Co., Ltd., Ningbo Yuhua Industrial Co., Ltd., Gongyuan Co., Ltd., China Municipal Engineering North China Design Research General Institute Co., Ltd., Xinjiang Liansu Technology Development Co., Ltd., Zhejiang Zhongcai Pipeline Technology Co., Ltd., Weihai Shifeng Plastic Co., Ltd., Harbin Jinling Technology Co., Ltd., Jilin Province New Pipe Industry Co., Ltd., Zhengzhou Thermal Power Group Co., Ltd., Weihai Tiangang Instrument Co., Ltd. Co., Ltd. and Haotian Energy Saving Equipment Co., Ltd. The main drafters of this document are. Yang Jian, Bian Xianhua, Bai Dongjun, Li Yu, Zhao Qihui, Zhu Zhaolin, Chen Jianqiang, Huang Jian, Wang Huai, Zhang Guoping, Wang Baiti, Yu Xiaojiao, Song Jinling, He Ke, Li Zhengshuai, Jiang Xiaofeng, Zheng Zhongsheng.

Introduction

The content of this document is aimed at the needs of plastic pipe systems for water supply and heating in my country, combined with the plastics currently used in plastic pipe systems. Plastic valves, especially those used in hot water pipe systems, are limited by the strength of plastics. At present, only ball valves have application cases in terms of structure, so the content of this document only involves ball valves. Other structural valves are subject to technical development. After it is mature and has certain engineering use experience, it will be supplemented and improved in a timely manner. GB/T 28799 "Heat-resistant Polyethylene (PE-RT) Pipe Systems for Hot and Cold Water" is based on the actual production and application of plastic pipe products in my country. The grass is planned to consist of the following five parts. --- Part 1.General. The purpose is to establish the terms, definitions, Symbols and abbreviations, levels of conditions of use, material requirements. --- Part 2.Pipes. The purpose is to establish materials, product classification, Selection, requirements, system suitability, test methods, inspection rules, marking, packaging, transportation and storage of pipe series S. --- Part 3.Pipe fittings. The purpose is to establish materials, product classification, Requirements, system suitability, test methods, inspection rules, marking, packaging, transportation and storage. --- Part 4.Valves. The purpose is to establish the materials, model compilation, Requirements, system suitability, test methods, inspection rules, marking, packaging, transportation and storage. --- Part 5.System suitability. The purpose is to establish the suitability of heat-resistant polyethylene (PE-RT) piping systems for hot and cold water. Requirements and test methods. The use pressure of the valves specified in this document at different temperatures shall be selected with reference to the use conditions of the pipes, fittings and connection systems. Use, such as S level. The performance requirements and test verification specified in this document are based on ball valves produced from heat-resistant polyethylene (PE-RTⅡ) materials. Polyethylene (PE-RTⅠ) materials need further verification of relevant performance and requirements, considering compatibility and system applicability. Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water Part 4.Valves

1 Scope

This document specifies the materials, classifications, models, specifications, dimensions, deviations and The requirements for physical and mechanical properties, inspection rules, marking, packaging, transportation and storage are described, and the corresponding test methods are described. This document is applicable to the manufacture and inspection of ball valves made of PE-RTⅡ material with a nominal size not exceeding 400mm. This document, together with other parts of GB/T 28799, applies to hot and cold water piping systems, including domestic hot and cold water piping systems for civil and industrial buildings. Water, drinking water and heating systems, hot spring water piping systems and central heating secondary pipe network systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2828.1 Sampling procedures for inspection by attributes Part 1.Sampling plans for batch inspection based on the acceptance quality limit (AQL) GB/T 2918 Standard environment for conditioning and testing of plastic specimens GB/T 3682.1 Plastics Thermoplastics - Determination of melt mass flow rate (MFR) and melt volume flow rate (MVR) Part 1.Standard methods GB/T 8806 Determination of dimensions of plastic parts for plastic piping systems GB/T 9345.1 Determination of ash content in plastics Part 1.General method GB/T 12670-2008 Polypropylene (PP) resin GB/T 17219 Safety evaluation standard for drinking water transmission and distribution equipment and protective materials GB/T 18251 Determination of the dispersion of pigments or carbon black in polyolefin pipes, fittings and compounds GB/T 19278 General terms and definitions for thermoplastic pipes, fittings and valves GB/T 19466.6 Plastics Differential Scanning Calorimetry (DSC) Part 6.Oxidation Induction Time (OIT) and Oxidation Induction Isotherm Determination of conductivity temperature (dynamic OIT) GB/T 19993 Thermal cycle test method for thermoplastic piping systems for hot and cold water - pipe and fitting combination systems GB/T 21300 Determination of opacity of plastic pipes and fittings GB/T 21465 Valve Terminology GB/T 22271.2 Plastics Polyoxymethylene (POM) molding and extrusion materials Part 2.Sample preparation and property determination GB/T 22271.3 Plastics Polyoxymethylene (POM) molding and extrusion materials Part 3.General product requirements GB/T 27572-2011 Rubber seals Specification for pipe joint sealing ring materials for 110℃ hot water supply pipes GB/T 27726 Thermoplastic valve pressure test methods and requirements GB/T 28799.1-2020 Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water Part 1.General GB/T 28799.2 Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water Part 2.Pipes GB/T 28799.3 Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water Part 3.Pipe fittings GB/T 28799.5 Heat-resistant polyethylene (PE-RT) piping systems for hot and cold water Part 5.System suitability GB/T 37842 Thermoplastic Ball Valve
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 28799.4-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 28799.4-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 28799.4-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 28799.4-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.