GB/T 20257.1-2017 English PDFGB/T 20257.1: Historical versions
Basic dataStandard ID: GB/T 20257.1-2017 (GB/T20257.1-2017)Description (Translated English): Cartographic symbols for national fundamental scale maps -- Part 1: Specifications for cartographic symbols 1��500 1��1 000 and 1��2 000 topographic maps Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: A79 Classification of International Standard: 01.080.30 Word Count Estimation: 130,160 Date of Issue: 2017-10-14 Date of Implementation: 2018-05-01 Older Standard (superseded by this standard): GB/T 20257.1-2007 Regulation (derived from): National Standard Announcement 2017 No. 26 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 20257.1-2017: Cartographic symbols for national fundamental scale maps -- Part 1: Specifications for cartographic symbols 1∶500 1∶1 000 and 1∶2 000 topographic maps---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. (National Basic Scale Map Schema Part 1. 1. 500 1. 1 000 1. 2 000 Topographic Map) ICS 01.080.30 A79 National Standards of People's Republic of China Replace GB/T 20257.1-2007 National basic scale map schema Part 1. 1.500 1.1000 1.2000 Topographic map Part 1.Specificationsforcartographicsymbols 1.500 1.1000 Released on.2017-10-14 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration issued ContentForeword III 1 Scope 1 2 Normative references 1 3 General Provision 1 3.1 Classification of symbols 1 3.2 Symbol size 1 3.3 Positioning of symbols 1 3.4 Symbol Configuration 2 3.5 Symbol Usage and Requirements 2 3.6 Topographic map framing and contour finishing 3 3.7 Topographic map color 3 4 symbols and notes 4 4.1 Positioning Basics 4 4.2 Water System 6 4.3 Residential Areas and Facilities 22 4.4 Transportation 52 4.5 Pipeline 76 4.6 Realm 80 4.7 Landform 82 4.8 Vegetation and soil quality 92 4.9 Note 100 Appendix A (Normative Appendix) Description Notes Notes Table 108 Appendix B (informative) Example 111 Appendix C (Normative Appendix) Figure Finishing Style 117 Index 119ForewordGB/T 20257 "National Basic Scale Map" is divided into four parts. --- Part 1. 1.500 1.1000 1.2000 topographic map; --- Part 2. 1.5000 1.10000 topographic map; --- Part 3. 1.25000 1.50000 1.100000 topographic map; --- Part 4. 1.250000 1.500000 1.1000000 topographic map. This part is the first part of GB/T 20257. This part replaces GB/T 20257.1-2007 "National Basic Scale Map Drawing Part 1. 1.500 1.1000 1.2000 topographic map. The main changes in this section compared with GB/T 20257.1-2007 are as follows. --- Added "normative reference documents", citing GB/T 13989 "National Basic Scale Topographic Maps and Numbering"; --- Modify the symbol category "Measurement Control Point" to "Location Basics"; --- Modify the symbolic name "swamp" to "swamp, wetland", "Ming Reef" is modified to "island, water island" not to scale, "telecom "Box" "Telecom maintenance well hole" "Telecom Bureau" was revised to "communication transfer box" "communication maintenance well hole" "communication business hall", "open-air goods" The "stack" was changed to "open-air warehouse, material field", "main road, secondary road, branch road" was changed to "main road, secondary road, branch line", etc.; --- Increased satellite positioning continuous operation site, channel above the ground, bush grass beach, reed beach, salt shoal beach, shoal, dark beach, jetty, other Type breakwaters, podiums, art buildings, tailings ponds, solar panels, construction areas, mantles (vegetables), dedicated oxygen supply points, sea rescue Station, lifeboat station, bunker, fitness, recreation facilities, observation deck, postbox, large mailbox, rooftop facilities, newsstand, kiosk, ticket sales Pavilion, automatic teller machine, paper burning furnace, car inspection platform, territorial sea point pointing monument, sun buddha, sound insulation wall (sound barrier), windproof wall (wind shield) Wall), car ramp in front of building, barrier-free access, outdoor escalator, outdoor elevator, wall, art landscape light, traffic patrol Taiwan, electronic screen, street garden landscape, elevated railway, high-speed railway, village road, sidewalk, bus stop (with platform) ), parking lot, bicycle rental point, wildlife passage, heat sink, road mirror, door sign, electronic eye (monitoring Shi), traffic speedometer, traffic warning sign, street name brand (road sign), trestle wharf, approach bridge pier, road head, damaged code Head, bollard, compass correction bollard, dock, slipway, boat, radar, radio, pilot station, pilotage, hulk, helicopter Aircraft apron, submarine cable, cable, gas pressure regulating station, pipeline indicator pile, medium water maintenance well hole, public security inspection well hole, assist curve, Sketch contour, local average sea surface, dry height, wind and sand fixed grid, rock wall, debris flow, lava flow, shore ridge, ridge, white Representation of land, stubble land, bare land, etc.; ---Add or modify satellite positioning level points, hanging corner buildings, gallery rooms (rides), floating buildings, farms, door tops, rain covers, corridors, corridors, etc. Definition or description of matter; ---Modified buildings, suspended corridors, greenhouses, greenhouses, fences, stadiums, milestones, etc., adjusted the house level notes The typeface of the font and the name of the resident’s place are large; the entrances and exits of the subway station and the slides are transferred from the residential facilities to the transportation category; --- Supplementary and complete the graphical representation of the symbols of rivers, houses, rafts and dykes and comprehensive indicators; --- Deleted other roads, cable rivers and other symbols and Appendix C "topographic map framing and numbering". This part is proposed by the National Bureau of Surveying and Mapping Geographic Information. This part is under the jurisdiction of the National Geographic Information Standardization Technical Committee (SAC/TC230). This section drafted by. National Surveying and Mapping Geographic Information Bureau Surveying and Mapping Standardization Institute, Beijing Surveying and Mapping Design Institute, construction comprehensive survey Research Design Institute Co., Ltd. The main drafters of this section. Ma Xiaoping, Ma Congli, Zhang Jing, Chen Yu, Wang Dan, Huang Jian, Zhao Xin. The previous versions of the standards replaced by this section are. ---GB 7929-1987, GB/T 7929-1995; ---GB/T 20257.1-2007. National basic scale map schema Part 1. 1.500 1.1000 1.2000 Topographic map1 ScopeThis part of GB/T 20257 specifies various features and geomorphological elements represented on the topographic maps of 1.500, 1.1000, and 1.2000. Symbols, notes, and outlines, and the methods and basic requirements for using them. This section applies to the mapping of 1.500, 1.1000, 1.2000 topographic maps. Prepare a geographical base map or map a similar scale map Can be used for reference.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 13989 national basic scale topographic map framing and numbering3 General regulations3.1 Classification of symbols 3.1.1 Scale symbol. The scale symbol of the feature can be scaled according to the scale symbol. 3.1.2 Semi-scale symbol. After the scale is reduced by the scale, the length can be scaled and the width cannot be expressed by the scale. number. Only the width dimension values are marked next to the symbols in this section. 3.1.3 Not according to the scale symbol. After the scale is reduced by the scale, its length and width cannot be expressed by scale. Beside the symbol in this section Dimension symbol length and width size values. 3.2 Symbol size 3.2.1 The size values marked with numbers next to the symbols are in millimeters (mm). 3.2.2 Only one dimension value is placed next to the symbol, indicating the diameter of the circle or circumcircle, the length of the equilateral triangle or the square; the two size values are For the column, the first number indicates the height of the main part of the symbol, the second number indicates the width of the main part of the symbol; the number of one end of the line symbol Word, single line refers to its thickness, and two parallel lines refer to the width of the line (the street refers to the width of the blank part). Special symbol on the symbol The size value of the note is indicated by a dotted line. 3.2.3 The thickness of the symbol line, the length of the line segment and the angle of the intersecting line segment, etc., are not marked with the symbol of this figure. general In the case, the line is thicker to 0.15 mm, the diameter of the point is 0.3 mm, and the line length of the non-main part of the symbol is 0.5 mm, and the non-vertical intersecting line segment The angle is 45° or 60°. 3.3 Symbol positioning 3.3.1 There is a point in the symbol graph, which is the physical center position of the feature. 3.3.2 Symbols such as circles, squares, and rectangles, and the positioning point is at the center of its geometry. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 20257.1-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 20257.1-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 20257.1-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 20257.1-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 20257.1-2017?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 20257.1-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |