GB/T 19869.2-2012 English PDFUS$509.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19869.2-2012: Welding procedure qualification test for aluminum and its alloys Status: Valid
Basic dataStandard ID: GB/T 19869.2-2012 (GB/T19869.2-2012)Description (Translated English): Welding procedure qualification test for aluminum and its alloys Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J33 Classification of International Standard: 25.160.10 Word Count Estimation: 22,275 Quoted Standard: GB/T 2651-2008; GB/T 2653-2008; GB/T 3323-2005; GB/T 16475-2008; GB/T 16672-1996; GB/T 19805-2005; GB/T 19866-2005; GB/T 19867.1; GB/T 19868.4-2005; GB/T 22087-2008; GB/T 24598-2009; GB/T 26955-2011; GB/T 27551-2011; ISO/TR 17671-4-2002 Adopted Standard: ISO 15614-2-2005, MOD Regulation (derived from): National Standards Bulletin No. 28 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the aluminum and aluminum alloy welding procedure qualification test methods and requirements. This standard applies to aluminum and aluminum inert gas shielded arc welding and plasma arc welding. Other aluminum welding technology GB/T 19869.2-2012: Welding procedure qualification test for aluminum and its alloys---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS25.160.10 J33 National Standards of People's Republic of China Aluminum and aluminum alloy welding technology assessment test (ISO 15614-2.2005, Specificationandqualificationofweldingprocedure Part 2. Arcweldingofaluminumanditsaloys, MOD) Issued on. 2013-03-01 2012-11-05 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsPreface Ⅰ 1 Scope 1 2 Normative references 1 3 welding process pre-procedure (pWPS) 1 4 welding procedure qualification 1 5 Specimen 2 5.1 General principles 2 5.2 specimen shape and size 2 5.3 welding test pieces 4 6 Test and inspection 4 6.1 Test Content 4 6.2 specimen sampling position 5 6.3 NDT 7 Destructive testing 7 6.4 6.5 Eligible Level 9 6.6 Retest 9 7 scope of accreditation 10 7.1 Overview 10 7.2 Conditions manufacturer on 10 7.3 Conditions and materials related to 10 13 7.4 General rules for welding process Particular requirements for different welding methods 14 7.5 8 welding procedure qualification report (WPQR) 14 Appendix A (informative) Welding procedure qualification report format (WPQR) 15 Annex B (informative) aluminum and aluminum alloy material classification guide 18ForewordThis standard rule according to GB/T 1.1-2009 given draft. This standard uses redrafted Law Amendment uses ISO 15614-2.2005 "metallic materials and welding procedure qualification of welding technology assessment Setting test - Part 2. Arc welding of aluminum and its alloys "(in English). This standard ISO 15614-2.2005 and its main technical difference between the following reasons. --- Clear all kinds of imperfections qualified grade requirements in order to operate; --- Add additional tests dissimilar aluminum joint assessment to meet the needs assessment; The format and content --- Process Evaluation report combined with our practical application have been adjusted to facilitate the implementation. For ease of use, this standard at the time of conversion to international standards made the following editorial changes. --- Deleted international standards foreword; --- The ISO 15614-2. ISO 2005 standards referenced in place of using the corresponding standard. This standard by the National Standardization Technical Committee welded (SAC/TC55) and focal points. This standard was drafted. Harbin Welding Institute, Harbin Welding Training Institute, Shandong cable force in the welding consumables Co., Ltd., Jiangsu Wire Co., Ltd. Jiang. The main drafters of this standard. Pudong Guang, Wang Lin, Chang Yong Guan, Ji Wenbin, Wang Kenan, Su Golden. Aluminum and aluminum alloy welding technology assessment test1 ScopeThis standard specifies the welding procedure qualification test methods and requirements for aluminum and aluminum alloys. This standard applies to aluminum and aluminum alloys inert gas shielded arc welding and plasma arc welding. When assessing other aluminum welding process may also refer to the relevant requirements of this standard.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated edition applies to this article Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2651-2008 welded joint tensile test method (ISO 4136.2001, IDT) GB/T 2653-2008 welded joints bend test (ISO 5173.2000, IDT) GB/T 3323-2005 metal fusion welded joints radiography GB/T 16475-2008 aluminum and aluminum alloy deformed state code (ISO 2107.2007, MOD) GB/T 16672-1996 Welds - Working positions tilt and swivel definition (idtISO 6947.1990) GB/T 19805-2005 welding operators Skill Evaluation (ISO 14732.1998, IDT) GB/T 19866-2005 welding procedures and general principles of assessment (ISO 15607.2003, IDT) GB/T 19867.1 arc welding procedure GB/T 19868.4-2005 pre-production welding procedure qualification test (ISO 15613.2004, IDT) GB/T 22087-2008 aluminum and aluminum alloy welding joint quality levels for imperfection (ISO 10042.2005, IDT) GB/T 24598-2009 fusion welding of aluminum and aluminum welding skills assessment (ISO 9606-2.2004, MOD) GB/T 26955-2011 metallic materials Destructive tests on welds welds macroscopic and microscopic examination (ISO 17639.2003, MOD) GB/T 27551-2011 metallic materials Destructive tests on welds fracture test (ISO 9017.2001, IDT) ISO /TR17671-4.2002 Recommended welding process welding of metallic materials - Part 4. Arc welding of aluminum and its alloys (Welding- Recommendationsforweldingofmetalicmaterials-Part 4. Arcweldingofaluminiumandaluminium aloys) 3 Pre-welding procedure process (pWPS) Pre-procedure preparation welding process can refer to the relevant requirements of GB/T 19866 in.4 welding procedure qualificationWelding and test specimens shall conform to the requirements of Chapter 6 and Chapter 7. To meet the requirements under the relevant test prerequisite, according to the standard welding procedure test and qualified welders or welding operators can Depending on its qualified GB/T 24598 or GB/T 19805 requirements. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19869.2-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 19869.2-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 19869.2-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19869.2-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |