GB/T 24338.2-2018 English PDFUS$519.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 24338.2-2018: Railway applications -- Electromagnetic compatibility -- Part 2: Emission of the whole railway system to the outside world Status: Valid GB/T 24338.2: Historical versions
Basic dataStandard ID: GB/T 24338.2-2018 (GB/T24338.2-2018)Description (Translated English): Railway applications -- Electromagnetic compatibility -- Part 2: Emission of the whole railway system to the outside world Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: S35 Classification of International Standard: 29.280 Word Count Estimation: 26,255 Date of Issue: 2018-06-07 Date of Implementation: 2019-01-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 24338.2-2018: Railway applications -- Electromagnetic compatibility -- Part 2: Emission of the whole railway system to the outside world---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Railway applications--Electromagnetic compatibility--Part 2. Emission of the whole railway system to the outside world ICS 29.280 S35 National Standards of People's Republic of China Replace GB/T 24338.2-2011 Rail transit electromagnetic compatibility Part 2. The entire orbital system emits to the outside world (IEC 62236-2.2008, MOD) Published on.2018-06-07 2019-01-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 system emission limit 2 5 Measurement method for system launch and traction substation transmission when locomotives are running 3 Appendix A (informative) This section compares with the chapter number of IEC 62236-2.2008 9 Appendix B (informative) Background of measurement methods 10 Appendix C (informative) Electric and magnetic fields generated by the fundamental wave 13 Appendix D (informative) Low Frequency Launch 14 Appendix E (informative) Conversion between peak and quasi-peak detection results of two measurement methods 16 Reference 18ForewordGB/T 24338 "Tracking Electromagnetic Compatibility" consists of the following parts. --- Part 1. General; --- Part 2. The launch of the entire track system to the outside world; --- Part 3-1. Locomotive trains and complete vehicles; ---Part 3-2. Locomotive and rolling stock equipment; --- Part 4. Emission and immunity of signal and communication equipment; --- Part 5. Emission and immunity of ground-based equipment and systems. This part is the second part of GB/T 24338. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part replaces GB/T 24338.2-2011 "Electromagnetic compatibility of rail transit Part 2. The entire rail system is sent to the outside world Shooting, compared with GB/T 24338.2-2011, the main technical changes are as follows. --- Removed the description of the upper and lower areas of the line in Chapter 1, the entire rail transit system has been covered and the text is not specifically Propose the requirements for the upper and lower areas; --- Removed the terms "external interface" and "railway transmission line", not applied in the text (see.2011, 3.3, 3.5); --- Added normative reference document GB/T 6113.104 (see Chapter 2); --- Revised the limits of the 9kHz ~ 0.15MHz range of emission requirements and related test content, changed to informative Appendix D, considering Poor repeatability, not as a limit requirement, the “emitter limit” in the corresponding figure is changed to “emission value” (see Chapter 4, 5.1.1, 5.1.1.3, 5.1.1.4, Figure 3, B.2); --- Deleted Note 3 of 4.1, the detection method has been clearly identified as peak detection; (see 4.1 of.2011 edition); --- Removed the requirement for overhead contact network launch, and the rail transit system launch measurement covered the launch of the overhead contact network (see.2011) Version 4.3); --- Increased the uncertainty requirements of measuring instruments (see 5.1.1.2); --- Increased combination antenna type (see 5.1.1.3); ---Modified the measuring device for the receiver, computer, graphic recorder and printer in Figure 3~5, because the measuring device now There are different types and multiple functions (see 5.1.1.6); --- Increased requirements for measuring sites to facilitate site selection (see 5.1.1.6); --- Revised the environmental noise requirements to make the measurement results more credible (see 5.1.1.7,.2011 edition 5.1.12); --- Increased fixed frequency method to ensure accurate measurement at higher train speeds (see 5.2.1 and 5.2.2); --- Increased scan rate requirements to adapt the method to measurements at different train speeds (see Table 2); --- Revised the normative Appendix A as an informative appendix (see Appendix A, Appendix A of the.2011 edition). This section uses the redrafting method to modify the use of IEC 62236-2.2008 "railway electromagnetic compatibility part 2. the entire track system The launch of the outside world. This section is structurally adjusted compared to IEC 62236-2.2008. Appendix A gives this section and IEC 62236-2.2008 The chapter number comparison list. There are technical differences between this part and IEC 62236-2.2008, and the terms involved in these differences have been passed on the outside margins. The vertical single line (|) of the position is marked. The specific technical differences and their causes are as follows. --- Revised the scope of application of the standard to rationalize system launch requirements; ---About the normative reference documents, this part has made technical adjustments to adapt to China's technical conditions, adjustments The situation is reflected in Chapter 2, “Regulatory References”, and the specific adjustments are as follows. ● Replace IEC 60050-161 with GB/T 4365 equivalent to the international standard; ● Replace CISPR16-1-1 with GB/T 6113.101 equivalent to the international standard; ● Replace IEC 62236-1 with GB/T 24338.1 modified to adopt international standards; ● Removed IEC 62236-3-1; ● CISPR22 has been deleted; ● Added reference to GB/T 6113.104. --- Revised the requirements of the emission measurement method to improve the test enforceability (see Chapter 1); --- Removed the terms "external interface" and "railway transmission line", not applied in the text (see international standards 3.3 and 3.5); --- Revised the limits of the 9kHz ~ 0.15MHz range of emission requirements and related test content, changed to informative Appendix D, considering Poor repeatability, not as a limit requirement, the “emitter limit” in the corresponding figure is changed to “emission value” to meet the test repeatability requirement. (See Chapter 4, 5.1.1, 5.1.1.3, 5.1.1.4, Figure 3, B.2); --- Increased the uncertainty requirements of the measuring instrument to ensure the validity of the measured data (see 5.1.1.2); --- Increased the type of combined antenna, increasing the range of antenna selection under the premise of meeting the technical requirements (see 5.1.1.3); ---Modified the measuring device for the receiver, computer, graphic recorder and printer in Figure 3~5, because the measuring device now There are different types and multiple functions (see 5.1.1.6); --- Increased requirements for measuring sites to facilitate site selection (see 5.1.1.6); --- Revised the environmental noise requirements to make the measurement results more reliable (see 5.1.1.7); --- Increase the requirements of the three-track receiver measuring point to standardize the three-track flow-through line measurement method (see 5.1.2); --- Added a fixed frequency scanning method to optimize the measurement method according to the running speed of the rolling stock (see 5.2.1 and 5.2.2); --- Increased scan rate requirements to adapt the method to measurements at different train speeds (see 5.2.1); --- Modified the frequency sweep and gave an operational measurement method (see 5.2.3); --- Revised the normative Appendix A for the informative Appendix A, and revised it to the chapter terms and conditions, the original normative content moved into 4.2 and Chapter 5 to simplify the standard structure (see Appendix A). This section also made the following editorial changes. --- Revised the description of the measurement points in Chapter 1, and moved to 4.1 and 4.2 respectively; --- Removed the description of the measured distance of the traction substation in Chapter 1, 4.2 has more detailed provisions; --- Deleted the description of the measurement assumptions and the correspondence of the limits in Chapter 1, which are not in the scope of Chapter 1, and the text is also relevant. content; --- Removed the description of the upper and lower areas of the line in Chapter 1, the entire rail transit system has been covered and the text is not specifically Propose the requirements for the upper and lower areas; --- Removed 4.1 non-electrical line limit description, moved into the C limit curve description in Figure 1; --- Removed 4.1 limits for urban rolling stock, and repeated with the C limit curve in Figure 1; ---Modified the position of Figure 1~5; --- Deleted Figure B.1; ---Modified the legend of Figure 1; --- Revised IEC 62236-2.2008 informative Appendix B; --- Added informative Appendix D to explain the emission below 0.15MHz; --- Added the informational Appendix E, giving the measurement results conversion reference method for peak detection and quasi-peak detection; --- Added reference EN50121-2.2015. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part is proposed by the National Railway Administration. This part is under the jurisdiction of the National Traction Electrical Equipment and Systems Standardization Technical Committee (SAC/TC278). This section was drafted. Communication Signal Research Institute of China Railway Science Research Institute, Zhuzhou Zhongche Times Electric Co., Ltd., China Railway Pass Signal Signal Survey Design (Beijing) Co., Ltd., Beijing Jiaotong University, China Railway Fourth Survey and Design Institute Group Co., Ltd., CRRC Qingdao Sifang Machine Vehicle and Vehicle Co., Ltd., China Railway Electrification Survey and Design Institute Co., Ltd. The main drafters of this section. Zhang Chen, Cai Wanyin, Fan Yucheng, Chang Yuanyuan, Lu Gang, Zhang Yuming, Xiao Shi, Liu Aihua. The previous versions of the standards replaced by this section are. ---GB/T 24338.2-2011. Rail transit electromagnetic compatibility Part 2. The entire orbital system emits to the outside world1 ScopeThis part of GB/T 24338 specifies the entire orbital system (including urban rail transit system) to the outside world (referred to as "system issued" Limits and methods of measurement. This section applies to the entire rail system but does not include the entire underground system and launches a rail system that does not affect the ground. Note. For underground track systems where the launch does not affect the ground, it is not necessary to measure the launch of the track system to the outside world. The specific provisions of this section are used in conjunction with the general provisions of GB/T 24338.1.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 4365 Electrotechnical terminology electromagnetic compatibility [GB/T 4365-2003, IEC 60050 (161)..1990, IDT] GB/T 6113.101 Radio disturbance and immunity measuring equipment and measuring methods - Part 1-1. Radio disturbance and immunity Measuring equipment measuring equipment (GB/T 6113.101-2016, CISPR16-1-1..2010, IDT) GB/T 6113.104 Radio disturbance and immunity measurement equipment and methods of measurement - Part 1-4. Radio disturbance and immunity Antenna and test site for measuring radiation disturbance of measuring equipment (GB/T 6113.104-2016, CISPR16-1-4..2012, IDT) GB/T 24338.1 Electromagnetic compatibility of rail transit Part 1. General (GB/T 24338.1-2018, IEC 62236-1. 2008, MOD)3 Terms and definitionsThe following terms and definitions as defined in GB/T 4365 apply to this document. 3.1 Equipment apparatus An electrical or electronic product with inherent functions installed in the track system. 3.2 Environmental environment Peripheral objects and locations that may affect system behavior and/or may be affected by the system. 3.3 Traction substation railwaysubstation The primary voltage conversion (including frequency conversion in some cases) in the track system is the main voltage and frequency required for the catenary facility. ...... |