GB/T 25926-2010 English PDFUS$399.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 25926-2010: Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams Status: Valid
Basic dataStandard ID: GB/T 25926-2010 (GB/T25926-2010)Description (Translated English): Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N10 Classification of International Standard: 25.040.40 Word Count Estimation: 17,116 Date of Issue: 1/14/2011 Date of Implementation: 5/1/2011 Quoted Standard: GB/T 2625-1981; GB/T 4728.1; GB/T 4728.2; GB/T 4728.3; GB/T 4728.4; GB/T 4728.5; GB/T 4728.6; GB/T 4728.7; GB/T 4728.8; GB/T 4728.9; GB/T 4728.10; GB/T 4728.11; GB/T 4728.12; GB/T 4728.13; GB 4884; GB/T 25927-2010 Regulation (derived from): Announcement of Newly Approved National Standards No. 2 of 2011 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This Standard specifies the industrial process mounted on the dashboard of measuring and control instruments, electrical components and instrumentation accessories (abbreviated project) wiring diagram representation takeover, drawing rules and mapping methods. This Standard is applicable to industrial automation and dashboard wiring diagram plotted to take over. Wiring diagram plotted to take over the console (cabinet) can also refer to adoption. GB/T 25926-2010: Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Industrial-process measurement and control instrument panels. Methods of drawing the wiring and piping diagrams ICS 25.040.40 N10 National Standards of People's Republic of China Industrial automation dashboard wiring diagram takeover Drawing method Issued on. 2011-01-14 2011-05-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThe standard proposed by China Machinery Industry Federation. This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized. This standard is drafted by. Shanghai Institute of Industrial Automation Instrumentation. Participated in the drafting of this standard. Shanghai Automation Instrumentation System Inspection and Testing Institute. The main drafters of this standard. Li Minghua, Cai Zhi Wen, Xiao practice. This standard is the first release. Industrial automation dashboard wiring diagram takeover Rendering1 ScopeThis standard specifies the industrial process is mounted on the dashboard of measurement and control instruments, electrical components and instrumentation attachments (referred to item) wiring, Representation takeover graph, drawing rules and graphical method. This standard applies to industrial automation instrument panel wiring diagram plotted to take over. Wiring diagram plotted to take over the control panel (cabinet) can also refer to adopt.2 Normative referencesThe following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 2625-1981 detection and control process flow chart - Symbols and letter codes GB/T 4728 (all parts), Graphical symbols for electrical diagrams (IEC 60617database, IDT) GB 4884 insulated wire markers (GB 4884-1985, eqv IEC 60391. 1972) Drawing method GB/T 25927-2010 Industrial automation dashboard layout of the disk3 Terms and DefinitionsThe following terms and definitions apply to this standard. 3.1 Project item For components, equipment, devices, and other elements on the diagram with a graphical notation. 3.2 Project Code itemcode A special code for logos, charts and project on the device. 3.3 Location code positioncode Project components, devices, systems of the actual position of the code. 3.4 Terminal designation terminalcode Used with an external circuit electrically connected to the conductor code. 3.5 Wear fittings Code conduitjointcode Used with external piping in piping connected to the pipe joint code.4 Representation4.1 Wiring, flattened face takeover Wiring, flattened face takeover is in accordance with the structural features of the instrument panel and wiring, take over the process adopted to the dashboard viewing direction, take the main ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 25926-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 25926-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 25926-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 25926-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |