GB/T 18208.4-2011 English PDFUS$1059.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18208.4-2011: Post-earthquake field works -- Part 4: Assessment of direct loss Status: Valid GB/T 18208.4: Historical versions
Basic dataStandard ID: GB/T 18208.4-2011 (GB/T18208.4-2011)Description (Translated English): Post-earthquake field works -- Part 4: Assessment of direct loss Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: P15 Classification of International Standard: 91.120.25 Word Count Estimation: 48,465 Date of Issue: 2011-12-30 Date of Implementation: 2012-03-01 Older Standard (superseded by this standard): GB/T 18208.4-2005 Quoted Standard: GB/T 18208.3-2011; GB/T 24335-2009; GB/T 24336-2009 Regulation (derived from): Announcement of Newly Approved National Standards No. 23 of 2011 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the direct earthquake damage assessment work content, procedures, methods and content of the report. This section applies to the earthquake disaster scene to carry out seismic direct loss assessments. GB/T 18208.4-2011: Post-earthquake field works -- Part 4: Assessment of direct loss---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Post-earthquake field works Part 4. Assessment of direct loss ICS 91.120.25 P15 National Standards of People's Republic of China Replacing GB/T 18208.4-2005 Seismic field work Part 4. Direct disaster damage assessment Part 4. Assessmentofdirectloss Issued on. 2011-12-30 2012-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsPreface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 earthquake disaster direct loss survey 2 5 earthquake casualties statistics and the number of homes lost an estimated 5 6 5 earthquake disaster direct loss report 7 earthquake direct economic losses 6 8 9 earthquake relief input costs 9 earthquake direct loss preliminary assessment 9 10 renewal of earthquake damage assessment 10 Summary and content of the report 10 11 Appendix A (normative) Calculation Parameters 11 Appendix B (normative) earthquake disaster direct loss survey 13 Annex C (normative) earthquake disaster direct loss Survey Form 19 Annex D (normative) Housing biography and earthquake disaster direct loss statements 22 Appendix E (normative) Content earthquake disaster direct loss assessment report 40 References 42ForewordGB/T 18208 "seismic field work" is divided into four parts. --- Part 1. Basic requirements; --- Part 2. Safety assessment of buildings; --- Part 3. Rules for investigation; --- Part 4. Direct disaster damage assessment. This section GB/T Part of 418,208. This section drafted in accordance with GB/T 1.1-2009 given rules. This Part replaces GB/T 18208.4-2005 "earthquake field works - Part 4. Direct disaster damage assessment." This section compared with the GB/T 18208.4-2005, mainly in the following changes. a) Amendment of the four terms and definitions. "earthquake disaster direct loss", "earthquake disaster direct economic loss", "replacement cost" and "Earthquake The number of homes lost "; b) an increase of three terms and definitions. "Urban District Assessment", "Rural Appraisal District" and "high-grade decoration earthquake direct economic loss"; c) increasing the reported earthquake disaster direct loss statements work requirements, including the industry and gives system, lifeline systems, enterprise And engineering structures, facilities, equipment earthquake disaster direct loss of 18 cultural relics and other reports; d) assessment of urban areas, an increase in high-grade decoration earthquake direct economic loss assessment work requirements and technical content, and in the appendix Given the experience of the range of relevant parameters; e) Modify the loss of houses destroyed than at "grave breaches" of the upper limit, given interval values; an increase of some broken lifeline engineering Interval bad loss ratio range, and gives interval value; f) an increase of two questionnaires casualties and defines a missing person; g) The original 14 Appendix reclassified consolidated into five appendices, and revised the Appendix E of earthquake damage assessment reports content; h) some provisions of the original standard has been revised, and all the original standard survey forms to re-perfect design. This part is proposed by the China Seismological Bureau. This part of the National Standardization Technical Committee earthquake (SAC/TC225) centralized. This section drafted by. Institute of Engineering Mechanics, China Earthquake Administration, Xinjiang Seismological Bureau, Hubei Provincial Seismological Bureau, Yunnan Province Earthquake bureau. The main drafters of this section. Sun Botao, Yuan Yifan, Miao Chong Gang, Song Lijun, Guoen Dong, Qi Lin are, so heart Zhang, Sun Jingjiang, Daijun Wu, Chen Hongfu, Qin Xiaojun, Zhou whole. This section was first released on March 28, 2005, this revision is the first revision.IntroductionGB/T 18208.4-2005 Since the promulgation and implementation of government departments, social organizations and the international community in the implementation of earthquake emergency rescue, Humanitarian assistance, post-earthquake reconstruction and mitigation decision-making have played an important role. As in recent years, China's economy faster Speed \u200b\u200bdevelopment, construction, infrastructure and the number of major projects in the city increased year by year, increasing new structure, composed of earthquake damage Has changed a lot, at the same time, people connotation earthquake disaster losses have a deeper understanding. Therefore, it is necessary to be revised. This revision is based on practical experience since GB/T 18208.4-2005 embodiment accumulated in recent years and the earthquake at home and abroad Inspection data, in particular carried out on the basis of the Wenchuan earthquake damage assessment field work practice, the purpose is to further improve and standardize Direct earthquake disaster damage assessment field work. Seismic field work Part 4. Direct disaster damage assessment1 ScopeGB/T 18208 provisions of this part of the direct earthquake damage assessment work content, procedures, methods and content of the report. This section applies to the earthquake disaster in the earthquake scene to carry out a direct assessment of losses.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the edition are not applicable to the present file. For undated references, the latest edition (including any amendments) applies to this document. GB/T 18208.3-2011 earthquake field works - Part 3. Rules for investigation GB/T 24335-2009 building (structure) building materials Classification of earthquake damage GB/T 24336-2009 Lifeline Engineering classification of earthquake damage3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Earthquake direct loss earthquake-causeddirectloss Personnel casualties caused by the earthquake, the earthquake disaster relief and direct economic losses of input costs. 3.2 Earthquake direct economic losses of earthquake-causeddirecteconomicloss Earthquake (including ground motion, seismic and geological disasters - earthquake disaster) caused by buildings and other engineering structures, facilities, equipment, goods, etc. Items damaged economic losses. 3.3 Earthquake Relief input costs costforearthquakedisasterrelief Fees earthquake relief inputs, including labor, materials, transportation, communication facilities repair, repair of power facilities, medical drugs, anti-sterilization Plague, bury, debris removal and temporary relocation of staff and other expenses. 3.4 Replacement cost replacementcost Based on the current price of items by local, pre-earthquake reconstruction and the same size and standard of housing and other engineering structures, facilities, equipment, goods, etc. Required fee. 3.5 Earthquake earthquakedisasterarea After the earthquake, people's lives and property damage, economic development area has been destroyed. 3.6 Earthquake disaster area extremeearthquakedisasterarea Direct loss suffered the worst earthquake disaster area, excluding no direct impact on social and economic earthquake geological disasters in the region. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18208.4-2011_English be delivered?Answer: Upon your order, we will start to translate GB/T 18208.4-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 18208.4-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18208.4-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 18208.4-2011?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18208.4-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |