Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 21745-2008 English PDF

US$1219.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 21745-2008: Ration of workers for manufacturing rail traffic engineering components
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 21745-20081219 Add to Cart 8 days Ration of workers for manufacturing rail traffic engineering components Valid

Similar standards

GB 146.2   TB/T 2489   GB/T 21562.3   GB/T 21744   

Basic data

Standard ID: GB/T 21745-2008 (GB/T21745-2008)
Description (Translated English): Ration of workers for manufacturing rail traffic engineering components
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: S02
Classification of International Standard: 03.100.30
Word Count Estimation: 55,585
Date of Issue: 2008-05-05
Date of Implementation: 2008-07-01
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the various rail traffic engineering steel bridges, processing, manufacturing, installation, straddle-type steel bearings, straddle-type joint turnout, various turnout processing, -speed maglev track beam functions, low-speed maglev rail labor quota row of manufacture, capacity and job content. This standard applies to all kinds of steel rail transit project, turnout product manufacturing and other projects in the labor management.

GB/T 21745-2008: Ration of workers for manufacturing rail traffic engineering components

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Ration of workers for manufacturing rail traffic engineering components ICS 03.100.30 S02 National Standards of People's Republic of China Rail engineering components manufacturing Work Quota Posted 2008-05-05 2008-07-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ Introduction Ⅱ 1 Scope 1 2 rail traffic engineering component manufacturing Work Quota 1 2.1 parts processing component product 1 2.2 component manufacturing, installation 13 3 Rail Transit Project straddle Pedestal 26 3.1 component manufacturing 26 3.2 Steel Manufacturing 27 4 Light Rail Transit Project straddle Joint Turnouts 29 4.1 component manufacturing 29 4.2 Machining 31 4.3 Turnout assembly 32 4.4 installation site 32 5 Rail Transit Project Turnout manufacture 33 5.1 parts processing rail 33 5.2 Frog high manganese steel manufacturing, processing 40 5.3 Turnout coupling of processing 41 6-speed maglev rail project features 44 beam 6.1 component manufacturing 44 6.2 overall machining 46 6.3 Painting 46 6.4 track beam machining 46 7 Rail Transit Project low speed maglev track panel 47 7.1 component manufacturing 47 7.2 Machining 48 7.3 overall assembly, painting, engraving mark 48 7.4 installation site 49 Appendix A (normative) the relevant provisions of 50

Foreword

Rail Transit Project Work Quota series of standards from the "Urban Rail Transit light rail project Work Quota", "Urban Rail Transit to Under Railway Engineering Work Quota "," Urban Rail Transit Project Work Quota communication signal "," Urban Rail Transit Traction Power Supply Project Work Quota "," large-scale rail transportation equipment manufacturing integrated engineering labor quota "," rail transit engineering components manufacturing Work Quota " And other standard components. "Rail traffic engineering component manufacturing Work Quota" is one of Work Quota series standard rail transit project. Appendix A of this standard is a normative appendix. This standard was proposed by the Ministry of Labor and Social Security. This standard by the National Standardization Technical Committee on Labor and personnel quotas. This standard by the National Standardization Technical Committee work and personnel quotas railway engineering work and personnel quotas technical committee responsible for the interpretation. This standard was drafted. China Railway Group Limited. The main drafters of this standard. Pangde Jing, Wang Shucheng, Yanfeng Xi, full Xiang Fan, Liu, on behalf of the good order, Zhou Xuemin, Zhang Shaotong, Xu Xiuwen, Summer peace.

Introduction

The development of standards for the construction and production guide and regulate rail traffic engineering, strengthen labor administration and enterprises to rationally allocate labor system Plans to provide the main basis for a given job; while budgetary estimate quota Jixietaiban quotas and other economic and financial fixed labor costs for the rail transit project Management standard. This standard is in accordance with "advanced, rational, scientific, standardized" principle and rail transport engineering components manufacturing processing steps, briefly each station Sequence (Post) content of the work, practices; the provisions of the respective steps (positions) labor quota, quota, mechanical (equipment) conditions, employing technology Energy requirements and the adjustment factor standard. Rail engineering components manufacturing Work Quota

1 Scope

This standard specifies the various rail projects in steel bridges, processing, manufacturing, installation, Pedestal straddle, straddle articulated Turnout, turnout and processing all kinds of high-speed maglev rail beam functional parts, labor quota low speed maglev track panel manufacturing capacity and job content. This standard applies to all kinds of steel rail transit project, turnout products manufacturing and other projects in labor management.

2 rail traffic engineering component manufacturing Work Quota

2.1 parts processing component product 2.1.1 plate pretreatment a) Work. Unit with steel, finisher, remove oxide, spray primer, drying, stacking. b) man-days fixed in Table 1. c) Based on the above work content corresponding configuration in accordance with professional grade technical staff of 11 people. Table 1 plate pretreatment units of man-days per tonne Flat rolled steel project Steel rust Machinery painting Quota 0.0417 0.0417 0.0417 2.1.2 for sample a) Work. handmade-like rod model. b) fixed working hours are shown in Table 2. Staff c) According to the above steps to configure the appropriate level of expertise in line with a total of 2 people. Table 2 as the sample in minutes per tonne Handmade items like rods, model 10.8 Quota Note. The table handmade sample rods, model ton tonnage means the product. 2.1.3 crossed a) Work. according to process requirements for steel and steel scribe. b) fixed working hours are shown in Table 3. c) According to the above steps to configure the appropriate level of compliance with professional and technical staff of six people. Table 3 dash in minutes each project Plate width/mm 1,002,004,006,009,001,200 1500 1800 Plate length / mm 100 0.500 1.00 2.00 3.00 4.00 5.00 5.50 6.00 300 1.00 2.00 2.50 3.50 5.00 6.00 7.00 8.00 600 2.00 2.50 3.00 4.00 5.50 6.50 8.00 9.00 1000 2.50 3.00 3.50 4.50 6.00 7.00 8.50 10.0
......
Image