Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 26471-2023 English PDF

US$389.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 26471-2023: Tower crane - Rules of installation, disassembly and climbing
Status: Valid

GB/T 26471: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 26471-2023389 Add to Cart 4 days Tower crane - Rules of installation, disassembly and climbing Valid
GB/T 26471-2011359 Add to Cart 3 days Tower crane -- The rules of installation and disassembly Obsolete

Similar standards

GB/T 24818.4   GB/T 23724.1   GB/T 24809.2   GB/T 26470   GB/T 26473   

Basic data

Standard ID: GB/T 26471-2023 (GB/T26471-2023)
Description (Translated English): Tower crane - Rules of installation, disassembly and climbing
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: J80
Classification of International Standard: 53.020.20
Word Count Estimation: 20,232
Date of Issue: 2023-03-17
Date of Implementation: 2023-10-01
Older Standard (superseded by this standard): GB/T 26471-2011
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 26471-2023: Tower crane - Rules of installation, disassembly and climbing

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS53:020:20 CCSJ80 National Standards of People's Republic of China Replacing GB/T 26471-2011 Tower crane erection, dismantling and climbing rules Released on 2023-03-17 2023-10-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee

table of contents

Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Installation and dismantling units and personnel 3 5 Basic regulations for installation and dismantling 4 6 Preparations before installation and disassembly6 7 Installation and disassembly of basic erection height 8 8 Climbing operation of external climbing tower crane 9 9 Installation and removal of attachment devices 11 10 Installation and disassembly of internal climbing (external hanging) tower crane 12 11 Commissioning of safety protection devices 13 12 Inspection and acceptance after installation 13 Reference 14 Table 1 Safety distance between tower crane and overhead transmission line5

foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting: This document replaces GB/T 26471-2011 "Rules for Installation and Disassembly of Tower Cranes": Compared with GB/T 26471-2011, except Apart from structural adjustments and editorial changes, the main technical changes are as follows: ---Changed and added some terms and definitions (see Chapter 3, Chapter 3 of the:2011 edition); --- Deleted the term definition of "transition section" (see 3:2 of the:2011 edition); ---Change and increase the requirements for installation and disassembly units and personnel (see Chapter 4, Chapter 4 of the:2011 edition); --- Increased requirements for special programs (see 5:2); ---Changed and added the requirements for installation and dismantling safety distance and group tower operation installation safety distance (see 5:4, 5:5, 5:4~5:6 of the:2011 edition); --- Added requirements for installation site selection (see 5:6); --- Increased post-installation self-test and debugging requirements (see 5:7:1); --- Added the requirements for inspection and acceptance after installation self-inspection (see 5:7:2); --- Added requirements for windshields, warning signs and components (see 5:8); --- Added the requirements for technical disclosure before installation and disassembly (see 6:1:4); --- Increased the requirements for staffing on-site installation and dismantling (see 6:2); --- Changed the inspection requirements before installation (see 6:4:1, 6:3:1 of the:2011 edition); ---Changed the requirements on the foundation and attached buildings (structures) (see 6:5, 6:4 of the:2011 edition); --- Increased the verticality requirements of the tower body in the no-load state (see 7:4); --- Changed the requirements for high-strength bolts (see 7:6, 7:5 of the:2011 edition); --- Added the requirements for the installation of the jib tie rod (see 7:12); --- Added the requirements for the total installation height of the internal climbing (external hanging) tower crane and the installation position of the special frame (see 7:13); --- Added the requirements for commissioning of the working mechanism and wiring of the electrical system after installation (see 7:14, 7:15); --- Added requirements for disassembly process (see 7:16); --- Increased the basic erection height stage inspection and testing requirements (see 7:18); --- Increased the balance requirements for the climbing part of the tower crane (see 8:2:4); --- Increased the requirements on the reduction of knots (see 8:2:7); --- Changed the requirements on the hydraulic system (see 8:3, 8:3 of the:2011 edition); --- Added design and manufacture requirements for non-standard attachment devices (see 9:1:3); --- Increase the design and manufacture requirements for non-standard components of internal climbing (external hanging) tower cranes (see 10:1:1); ---Changed the requirements for dismantling the internal climbing (external hanging) tower crane (see 10:3, 10:3 of the:2011 edition): Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed by China Machinery Industry Federation: This document is under the jurisdiction of the National Hoisting Machinery Standardization Technical Committee (SAC/TC227): This document is drafted by: Shandong Academy of Building Research Co:, Ltd:, Shandong Tianyuan Construction Machinery Co:, Ltd:, Beijing Construction Mechanization Research Institute Co:, Ltd:, Dahan Technology Co:, Ltd:, Shandong Zhongcheng Machinery Leasing Co:, Ltd:, Fushun Yongmao Construction Machinery Co:, Ltd:, Fang Circle Group Co:, Ltd:, Beijing University of Civil Engineering and Architecture, Zhejiang Provincial Construction Engineering Machinery Group Co:, Ltd:, Hubei Jianghan Construction Engineering Machinery Co:, Ltd:, China Construction Strait Construction Development Co:, Ltd:, Beijing Zhuzong Group Co:, Ltd:, Guangdong Construction Machinery Factory Co:, Ltd:, Chengdu Jiuhe Construction Equipment Co:, Ltd:, Beijing Third Construction Engineering Co:, Ltd:, Beijing Boda Jingkai Construction Co:, Ltd:, Jiangsu Zhongjian Dafeng Mechanical Engineering Co:, Ltd: Cheng Co:, Ltd:, Shaanxi Construction Machinery Co:, Ltd:, China Construction Second Engineering Bureau Co:, Ltd:, China Railway Construction Group Co:, Ltd:, Jiangsu Provincial Jinling Construction Engineering Group Co:, Ltd:, China Communications Infrastructure Maintenance Group Co:, Ltd:, and China Construction Education Association: The main drafters of this document: Huang Nan, Wang Qiao, Liang Rongjian, Luo Wenlong, Jin Yixin, Zhao Yuxi, Liu Shuang, Chai Jia, Wu Mingchen, Wang Kaihui, Feng Gongbin, Xia Ting, Wen Chaohui, Zhang Xiaohui, Li Guangda, Xiao Hongtao, Cheng Hua, Wang Jingyu, Xu Guokai, Duan Wenxuan, Zheng Guosui, Wu Yushui, Xu Yangyang, Wang Jun, Liang Chaohui, Xu Yanhua, Wang Lidong, Mao Ruinian, Zhao Jingyun, Sun Qinglin, Ma He, Zhou Lihong, Zhou Bing, Deng Zhiyong, Du Wei, Yang Xianghong, Zhu Lirong, Hu Xuetao, Yan Gang, Xu Yunxin, Li Zhilin, Yin Wenqiang, Chen Jishen, Han Yeqing, Liu Chenghuan, Wei Dong, Sun Yanqiu: This document was first published in:2011, and this is the first revision: Tower crane erection, dismantling and climbing rules

1 Scope

This document specifies the installation, dismantling and climbing (hereinafter referred to as "installation and disassembly") operations of tower cranes (hereinafter referred to as "tower cranes"): Units and personnel, basic regulations for installation and dismantling, preparations before installation and dismantling, installation and dismantling of basic erection heights, climbing operations of external climbing tower cranes, installation and removal of attachment devices Requirements for installation and disassembly, installation and disassembly of internal climbing (external hanging) tower cranes, commissioning of safety protection devices, inspection and acceptance after installation: This document is applicable to the installation and dismantling of assembled upper-slewing tower cranes, and the installation and dismantling of other types of tower cranes shall be carried out by reference: Note: This document gives suggestions and guidance on the management of tower crane installation and dismantling operations, including the responsibilities of the user unit and supplier unit involved in these operations, and relevant personnel: responsibilities and conditions of employment: This document does not apply to the installation and dismantling of self-erecting tower cranes and mobile self-erecting tower cranes:

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document: GB/T 5031-2019 Tower Cranes GB 5144-2006 Safety regulations for tower cranes GB/T 6974:3 Crane Terminology Part 3: Tower Cranes GB/T 23723:3-2010 Safe use of cranes Part 3: Tower cranes GB/T 23724:3-2010 Crane Inspection Part 3: Tower Cranes GB/T 31052:3-2016 Inspection and Maintenance Procedures for Lifting Machinery Part 3: Tower Cranes GB/T 33080-2016 Safety Assessment Procedures for Tower Cranes GB 50169 Specifications for construction and acceptance of grounding devices for electrical installation engineering JB/T 13915 Pre-tightening and anti-loosening of high-strength bolts for tower cranes

3 Terms and Definitions

The following terms and definitions defined in GB/T 6974:3 and GB/T 5031-2019 apply to this document: 3:1 Basic erection height basicsittingheight Before the tower crane is installed and climbed for the first time, from the top surface of the foundation that supports the tower body of the tower crane or the top surface of the track of the walking tower crane to the hinge at the root of the boom The minimum height of the point: 3:2 Cast-inbase cast-inbase In-situ poured reinforced concrete foundation for fixing or installing tower crane underframe, feet or embedded joints: 3:3 The specially designed concrete prefabricated parts are assembled into a whole through the assembled connecting cable, which is used to transmit the load of the tower crane to the foundation of the foundation:
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 26471-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 26471-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 26471-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 26471-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 26471-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 26471-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.