GB/T 20130-2025 English PDFUS$379.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 20130-2025: Self-shielding electron beam facility for radiation processing Status: Valid GB/T 20130: Historical versions
Basic dataStandard ID: GB/T 20130-2025 (GB/T20130-2025)Description (Translated English): Self-shielding electron beam facility for radiation processing Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F92 Classification of International Standard: 27.120.99 Word Count Estimation: 18,158 Date of Issue: 2025-04-25 Date of Implementation: 2025-11-01 Older Standard (superseded by this standard): GB/T 20130-2006 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 20130-2025: Self-shielding electron beam facility for radiation processing---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS 27.120.99 CCSF92 National Standard of the People's Republic of China Replaces GB/T 20130-2006 Self-shielded electron beam radiation processing device Released on 2025-04-25 2025-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of contentsPreface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Device composition and working conditions 2 5 Technical Requirements 3 6 Test methods 5 7 Inspection Rules 9 8 Marking, packaging, transportation, accompanying documents and storage 10 Reference 12 Figure 1 Schematic diagram of reference point and reference surface 2 Figure 2 Schematic diagram of Faraday cup measurement 6 Figure 3 Schematic diagram of direct average current measurement method 7 Figure 4 Schematic diagram of dosimeter method for measuring scanning non-uniformity 8 Table 1 Test conditions 5 Table 2 Inspection items for self-shielded electron beam radiation processing equipment 9ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 20130-2006 "Self-shielded electron beam disinfection and sterilization device". Compared with GB/T 20130-2006, In addition to structural adjustments and editorial changes, the main technical changes are as follows. a) The scope of application of the standard has been changed (see Chapter 1, Chapter 1 of the.2006 edition); b) Added the terms and definitions of “radiation processing” and “electron beam radiation processing device” (see 3.2 and 3.3); c) Changed the terms and definitions of "reference plane", "beam intensity", "beam power", "beam scanning non-uniformity" and "beam scanning width" (See 3.4, 3.6, 3.7, 3.8, 3.9, 3.2, 3.4, 3.5, 3.8, 3.7 of the.2006 edition); d) The term and definition of “energy instability” have been deleted (see 3.6 of the.2006 edition); e) Changed "beam device", "monitoring and control system" and "shielding system" (see 4.1.1, 4.1 of the.2006 edition); f) Deleted "Device model name" (see 4.2 of the.2006 edition); g) "Environmental conditions" has been changed (see 4.2.1, 4.3.1 of the.2006 edition); h) "Power supply conditions" have been changed (see 4.2.2, 4.3.2 of the.2006 edition); i) "Working methods" has been deleted (see 4.4 of the.2006 edition); j) "Appearance" has been changed (see 5.1, 5.1 of the.2006 edition); k) "Control system" has been changed (see 5.2, 5.2 of the.2006 edition); l) "Performance indicators" have been changed (see 5.3, 5.3 of the.2006 edition); m) "beam energy" has been changed (see 5.3.1, 5.3.1 of the.2006 edition); n) "Beam intensity" has been changed (see 5.3.2, 5.3.3 of the.2006 edition); o) "Beam intensity instability" has been changed (see 5.3.3, 5.3.2 of the.2006 edition); p) "Beam power" has been changed (see 5.3.4, 5.3.4 of the.2006 edition); q) "Scan width" was deleted (see 5.3.5 of the.2006 edition); r) "Beam scanning non-uniformity" has been changed (see 5.3.5, 5.3.6 of the.2006 edition); s) "Electrical safety" has been changed (see 5.4, 5.4 of the.2006 edition); t) "Radiation safety" was changed (see 5.5, 5.5 of the.2006 edition); u) Deleted the requirement of “ozone dilution emission” (see 5.6 of the.2006 edition) v) Changed “Operation requirements”, “Start-up”, “Resume startup” and “Stable operation” (see 5.6, 5.7 of the.2006 edition); w) Changed "Complete machine performance test" (see 6.4, 6.4 of the.2006 edition); x) "Beam energy" has been changed (see 6.4.1, 6.4.1 of the.2006 edition); y) "Beam intensity" was changed (see 6.4.2, 6.4.3 of the.2006 edition); z) "Beam intensity instability" was changed (see 6.4.3, 6.4.2 of the.2006 edition); aa) "Beam power" has been changed (see 6.4.4, 6.4.4 of the.2006 edition); bb) "Beam scanning non-uniformity and scanning width" was changed (see 6.4.5, 6.4.5 and 6.4.6 of the.2006 edition); cc) "Inspection classification" has been changed (see 7.1, 7.1 of the.2006 edition); dd) The “Judgment Rules” were modified (see 7.3, 7.3 of the.2006 edition); ee) The content of the product certificate has been changed (see 8.4.2, 8.4.2 of the.2006 edition). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Nuclear Instrumentation Standardization Committee (SAC/TC30). This document was drafted by. China Institute of Atomic Energy and Nuctech Technology Co., Ltd. The main drafters of this document are. Xiang Yihuai, Wang Guobao, Zhang Lifeng, Zhu Zhibin, Cui Aijun, Qin Cheng, Yu Guolong, Liu Yilu, Yang Lu, Qin Huaili, Chen Zhiqiang. This document was first published in.2006 and this is the first revision. Self-shielded electron beam radiation processing device1 ScopeThis document specifies the composition, working conditions, technical requirements, inspection rules, and marking, packaging and The contents of the test include transportation, accompanying documents, storage, etc., and the corresponding test methods are described. This document is applicable to self-shielded electron beam radiation processing equipment with electron beam energy of 0.5MeV~5MeV (hereinafter referred to as "equipment" (“Set”).2 Normative referencesThe contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 191 Pictorial markings for packaging, storage and transportation GB/T 9969 General principles for instructions for use of industrial products GB/T 16841 Dosimetry Guidelines for Electron Beam Radiation Processing Equipment with Energy from 300keV to 25MeV GB 18871 Basic Standard for Ionizing Radiation Protection and Radiation Source Safety GB 19517 National Electrical Equipment Safety Technical Specifications GB/T 25306 General specification for electron accelerator engineering for radiation processing HJ979 Radiation safety and protection of electron accelerator irradiation devices3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Self-shielding The shielding body of the device can reduce the leakage dose of X-rays generated by the electron beam hitting the irradiated object or absorber without additional The dose can be reduced to below the prescribed limit under shielding conditions. 3.2 Radiation processing A process in which ionizing radiation acts on matter to make its quality or performance meet the expected requirements. 3.3 A device that generates, accelerates, and extracts electron beams for radiation processing. 3.4 Reference plan In the rectangular coordinate system, the plane composed of the X and Y axes is shown in Figure 1. Note. In this document, the distance between the reference surface and the electron beam output window is specified as 1 cm to 15 cm. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 20130-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 20130-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 20130-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 20130-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 20130-2025?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 20130-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |