GB/T 2315-2017 English PDFUS$199.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 2315-2017: Specified failure load series and coupling dimensions for electric power fittings Status: Valid GB/T 2315: Historical versions
Basic dataStandard ID: GB/T 2315-2017 (GB/T2315-2017)Description (Translated English): Specified failure load series and coupling dimensions for electric power fittings Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K51 Classification of International Standard: 29.240.20 Word Count Estimation: 10,190 Date of Issue: 2017-12-29 Date of Implementation: 2018-07-01 Older Standard (superseded by this standard): GB/T 2315-2008 Regulation (derived from): National Standards Bulletin 2017 No. 32 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 2315-2017: Specified failure load series and coupling dimensions for electric power fittings---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Specified failure load series and coupling dimensions for electric power fittings ICS 29.240.20 K51 National Standards of People's Republic of China Replacing GB/T 2315-2008 Electrical fittings Nominal damage load series and connection type size 2017-12-29 Posted 2018-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 nominal damage load series 1 5 connection type 2 6 test method 4 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces GB/T 2315-2008 "power fittings nominal breaking load series and connection type size", and GB/T 2315- 2008 compared to the main technical changes are as follows. --- Added "Groove connection" "ring connection" "ball and socket connection" definition (see 3.2 ~ 3.4); --- The nominal damage load increased from 13 levels to 18 levels, and lists the nominal damage load corresponding to the mark and so on (See Chapter 4, Chapter 4 of the.2008 edition); --- Increasing the size of the groove connection size, according to the new markings listed bolt aperture requirements (see 5.1.1,.2008 edition 5.1.1); --- The tensile strength of the material marked as 55 and above shall be changed from "≥500MPa" to "≥650MPa" (see 5.1.1,.2008 edition 5.1.1); --- Groove-connected bolts should be consistent with the standard from "GB/T 3098.1" to "DL/T 764" (see 5.2.1,.2008 edition 5.1.2); --- Added the requirement of "GQ" mark after "640kN and above nominal breaking load fittings" (see 5.1.3, 5.2.2 and 5.3.3); --- Increasing the groove connection, ring connection size deviation requirements (see 5.1.4,5.2.3); --- Increased the size of the ring connection range, according to the new label lists the ring diameter and other requirements (see 5.2.1,.2008 version 5.2.1); --- Modify the standard of ball joint connection size from "GB/T 4056" to "GB/T 4056 and DL/T 1579" (see 5.3.2, 2008 edition of 5.3.1). This standard proposed by the China Electricity Council. This standard by the National Standardization Technical Committee overhead lines (SAC/TC202) centralized. This standard is drafted by China Electric Power Research Institute. Participated in the drafting of this standard.China Power Engineering Consultants Group South China Electric Power Design Institute Co., Ltd., China National Energy Construction Group Nanjing Line Road Equipment Co., Ltd., Siping Line Equipment Factory, Chengdu Power Plant, Jiangsu Jiekai Power Equipment Co., Ltd., Liaoning Jinxing power fittings Technology Co., Ltd., Yonggu Group Co., Ltd., Xi'an Chuangyuan Electric Power Co., Ltd. The main drafters of this standard. Wang Jingchao, Liu Shengchun, Zhao Quanjiang, Chen Ning, Wu Guohong, Xiong Wei, Sun Tao, Xu Youyan, Li Baoqiang, Secretary Jia Jun, Dong Yuming, Niu Haijun, Zheng Chao, Wang Wei, Wang Baodong, Zhang Jun. This standard replaces the standards previously issued version. --- GB 2315-1980, GB 2315-1985, GB/T 2315-2000, GB/T 2315-2008. Electrical fittings Nominal damage load series and connection type size1 ScopeThis standard specifies the power fittings nominal sabotage load series and groove, ring and ball socket connection size. This standard applies to overhead power line power fittings (hereinafter referred to as fittings).2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2314 electrical fittings general technical conditions GB/T 2317.1 Test methods for electrical fittings - Part 1. Mechanical tests GB/T 4056 insulator string ball socket connection size DL/T 764 power fittings with pin hole hexagon head bolts DL/T 1579 rod suspension composite insulator end fittings technical specifications3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Nominal damage load specifiedfailiureload Specified does not allow the occurrence of mechanical damage to the minimum load. 3.2 Groove connection clevisandtonguecouping By the veneer, slot and connecting pins and other connections. 3.3 Ring connection ringandringcoupling A ring and ring connection. 3.4 Ball and socket connection balandsocketcoupling Foot ball and hat made of the connection.4 nominal damage load seriesNominal damage load series is divided into 18 levels, the marking, bolt diameter and tensile strength of materials in Table 1. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 2315-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 2315-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 2315-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 2315-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 2315-2017?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 2315-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |